• Title/Summary/Keyword: Lake Sapgyo

Search Result 11, Processing Time 0.029 seconds

Water Quality Management Planning for the Lake Sapgyo by Stream Grading Method (하천등급화 모델을 이용한 삽교호 수질관리 방안에 관한 연구)

  • Choi, Jeongho;Kim, Hongsu;Cho, Byunguk;Park, Sanghyun;Lee, Mukyu
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.3
    • /
    • pp.245-254
    • /
    • 2020
  • Water quality improvement projects are being implemented without predicting the effect of water quality improvement on Lake Sapgyo. As the method of selecting the target stream for the effective conduct of water quality improvement projects the method of rating the streams were studied. To build a stream grading method, 60 major streams in the Lake Sapgyo system were monitored. The selection method of rivers subject to priority management for water quality improvement was applied to the stream grading method using the Analytic Hierarchy Process (AHP). The analysis of importance by site by stream grading method revealed the following: water quality (36.0%), flow (26.1%), travel load (13.4%), TMDL density (12.0%), TMDL (8.9%), and area (3.7%). The pollution level of the river was scored by using the stream grading method, and the ranking of 51 streams was calculated. Based on this, the group was classified into six grades (A-F). Among the groups, the F and E groups were selected as the priority management streams. Cheonan-Cheon (Cheonan City) was selected as the first stream to establish water quality improvement measures in the Lake Sapgyo system, and Seowoo-Cheon (Dangjin City) was selected as the second site, and Oncheon-Cheon (Asan City) was selected as the third site. Each local government is expected to improve the water quality improvement effect with limited resources when establishing and implementing water quality improvement measures for the streams (F group, E group) to be managed in this study.

Forecasting of changes in the water quality in Sapgyo-Lake in accordance with implementation of Total Water Pollutant Load Management System (수질오염총량관리제 시행에 따른 삽교호의 수질변화 예측)

  • Kim, Hongsu;Cho, Byunguk;Park, Sanghyun;Lee, Mukyu;Kim, Changgi;Choi, Jeongho
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.3
    • /
    • pp.209-223
    • /
    • 2019
  • Broadly speaking, in order to analyze the water quality improvement effects of the implementation of the Total Water Pollutant Management System in the Sapgy-Lake waterways, a reference was made to the [Plans for implementation of the Total Maximum Daily Load(TMDL)] in 3 cities (Cheonan, Asan, Dangjin). The results of the investigation into the plans to reduce the pollutant load show in that region show that there are plans to reduce pollution for a total of 16 reduction facilities. As for the result of the computation of the reduction in the load, these measurements were computed at the Gokgyo-stream basin and Namwon-stream basin, with BOD and T-P at the Gokgyo-stream basin reduced by 13.9 % and 13.3 %, respectively, while BOD and T-P at the Namwon-stream were reduced by 3.7 % and 3.3 %, respectively. In this way, thus using the results of the water quality forecast of Sapgyo-Lake in measures for the improvement of water quality (in accordance with the implementation of the TMDL), and using the QUAL-MEV model and EFDC model, it is noted that BOD will be improved by 26.4 % from 6.1 mg/L to 4.5 mg/L 0.0 %, T-P by 36.7 % from 0.168 mg/L to 0.107 mg/L and TOC by 26.4 % from 7.7 mg/L to 5.6 mg/L. However, it is forecasted that the targeted standards for the medium influence area will not be achieved. Evidently, Gokgyo-stream and Namwon-stream have been implementing the Total Water Pollutant Management System for the BOD items since January 1, 2019, but the Sapgyo-stream and Muhan-stream were excluded from being designated as subject regions. As such, it is noted now that it is necessary to implement the TMDL for the entire Sapgyo-Lake water systems including Sapgyo-stream and Muhan-stream in order to improve the water quality of Sapgyo-Lake, and likewise the T-P should be designated as the substance subjected to management in addition to BOD.

Dissolved Oxygen Trend in Sapgyo Stream Watershed (삽교천유역의 용존산소 추세)

  • Rim, Chang-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.6
    • /
    • pp.667-681
    • /
    • 2013
  • In this study, monthly and seasonal dissolved oxygen trends of 19 water quality measurement stations in Sapgyo stream watershed were analyzed using monthly dissolved oxygen (DO) data measured for 16 years (1995~2010). Mann-Kendall trend test and Sen's slope estimator were carried out for trend analysis. Furthermore, Sapgyo stream watershed was divided into four different sections (Sapgyo stream, Muhan stream, Gykgyo stream, and Sapgyo lake) and chi-square test of homogeneity for DO trend was carried out for four different sections. The study results indicated that most of water quality measurement stations showed increasing or non-significant trend of DO on a monthly and seasonal basis. The chi-square test of homogeneity for each water quality measurement station showed the statistical homogeneity in seasonal DO trend; however, the test results showed the statistical non-homogeneity in monthly DO trend for the stations located in the reservoir. Overall, the dissolved oxygen trend in each water quality measurement station showed different patterns depending on the location of each station and season.

