• Title/Summary/Keyword: Labor Costs

Search Result 572, Processing Time 0.03 seconds

A Study of the Decommissioning Cost Estimation for Nuclear Facilities (원자력 시설 해체비용 산정에 관한 고찰)

  • 이동규;정관성;이근우;오원진
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.06a
    • /
    • pp.85-96
    • /
    • 2004
  • This paper is to study on the decommissioning cost estimation for nuclear facilities of advanced nuclear organizations and countries for deriving the cost factors to be taken considerations into accomplishing decommissioning projects. Of cost categories producing the factors of decommissioning costs, dismantling and waste processing & disposals activities are examined to increase the its costs. Of labor, materials and other costs categories, labor costs are summarized to have overall majorities in the decommissioning cost factors. The main parameters of all factors affecting the decommissioning costs are analyzed as work difficulty, regional labor costs, peripheral cost, disposal cost and final burial costs.

  • PDF

Spatial Segmentation of the Intra-Metropolitan Local Labor Markets : A Theroetical Review

  • Kim, Jae-Hong
    • Journal of the Korean Regional Science Association
    • /
    • v.12 no.2
    • /
    • pp.37-57
    • /
    • 1996
  • Intra-metropolitan spatial segmentation of the labor marker requires barriers of mobility on both supply and demand side of the local labor marker. The phenomena of spatial segmentation of the labor market are particularly applied to the secondary workers rather than to the primary workers. Supply side barriers include the costs of obtaining job information regarding jobs outside of the immediate area, commuting costs, and barriers to residential mobility. Demand side barriers include site-specific technology and product demand, and discrimination. In this paper, I discuss these barriers and examine their implications for differences in segmentation by demographic and skill groups at the intra-metropolitan scale. In particular, I apply a job search model to examine supply side barriers such as information and commuting costs, and an implicit contract model to explain demand side barriers such as dual/internal labor market and firms' (re) location strategies.

  • PDF

Prediction of Labor Requirement and Cost of Pick-up Type Pulse Crop Harvester for Soybean and Red Bean Harvesting

  • Yoo, Soonam;Chang, Heesoo
    • Journal of Biosystems Engineering
    • /
    • v.39 no.4
    • /
    • pp.283-289
    • /
    • 2014
  • Purpose: This study was carried out to evaluate the labor requirement and the cost-reducing effects of the pick-up type pulse crop harvester compared with those of conventional harvesting for soybeans and red beans. Methods: The labor requirement and the cost to gather, thresh, and clean for conventional harvesting operations were surveyed; those for the pick-up type pulse crop harvester were estimated for soybeans and red beans. The annual capacity of the harvester and the break-even area of the two harvesting methods were also estimated. Results: For soybean harvesting, the labor requirement of 0.57 hour-persons/10 a for the pick-up type pulse crop harvester reflects a 91.9% reduction in the labor requirement of 7.00 hour-persons/10 a for conventional harvesting. Machinery costs of 51,300 won/10 a for the harvester were estimated for an annual harvesting area of 52.5 ha/year, representing a reduction of 33.3% from the 78,700 won/10 a cost of conventional harvesting. A break-even area of 28.4 ha was estimated for the two harvestings. For red bean harvesting, the labor requirement of 0.57 hour-persons/10 a for the harvester reflects a 92.6% reduction in the labor requirement of 7.66 hour-persons/10 a for conventional harvesting. For an annual harvesting area of 52.5 ha/year, annual capacity of 52.5 ha/year and machinery costs of 51,700 won/10 a were estimated for the harvester, reflecting a reduction of 44.7% in the cost of 93,500 won/10 a for conventional harvesting. A break-even area of 23.1 ha was estimated for the two harvestings. A governmental subsidy for purchasing the harvester could contribute to reducing the break-even area and harvesting costs. Conclusions: The pick-up type pulse crop harvester for soybean and red bean harvesting could reduce the labor requirement and costs of conventional harvesting, and a governmental subsidy for purchasing the harvester will improve the economics of the harvester for efficient mechanical harvesting.

