해상에서의 LNG 생산을 위한 공정 고찰 (Study of Process for Offshore LNG Production)

  • 김승혁;하문근;김병우;;구근회
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2002년도 추계학술대회 논문집
    • /
    • pp.119-123
    • /
    • 2002
  • Liquefied Natural Gas(LNG) continues to attract modern gas industries as well as domestic markets as their main energy source in the recent years. This is mainly because LNG is inherently cleaner and more energy efficiency than other fuels. Offshore LNG production plant is of interest to many oil producing companies all over the world. This article discuss about the production process encountered while developing such a production facility. Typical offshore oil and gas processing required for oil stabilization and other optional units that can be added to the facilities. The production process can broadly be divided into five major units namely, (i) Oil Stabilization unit, (ii) Gas Treatment unit, (iii) Methane Recovery unit, (iv) Distillation unit and (v) LNG Liquefaction unit. The process simulation was carried out for each unit with a given wellhead composition. The topside facilities of offshore LNG production plant will be very similar to the process adopted in offshore processing platform along with the typical onshore LNG production plant. However, the process design problems associated with FPSO motion to be taken care of while developing floating LNG production plant.

  • PDF

LNG선 개조 발전플랜트 기획연구 (Planning research for Floating Power Plant by modifying LNG carriers)

  • 이강기;배재류;신재웅;박종복
    • 플랜트 저널
    • /
    • 제16권3호
    • /
    • pp.37-41
    • /
    • 2020
  • 최근 노후화된 LNG선박의 증가, 선박가격 하락으로 중고 LNG선 재활용 가능성이 증대되고 있다.또한 노후발전소 대체관련 Needs가 늘고 있으며 가스생산량 증가 및 친환경 연료가 각광받고 있어 가스 발전플랜트 매력도도 상승하고 있다. 이에 본 연구에서는 중고 LNG선을 개조하여 LNG저장 및 발전플랜트 기능을 갖추게 하고 이밖에 재기화기능,벙커링 기능을 갖춘 복합기능 플랜트에 대한 기획연구를 수행하였다.이를 통해 노후 화력발전 중단,원전해체 등으로 인한 에너지 공백을 대체하고 국가 위기사태에 이동형 발전 플랜트를 긴급으로 투입가능해지며 대북 경협 등 정책에 새로운 대안으로 활용할 수 있다.

LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구 (Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project)

  • 김용탄;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권4호
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

LNG 플랜트 공사의 PMIS 개발방향에 관한 기초연구 (A study on the development direction for PMIS in LNG plant construction)

  • 한재구;진경호;박환표
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.298-300
    • /
    • 2013
  • Depending on the very large and complicated of the LNG plant project, for the successful execution of the project, the operating system that is seamlessly integrated in EPC phase is needed. Therefore, we surveyed and analyzed the PMIS development and application status in domestic and international plant construction. Based on the results of the research, we proposed the development direction for PMIS in LNG plant construction.

  • PDF

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

석탄화력발전대비 LNG복합화력발전 환경성 및 경제성 비용분석에 관한 연구 (A Study on Environmental and Economic Cost Analysis of Coal Thermal Power Plant Comparing to LNG Combined Power Plant)

  • 김종원
    • 아태비즈니스연구
    • /
    • 제9권4호
    • /
    • pp.67-84
    • /
    • 2018
  • This study is about comparing coal thermal plant to LNG combined power plant in respect of environmental and economic cost analysis. In addition sensitive analysis of power cost and discount rate is conducted to compare the result of change in endogenous and exogenous variable. For environmental assessment, when they generate 10,669GWh yearly, coal thermal power plant emits sulfur oxides 959ton, nitrogen oxide 690ton, particulate matter 168ton and LNG combined power plant emits only nitrogen oxide 886ton respectively every year. Regarding economic cost analysis on both power plants during persisting period 30 years, coal thermal power plant is more cost effective 4,751 billion won than LNG combined taking in account the initial, operational, energy and environmental cost at 10,669GWh yearly in spite of only LNG combined power plant's energy cost higher than coal thermal. In case of sensitive analysis of power cost and discount rate, as 1% rise or drop in power cost, the total cost of coal thermal power plant increases or decreases 81 billion won and LNG combined 157 billion won up or down respectively. When discount rate 1% higher, the cost of coal thermal and LNG combined power plant decrease 498 billion won and 539 billion won for each. When discount rate 1% lower, the cost of both power plant increase 539 billion won and 837 billion won. With comparing each result of change in power cost and discount rate, as discount rate is weigher than power cost, which means most influential variable of power plan is discount rate one of exogenous variables not endogenous.

LNG 선박 건조현황과 인력수요 예측

  • 박진수
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2006년도 추계학술대회 논문집(제2권)
    • /
    • pp.93-95
    • /
    • 2006
  • 최근 LNG 선박의 발주량이 급증함에 따라 LNG 선에 승무할 인력의 심각한 부족이 예상되고 있다. 이러한 LNG 선박에 승무할 인력 특히 고급 사관의 부족은 선박 자체의 안전뿐 아니라 궁극적으로는 LNG 수송체계의 안전에도 큰 영향을 미치게 될 것이다. 이 발표에서는 현재 전세계 상선대의 현황에서 출발하여, 최근 LNG 선박의 발주 현황, LNG 선박에 적용되는 최신 기술 및 엔진 등에 대하여 살펴 본 후에 전세계 LNG 선박 수주 잔량을 근거로 하여 필요 인력을 예측해 본다.

  • PDF

상용 공정시뮬레이션 프로그램을 이용한 부유식 LNG 발전설비의 BOG 회수시스템 공정모사 (Process Simulation of the BOG Re-Liquefaction system for a Floating LNG Power Plant using Commercial Process Simulation Program)

  • 서주완;유승열;이재철;김영훈;이순섭
    • 해양환경안전학회지
    • /
    • 제26권6호
    • /
    • pp.732-741
    • /
    • 2020
  • 최근 환경규제가 강화됨에 따라 액화천연가스(Liquefied Natural Gas)를 이용하여 전력을 생산해내는 신규발전설비인 부유식 LNG 발전설비(floating LNG power plant)가 개발되고 있다. 부유식 LNG 발전설비는 운용 시 증발가스가 발생하고 이를 제거하거나 회수할 수 있는 시스템의 설계가 필요하다. 그러나 해양플랜트는 해상요건에 따라 설계가 상이하고, 부유식 LNG 발전설비의 설계 전 시행착오를 줄이기 위해 지속적으로 수정이 가능한 BOG 회수시스템 공정모사 모델이 필요하다. 따라서 본 연구에서는 상용공정시뮬레이션 프로그램을 통해 부유식 LNG 발전설비에 적합한 모델을 모델링하고자 냉매사용 유무에 따라 서로 다른 BOG(Boil-Off Gas) 회수시스템을 모델링하여 BOG의 회수율과 액화점을 비교 및 분석하였으며, 그 결과 질소냉매를 사용한 BOG 회수시스템 모델을 부유식 LNG 발전설비용 BOG 회수시스템 모델로 제안하고자 한다.

LNG 시험 플랜트의 정량적 위해도 평가를 위한 화재 및 폭발사고 해석 (Fire and Explosion Analysis for Quantitative Risk Assessment on LNG Test Plant)

  • 한용식;김명배;도규형;김태훈;최병일
    • 한국연소학회지
    • /
    • 제20권1호
    • /
    • pp.1-5
    • /
    • 2015
  • Fire and explosion analysis are performed for the quantitative risk assessment on the LNG test plant. From the analysis for a case of fire due to large leakage of LNG from the tank, it is obtained that loss of lives can be occurred within the radius of 60 m from the fire origin. Specially, wind can extend the extent of damage. Because the LNG test plant is not enclosed, the explosion overpressure is less than 6 kPa and the explosion has little effect on the integrity of the LNG test plant.

LNG 플랜트 공정계통의 실패율이 가용도에 미치는 영향에 관한 연구 (A Study on the Availability with Failure Rate of Process for LNG Plant)

  • 강경원;윤명오;이홍철;황인주
    • 설비공학논문집
    • /
    • 제24권4호
    • /
    • pp.358-363
    • /
    • 2012
  • The simulation investigation on the availability of LNG plant with scenario of failure events and failure rate has been carried out. This study focuses on the availability, productivity, criticality induced by failure rate of major equipment. The methodologies for simulation such as the equipment classification of LNG plant and failure type and event schematic are established. The availability and mean time to repair have second order function profile in the all cases except general equipment, but these profiles have different inclination. The production and criticality of the specified LNG plant, simulated by Monte-Carlo algorithm, is located in the range of P = 86~92% and PL = 6~13%.