Bacterial Diversity and its Phylogenetic Analysis in Lake Sapgyo (삽교호의 세균 다양성과 계통분류학적 분석)

  • Kim, Myeong;Jeon, Eun-Hyeong;An, Tae-Yeong
    • Korean Journal of Microbiology
    • /
    • v.39 no.4
    • /
    • pp.272-276
    • /
    • 2003
  • Sapgyo Lake is an artificial freshwater reservoir which is located to the midwest of Korea and is the main water reservoir for industry and agriculture of the region. In this study we investigated environmental factors and the change of bacterial community with the influence of surrounding inflow water and the seasonal variation using the molecular ecological approach. Water samples were collected at front of the dike in May and August, 2001. Bacterial genomic DNAs were extracted directly and purified for the amplification of bacterial 16S rDNA. Clone libraries of the 16S rDNA were constructed using pGEM-T easy vector and RFLP analysis was performed to make a group as OTUs with 4 base recognizing enzymes (MspI and HaeIII). The estimated values of richness in August sample was higher than in May. Thirty-three of 153 clones in May and thirty-eight of 131 clones in August were sequenced from forward region of bacterial 16S rDNA for about 600~800 bp. Proteobacteria, Cytophaga, gram positive bacteria and Verrucomicrobia were observed both months. Especially, Planctomyces, cyanobacteria and chloroplast appeared in August when algal bloom occurred. On the whole investigation, Sapgyo lake showed a typical community structure of estuarine and was influenced by heterochthonous organic matters from the surrounding stream.

Estimation of Pollution Using Load Duration Curves at Streams in Sapgyo Watershed (부하지속곡선을 이용한 삽교호수계 지류하천의 오염원인 분석)

  • Cho, Jeongho;Kim, Hongsu;Cho, Byunguk;Park, Sanghyun;Lee, Mukyu;Lee, byeonggu
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.3
    • /
    • pp.175-189
    • /
    • 2021
  • In this study, 48 streams in the Sapgyo Watershed were selected, and the Load Duration Curves (LDC) were drawn up for each stream using water quality and flow monitoring over the last three years (2018-2020), and it was evaluated whether the target water quality was achieved for each flow section. As a result of evaluating whether or not the target water quality exceeded according to the LDC, it was found that 22 rivers exceeded the target water quality. Five rivers exceeded the target water quality due to point pollutant sources, 13 rivers exceeded the target water quality due to non-point pollutant sources, and 4 rivers exceeded the target water quality due to both point and non-point pollutant sources. Among the rivers that exceeded the target water quality due to point pollutant sources, which included domestic sewage of the untreated population, there is a need to reduce the influx of polluted loads by the untreated population. The use of eco-friendly fertilizers is recommended for rivers with a relatively high farmland ratio among rivers exceeding the target water quality due to non-point pollutant sources, and installation of boiling point reduction facilities that can reduce the amount of polluted load introduced during rainfall or manage water shores. In rivers with a large number of livestock breeding heads, the livestock houses located in these rivers need to be preferentially transferred to livestock manure treatment plants. Due to the high ratio of land area because of urbanization, initial rainwater treatment facilities are required to reduce the amount of pollutant load flowing into the river through the impermeable layer during rainfall.

Determination of Representative Long-term Water Quality Parameters of the Streams in Estuarine Lake (하구호 유입하천의 유역특성에 따른 장기 대표 수질절정)

  • Kim, Young-Chul;Lee, Dong-Ryul;Hwang, Gil-Son
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.3
    • /
    • pp.262-272
    • /
    • 2005
  • This study was undertaken to obtain design concentrations for the natural system treating stream water flowing into estuarine lake(Sapgyo). This lake has three major, so called, national-class streams: one is Gokgyo flowing through two medium-size municipal areas and the others are Muhan and Sapgyo placed in mostly rural area nested with some small towns. The results of three year's investigation showed big changes in water quality during the period between dry and wet seasons. Nitrogen concentration usually decreases as the flow rate increases. The change of phosphorus concentration in Gokgyo was the same pattern as nitrogen, but in other two streams it was inversely related with flow rates. This is probably due to the chemical property of the particles washed out from the different stream basins during wet season. It was found that about 40 to 60% of the total nitrogen are in soluble form and on average, 35% of the total phosphorus consists of dissolved-P. Representative concentration of these streams has to be separately determined based on dry and wet season. TDS and SS could be indicating parameters useful to depict and characterize a change of water quality with respect to flow rate because their measurement is easy and also includes a small analytical error. TDS values measured during dry season are related with high nitrogen concentration while during wet season, SS values effectively reflect a high concentration of phosphorus. For design purpose, cumulative concentration distribution graph presented in this paper can be directly or indirectly applied to other streams through a brief comparative and verificative study.