An Economic Analysis of Oak Mushroom Cultivation in Korea (표고버섯 재배에 대한 경제성 분석)

  • Kim, Jae Sung;Joo, Rin Won;Choi, Soo Im
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.4
    • /
    • pp.401-407
    • /
    • 2007
  • This study analyzed an economic efficiency of oak mushroom cultivation in order to provide data needed for formulating related policies. 88 farmhouses in major producing areas were interviewed with. The average production cost per 100 bed-logs was 151,699 won. Among production costs, material costs accounted for 56.0% and labor costs 41.8%. Oak mushroom cultivation was labor-intensive and labor input was a significant factor determining the production costs. There was 3 7.2% gap in production costs between Chungbuk, the highest cost area and Gyeonggi, the lowest cost area of oak mushroom due to difference in labor input. Average revenue per 100 bed-logs was 178,627 won. Average income per 100 bed-logs, which is variable production costs of 116,613 won subtracted from the revenue, was 62,014 won and thus income rate was 34.7%. Income rate in Jeonbuk, the highest area, was higher than that in Gyeonggi, the lowest area, by 15.8% points due to difference in quantities produced, grade, and variable production costs, in particular, labor costs. The result of the economic analysis indicates that reduction in establishment and labor costs, accounting for the highest portion in production costs is priority issue for the enhancement of the competitiveness of the oak mushroom industry.

The Income and Cost Estimate for the Medical Clinic Services Based on Available Secondary Data (이차자료원을 활용한 의원 의료서비스 수입 및 비용 산출)

  • Kim, Sun Jea;Lim, Min Kyoung
    • Korea Journal of Hospital Management
    • /
    • v.26 no.1
    • /
    • pp.71-82
    • /
    • 2021
  • Purpose: The purpose of this study is to estimate incomes and costs of the medical clinics by using secondary data. Methodology: The medical incomes and costs were estimated from 405 clinics operated by sole practitioner providing out-patient services among all clinics subject to the Medical Cost Survey on National Health Insurance Patients in 2017, excluding dental clinics and oriental medical clinics. The incomes and costs of the medical clinics were reflected with incomes and costs of health insurance benefits and were calculated by types of medical services (i.e., basic care, surgery, general treatment, functional test, specimen test and imaging test). The costs were classified as follows: labor costs, equipment costs, material costs and overhead costs. Secondary data was used to estimate the incomes and costs of the medical clinics. For allocation bases for costs for each type of the medical service, the ratio of revenue from health insurance benefits by types of medical services was applied. However, labor costs were calculated with the activity ratio by types of medical services and occupations, using clinical expert panel data. Finding: The percentage of health insurance income for all medical income was 73.1%. The health insurance cost per clinic was 401,864 thousand won. Labor cost accounted for the largest portion of the health insurance income was 191,229 thousand won (47.6%), followed by management cost was 170,018 thousand won (42.3%), materials cost was 35,434 thousand won (8.8%), and equipment costs was 5,183 thousand won (1.3%). Practical Implications: This study suggests a method of estimating incomes and costs of medical clinic services by using secondary data. It could efficiently provide incomes and costs to assess an appropriate level of the health insurance fee to the clinics.

The Effects of the workforce Age Structure on Productivity or Labor Costs (사업체 근로자의 연령구성이 생산성과 인건비에 미치는 영향)

  • Kim, Ki-Min
    • Management & Information Systems Review
    • /
    • v.37 no.1
    • /
    • pp.123-138
    • /
    • 2018
  • In this paper, we use panel dataset from Korean linked worker-firm to analyse the effects of the workforce age structure on the productivity or labor costs. We measure 'labor productivity' as added value per capita, 'cost of labor' as labor cost per capita and estimate a dynamic panel model to study the effects of the workforce age structure on the productivity or labor costs. Empirical analysis results show that the workforce age structure is positively related to productivity and labor costs, but only up to the aged of 35-39. That is, we find that an increase in the proportion of younger workers or elder workers rather than the aged 35-39 has a negative effect on productivity and labor cost. In particular, the difference between the estimation coefficient of productivity and labor cost when the share of workers aged 50 or older is increased instead of the aged 35-39 is higher than the difference between the estimation coefficient of productivity and labor cost when the share of workers aged 30 or younger is increased instead of the aged 35-39. Our results exhibit that it is reasonable for firms to worry about declining productivity of elderly workers, whereas firms already used older workers efficiently, such as by adjusting their labor costs.

