Assessment of Project Cost Reduction Potential Adopting Cases-Synthetic Approach - Focused on the Apartment Building Construction Project - (시공방법 개선사례 조합에 의한 원가절감 가능성 평가)

  • Choi, Jong-Soo;Choi, Young-Jun;Chae, Seong-Tae;Yoo, Sung-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.135-144
    • /
    • 2009
  • The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.

The Analysis of Contract-Foodservice Operational Efficiency using Data Envelopment Analysis and Efficiency-Profit Matrix (다점포 운영 푸드서비스 기업의 효율성 측정에 관한 연구 - DEA 및 효율, 수익 매트릭스 분석을 중심으로 -)

  • Kim, Tae-Hee;Park, Ju-Yeon
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.20 no.5
    • /
    • pp.823-835
    • /
    • 2010
  • The research aimed to measure the efficiency of using multi stores in a foodservice company using by DEA (data envelopment analysis) which is a new management science technique. The study also attempted to identify relevant variables affecting DEA efficiency in order to suggest methods for improving efficiency. The data were collected from 148 contract foodservice operations, which were operated in similar fashion in October 2009. The DEA efficiency was calculated as an output-oriented BCC Model. Sales, and CSI (customer satisfaction index) were used as output variables whereas food cost, labor cost, and management expense were used as input variables to calculate the DEA efficiency. Operation process variables of the unit consisted of the were consist of ratio of regular employee, ratio of housekeeper, meal counts, meal price, food cost per meal, contract period, number of menu items, forecasting accuracy, order accuracy, inventory turnover, use of processed food, deviation of food cost, number of new menus, and number of events. According to the BCC score and profitability, units were classified into four groups: High efficiency-high profitability (HEHP), High efficiency-low profitability (HELP), Low efficiency-high profitability (LEHP), and Low efficiency-low profitability (LELP). The HEHP group contained 54 units, which mostly contracted management fee type and had a high meal price. The units were also very large and, served three meals. Twenty of the units were operated with high labor cost: most of these were factories and hospitals. The LEHP group contained 20 units, that were mainly office stores of large scale and medium price. Fifty-four LELP group had a low meal price. A high performance group must have high efficiency, profitability, and satisfaction. The BCC score was over 0.969, the meal price was over 4,116 won, the food cost was over 2,077 won, and meal counts per month were over 10,212 meals.

A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye (화성성역의궤 분석을 통한 조선시대 팔달문 건설 소요자원의 현대적 해석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.641-652
    • /
    • 2021
  • Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyouk-eugye, analysis and evaluation from the perspective of modern construction management were limited. Therefore, in this study, construction management related information such as time, cost, and manpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-mun was foundation work and masonry work, and the total construction period was 6 months, with the overall construction progressing very quickly. The total cost of the construction of Paldal-mun was about 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyang for labor cost. Converting these to present value, the material cost is about 1.1 billion won and the labor cost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan to conduct additional research in this area such as deriving detailed input manpower related to the work period for each type of work.

An empirical study on the economies of scale of hospital service in korea (우리나라 병원의 규모의 경제에 관한 연구)

  • 전기홍;조우현;김양균
    • Health Policy and Management
    • /
    • v.4 no.1
    • /
    • pp.107-122
    • /
    • 1994
  • Many alternatives have been discussed to reduce the medical expenditure and to use the medical resources effectively. Many studies about the economies of scale have been done for the last several decades. This study has analyzed the relationship between the number of beds and the mean expense per hospitalization day in Korea. A Cost Function Model was identified and we wanted to see the minimum optimal size with the cheapest mean expense per hospitalization day. The result is as follows; 1. In the Cost Function Mode, (the number of beds)$^{2}$, the number of personnel, productivity and training institutions are the factors that statisticaly influence the mean expenses. 2. By the univariate analysis the mean expense proved to be the smallest as the level of 150-200bed, The breaked down of the components of expenses shows that the mean labor cost is much different from the mean value of material and administration costs, and that hospital with 150-200 beds also have the minimal expense. The mean expense goes up dramatically in hospitals of 450 beds or more. 3. When the other conditions are constant, according to the multiple regression analysis of the mean expense per adjusted hospitalization day the minimum optimal size with the cheapest expense is a hospital with 191 beds and the hospital with 230 beds takes the lowest mean labor cost. The material or administration costs are not influenced by hospital size. This research has limitation in measuring the variables that influence hospital xpenses, in estimating hospital output by the number of beds in considering outpatient cost and in securing representativeness of hospitals because many hospitals made no responses to the research questionnare. But it is valuable and helpful for development of health policy to figure out the number of beds with the cheapest expense per hospitalization day.

  • PDF

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites (소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

Assessment of Productivity and Foodservice Management Practices in Elementary School Foodservices Located in Seoul and KangNung (서울.강릉지역 초등학교 급식소의 급식생산성 분석)

  • 김은경;김은미;강명희;홍완수
    • Korean journal of food and cookery science
    • /
    • v.14 no.1
    • /
    • pp.76-83
    • /
    • 1998
  • The purpose of this study was to evaluate the foodservice management practices and productivity in elementary schools in order to provide basic information for an efficient food service management. This approach was achieved using a variety quantitative and qualitative information including general foodservice management, managerial and operational factors, and the productivity in elementary school foodservice systems. The labor productivity in 28 school foodservice system was assessed and related to a number of influencing variables within the system. The productivity measurement was based upon the total meal equivalents as a ratio of the total direct and non-direct labor hours required to prepare these meals. Twenty-eight elementary schools located in Seoul and Kangnung were surveyed to get data for the variables. Questionnaire and a survey form were mailed. Statistical methods used in this study were descriptive analysis, $\chi$$^2$-test, 1-test and one-way ANOVA analysis. Elementary schools in Seoul were all located in urban areas, whereas elementary schools in Kangnung were in urban areas (40.0%), provincial areas (40.0%) and in isolated areas (20.0%). Total average number of meals including children and staff was 928.2${\pm}$ 650.0 with a yery significant difference (p<0.001) between Seoul and Kangnung. The average cost of school meal in Seoul and Kangnung were 1191.0 won and 1526.2 won, respectively. The result of Pearson Correlation analysis indicated that labor cost per meal, 1-week meal equivalents and meal equivalents per labor were significantly correlated with the productivity.

  • PDF

A Study on Mechanized System of Barley Harvesting (보리의 기계수확체계(機械收穫體系) 시험(試驗))

  • Kim, Jeung Soo;Lee, Dong Hyeon;Baek, Poong Ki;Jeung, Doo Ho
    • Journal of Biosystems Engineering
    • /
    • v.7 no.2
    • /
    • pp.36-44
    • /
    • 1983
  • Farm population was rapidly decreasing due to shift of the people from farm sector to the non-farm sector caused by the economic growth of the country. Especially, a great shortage of farm labor in busy farming period in June and October is becoming a serious problem in maintaining or promoting land productivity. The peak of labor requirement in summer is caused by rice transplanting and barley harvesting. In order to reduce the restrictions imposed on farm management by the concurrence of labor requirement and the lack of labor, the experimental study for mechanization of barley harvesting has been carried out in the fields. 1. The machines for barley harvesting were knap-sack type reapers, windrow reaper (power tiller attachment), binder and combine. The order of higher efficiency of machine for barley harvesting was combine, binder, windrow reaper (WR), knapsack type reaper 1(KSTR1), and knap sack type reaper 2(KSTR2; mist and duster attachment). 2. The ratio of grain loss for the manual, binder, and combine plot was about four percent of total field yield. 3. The total yield of barley in 35 days and 40 days harvesting after heading were 514 kg and 507kg per 10 ares respectively. The yield of 35 days-plot was higher than other experimental plots. 4. The lowest yield was recorded in 30 days-plot due to the large quantity of immatured grains and having lighter 1000-grain weight. The ratio of immatured grains was 2.66 percent and 1000-grain weight was 29.4 grams. 5. The total harvesting cost of the windrow reaper was 10,178 won per 10 ares. It was the lowest value compared to other machines. The next were combine, binder, KSTR1, KSTR2, and manual in sequence. As a result, the optimum time of barley harvesting for mechanization was 35-40 days after heading. Combine, binder, and windrow reaper were recommended as the suitable machines for barley harvesting in the work efficiency. However, in total harvesting cost, the windrow reaper was the most promising machine for barley harvesting.

  • PDF

An Analysis on the Labor Change Factor for Site Selection in Enactment and/or Revision of Construction Standard Production Unit (표준품셈 제·개정에 있어 실사현장 선정을 위한 품 변화요인 분석)

  • Shin, Won-Sang;Kim, Yong-Woo;Lee, Dong-Eun;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.11-12
    • /
    • 2011
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is difficult to reflect the various site attributed variation in productivity using existing CSPU. The reason is that a criteria which site should be selection for enactment and/or revision of CSPU is not established. This study aims to provide essential data to be used for analyzing the labor factors in a way to secure efficiency and reliability of CSPU.

  • PDF

A Study of Permanent Form System by Thin Precast Concrete Panel (II) (박판 프리캐스트 콘크리트 영구거푸집 시스템 연구 (II))

  • 남기룡;정문영;정문열;서치호;김윤일
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.749-754
    • /
    • 1997
  • Nowadays domestic building market has undergone several changes. Labor costs are too high and materials are in short supply. These raised building costs and therefore lowered productivity. At this point it is the best way to reduce manual labor and find alternative materials that can improve productivity. In the building process form work take the most part of it. So many formwork systems were developed to reduce the construction period and labor cost. But their technical improvements just limited to adjust form shape-the role of form is not changed. This research developed a new formwork systems that can function to unify or minimze the unit process with cast-in-place type permanent form. In former study (reported in '97 spring seminar), we did the assembling test with column and beam clamps. Furthermore, In this paper, we examined the total systems of form erections and evaluated the structural performances.