Analysis of the Implementation Effect of Total Water Load Management System Using Load Duration Curves in Sapgyo Watershed (부하지속곡선을 이용한 삽교천 유역의 오염총량관리제도 시행효과 분석)

  • Lee, Eunjeong;Kim, Taegeun
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.6
    • /
    • pp.536-548
    • /
    • 2019
  • In order to quantify the effect of the newly established the Total Water Load Management System in Sapgyo watershed, this study predicted the achievement of the target water quality at each unit watershed and the water quality according to the flow section. The HSPF model, which is the watershed runoff model, was constructed and operated based on 2015, and the water quality was predicted by inputting the loads in final target year(2030). The Load Duration Curve (LDC) was created using the simulated results of base year and target year. As a result of plotting water quality by flow conditions, it was simulated to be close to the BOD target with a difference of 0.1 ~ 0.2 mg/L in all three watersheds during the mid-range flow interval (40 ~ 60%). In case of T-P, although the target water quality was not set, the water quality was improved by Cheonan A 46%, Kokgyo A 29% and Namwon A 25%. The Muhan and Sapgyo river basins meet the target grade of middle-watershed standards. The improvement effect will be positive, as water quality, which achieves the target of Total Load Management System and the target grade of the middle-watershed standards will be expected to flow into the Sapgyo lake.

The Mineralogical Characteristics on the Polder Soils Development from Alluvio-marine Deposits near to Sapgyo-lake (삽교천유역의 하해혼성충적층에서 발달된 토양의 광물학적 특성)

  • Zhang, Yong-Seon;Um, Myung-Ho;Jung, Pil-Kyun;Shin, Jae-Sung
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.33 no.6
    • /
    • pp.377-383
    • /
    • 2000
  • The composition of primary minerals of sand fractions and secondary minerals of clay fractions were investigated on the polder soils developed from alluvio-marine deposits near to Sapgyo-lake, constructed a sea dike across river estuary located in the west coast. The effects of a topographical sequence on the physico-chemical properties and mineralogical characteristics were evaluated using XRD, DTA, and TG with the chemical composition of $H^+$ saturated clays. Soils located on the seashore side were more silt fraction, higher pH and exchangeable cations than the others. The dominant minerals of soil parent materials are in the order of quartz, feldspars, micas, chlorite and amphibole. According to the greater distance from the lake, the amount of 1:1 minerals increased, but 2:1 minerals decreased. The dominant clay minerals of polder soils are kaolinite, vermiculite and illite. Hydroxy interlayer minerals are abundant in the clay fractions derived from the soil parent materials which have relatively low soil pH.

  • PDF

Evaluation of LSTM Model for Inflow Prediction of Lake Sapgye (삽교호 유입량 예측을 위한 LSTM 모형의 적용성 평가)

  • Hwang, Byung-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.287-294
    • /
    • 2021
  • A Python-based LSTM model was constructed using a Tensorflow backend to estimate the amount of outflow during floods in the Gokgyo-cheon basin flowing into the Sapgyo Lake. To understand the effects of the length of input data used for learning, i.e., the sequence length, on the performance of the model, the model was implemented by increasing the sequence length to three, five, and seven hours. Consequently, when the sequence length was three hours, the prediction performance was excellent over the entire period. As a result of predicting three extreme rainfall events in the model verification, it was confirmed that an average NSE of 0.96 or higher was obtained for one hour in the leading time, and the accuracy decreased gradually for more than two hours in the leading time. In conclusion, the flood level at the Gangcheong station of Gokgyo-cheon can be predicted with high accuracy if the prediction is performed for one hour of leading time with a sequence length of three hours.

Methods for Flood Runoff Analysis of Main Channel Connected with Interior Floodplain : II. Application for Analysis of Flood Runoff in Estuarine Lake (제내지와 하도를 연계한 하천유역의 홍수유출해석기법 : II. 하구호 유출해석에의 적용)

  • Jang, Su Hyung;Yoon, Jae Young;Yoon, Yong Nam;Kim, Won Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1B
    • /
    • pp.89-98
    • /
    • 2006
  • In this study, a method for flood runoff analysis in main channel connected with interior floodplain, is applied for evaluation of hydraulics of Sapgyo lake for the purpose of flood protection by considering tidal effect of West Sea and runoff from the watershed. Especially, operational condition of sluice gate was explicitly modeled in conjunction with various runoff scenarios from watershed. The change in hydraulics of main channel and interior floodplain was found to be predominantly affected by tidal effect, and explicit modeling of gate operation made possible the evaluation of hydraulic characteristics of different alternatives. Until now, such an analysis was not made due to the lack of models with such capability, however, with the proposed method, it is possible to perform such an analysis and is thought that the proposed method can be a valuable tool for flood protection planning.