Dental implant bottom-up cost analysis (치과 임플란트 상향식(bottom-up) 원가산정)

  • Kim, Min-Young;Choi, Ha-Na;Shin, Ho-Sung
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.52 no.1
    • /
    • pp.18-26
    • /
    • 2014
  • Purpose: The purpose of this study was to estimate the cost of dental implant using the bottom-up approach with the current data from dental clinics. Materials and methods: In this study, direct and indirect costs required for each treatment were calculated using the bottom-up approach. In the bottom-up costing, the average monthly total cost of dental clinic includes labor and material costs, administrative expenses, medical malpractice costs, and opportunity costs of invested capital. For the dental implant cost components, those include direct costs (labor costs, laboratory costs, material costs, depreciation or other operating costs), indirect costs (administrative costs), and the opportunity costs of investment for dental clinic. Results: Dental implant costs of metal crown, porcelain crown and over-denture were 1,449,000 won, 1,583,000 won, and 2,471,000 won respectively. The proportion of cost components was as follows. The labor cost were 50%, and material, administrative and other cost were 33%, 15% and 2%, respectively. For direct, indirect and investment cost, the ratio were 83%, 15% and 2%, respectively. Conclusion: The labor costs were evaluated to comprise largest proportion (about 50%, 730,000 won). Dental implant cost using Bottom-up costing was 1,450,000 won for metal crown and 1,580,000 won for porcelain crown.

Factors Affecting Productivity for University Food Service Operations (대학급식소의 생산성 요인분석)

  • 조순희;홍성야
    • Korean journal of food and cookery science
    • /
    • v.14 no.4
    • /
    • pp.407-415
    • /
    • 1998
  • The objectives of this study were to analyze the factors that affect the productivity for university food services. In a survey involving four-year university dining centers throughout the country, and correlations among thriteen different variables that affect productivity were determined. Productivity index (PI) was determined by meals per hour, the average score for 38 institutions was found to be 14.2 meals/hour. For serving methods, the fixed ration had a higher PI than the self-serving. When two types of serving trays were considered, the PI of the compartmantalized trays was higher than that of the tray accompanying saparate small dishes. When single (S)-or. multiple(M)-menu was compared with the cafeteria style, a higher PI was obtained by the S-or M-menu. Among the three operation systems, the PI was found to be the highest by direct operation (17.6 meals/hour), followed by contract operation (11.1 meals/hour) and rent operation (7.9 meals/hour). For the factors that affect the productivity of the university food services, the total number sewed (r=0.54, p<0.001) and the use of convenient food items (r=0.28, P<0.05) exhibited positive correlations, while food costs and labor costs showed negative correlations. This suggests that the productivity of university food service increases as the total number served and the use of convenient food item increased, but decreases as the food costs and labor costs per meal increased. A regression analysis showed that three variables - total number sewed, labor cost per meal, number of employees-influenced about 73% components of food service showed a negative correlation with PI and a positive correlation with the labor cost per meal.

  • PDF

A Study on Management Performance and Efficiency of New Domestic Kiwi Fruit 'Gold' Growers (국산 참다래 골드 신품종 도입농가의 경영성과 및 경영효율성 분석)

  • Park, Jae-Hyoung;Chae, Yong-Woo;Park, Joo-Sub
    • Journal of Agricultural Extension & Community Development
    • /
    • v.23 no.2
    • /
    • pp.145-156
    • /
    • 2016
  • The purpose of this study is to analyze the farms growing domestic kiwi fruit 'Gold' on their management performance and efficiency in order to reduce the risks involved with introducing new kind of crops for growing, and suggest improvements. First, the result of analysis showed that domestic kiwi fruit 'Gold' growers' income were higher than the average growers due to the fruit's high unit price and productivity. Second, the analysis of management efficiency resulted in scale efficiency having greater impact on inefficiency rather than pure technical efficiency. As for the analysis of technical efficiency, the depreciation costs of agricultural facilities had the greatest influence on its inefficiency. Third, inefficient farms put in excessive inputs across the board, while labor costs(self labor cost + hired labor cost) were the largest factor of optimal inputs according to the models of technical efficiency and pure technical efficiency. Fourth, because of greater reliance on mechanical tools from rising labor costs, there's a need for individual farms to avoid buying farming equipments and instead share the equipments of nearby farms and agricultural cooperatives, or start renting agricultural machines from companies.

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF