Economic Feasibility Study for Molten Carbonate Fuel Cells Fed with Biogas

  • Song, Shin-Ae;Han, Jong-Hee;Yoon, Sung-Pil;Nam, Suk-Woo;Oh, In-Hwan;Choi, Dae-Ki
    • Journal of Electrochemical Science and Technology
    • /
    • v.1 no.2
    • /
    • pp.102-111
    • /
    • 2010
  • Molten carbonate fuel cell (MCFC) power plants are one of most attractive electricity generation systems for the use of biogas to generate high-efficiency ultra-clean power. However, MCFCs are considerably more expensive than comparable conventional electricity generation systems. The commercialization of MCFCs has been delayed more than expected. After being effective in the Kyoto protocol and considerably increasing the fossil price, the attention focused on $CO_2$ regression and renewable energy sources has increased dramatically. In particular, the commercialization and application of MCFC systems fed with biogas have been revived because of the characteristics of $CO_2$ collection and fuel variety of MCFCs. Better economic results of MCFC systems fed with biogas are expected because biogas is a relatively inexpensive fuel compared to liquefied natural gas (LNG). However, the pretreatment cost is added when using anaerobic digester gas (ADG), one of the biogases, as a fuel of MCFC systems because it contains high $H_2S$ and other contaminants, which are harmful sources to the MCFC stack in ADG. Thus, an accurate economic analysis and comparison between MCFCs fed with biogas and LNG are very necessary before the installation of an MCFC system fed with biogas in a plant. In this paper, the economic analysis of an MCFC fed with ADG was carried out for various conditions of electricity and fuel price and compared with the case of an MCFC fed with LNG.

Effect of Two staged Inter-cooler on Efficiency of LNG Liquefaction Process (LNG 액화 사이클 효율에 미치는 2단 압축 인터쿨러의 영향)

  • Yoo, Sun-Il;Oh, Seung-Taek;Lee, Ho-Saeng;Yoon, Jung-In;Choi, Keun-Hyung;Lee, Sang-Gyu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.34 no.1
    • /
    • pp.46-52
    • /
    • 2010
  • In this study, several types of natural gas liquefaction processes using two staged Inter-cooler are simulated and designed to secure a competitiveness in the industry of natural gas liquefaction plant. These processes are based on basic cascade process, and all of these are improved with two staged compressors type. One of types is applied Inter-cooler to each cycle such as propane, ethylene, methane, the other type is applied Inter-cooler to whole cycle. These processes are compared characteristics of performance with basic process. Cascade process with two staged Inter-cooler in the whole cycle is on the top ranked with increment ratio of COP about 13.7 ~ 20.5%, and yield efficiency of this process are improved comparing with the basic process by 23.8% ~ 35% lower specific power, respectively.

The Effect of the Demand Forecast on the Energy Mix in the National Electricity Supply and Demand Planning (전력수급계획 수립시 수요예측이 전원혼합에 미치는 영향)

  • Kang, Kyoung-Uk;Ko, Bong-Jin;Chung, Bum-Jin
    • Journal of Energy Engineering
    • /
    • v.18 no.2
    • /
    • pp.114-124
    • /
    • 2009
  • The Ministry of Knowledge and Economy (MKE) establishes the Basic Plan for Long-Term Electricity Supply and Demand(BPE) biannually, a governmental plan for the stable electricity supply. This study investigated the effects of the electric demand forecast on the energy mix. A simplified simulation model was developed, which replaces the WASP program developed by the KPX and verified by comparing both results. Three different electric demand scenarios were devised based upon the 2005 electric demand forecast: Proper, 5 % higher, and 5% lower. The simplified model calculates the energy mix for each scenario of the year 2005. Then it calculates the energy mix for the proper electric demand forecast of the year 2007 using the energy mixes of the three scenarios as the initial conditions, so that it reveals the effect of electric demand forecast of the previous BPE on the energy mix of the next BPE. As the proper electric demand forecasts of the year 2005 and 2007 are the same, there is no change in the previous and the next BPEs. However when the electric demand forecasts were 5% higher in the previous BPE and proper in the next BPE, some of the planned power plant construction in the previous BPE had to be canceled. Similarly, when the electric demand forecasts were 5% lower in the previous BPE and proper in the next BPE, power plant construction should be urgently increased to meet the increased electric demand. As expected the LNG power plants were affected as their construction periods are shorter than coal fired or nuclear power plants. This study concludes that the electric demand forecast is very important and that it has the risk of long term energy mix.

Performance Characteristics of Natural Gas Liquefaction Process using Liquid-gas Heat Exchanger (액-가스 열교환기를 적용한 천연가스 액화공정 성능 특성)

  • Yoon, Jung-In;Yoo, Sun-Il;Oh, Seung-Taek;Lee, Ho-Saeng;Lee, Sang-Gyu;Choi, Keun-Hyung
    • Journal of the Korean Institute of Gas
    • /
    • v.13 no.6
    • /
    • pp.44-48
    • /
    • 2009
  • In this paper, two different types of natural gas liquefaction cycle with 2 staged compression were designed and simulated to develop liquefaction process which is the core technology in the Industry of natural gas liquefaction plant. These include the cascade cycle with inter-cooler which is consisted of propane, ethylene and methane cycle. One of these is that liquid-gas heat exchanger is applied to between methane and ethylene cycles, and another is that liquid-gas heat exchanger is added to between ethylene and propane on the above process. Also, these cycles are compared with two staged cascade process using an inter-cooler. The COP of process2 is shown about 14.0% higher than that of process1, respectively. Also, the yield efficiency of LNG improved comparing with process1 with 11.5% lower specific power.

  • PDF

Economic Feasibility Study of the Life Extension by Reactor Type of Nuclear Power Plant in Korea (우리나라 원자력발전의 노형을 고려한 계속운전의 경제성 비교 연구)

  • Cho, Sungjin;Kim, Yoon Kyung
    • Environmental and Resource Economics Review
    • /
    • v.27 no.2
    • /
    • pp.261-286
    • /
    • 2018
  • This paper evaluated the economic feasibility of the life extension of Kori unit 1 and Wolsong unit 1 according to the types of the nuclear power plants (NPPs) and the life extension period comparing to the levelized costs of energy (LCOE) of the new NPPs, coal-fired plants (CFPs), and combined cycle gas turbine (CCGTs) which proposed in the $7^{th}$ Basic Plan for Electricity Supply and Demand. The economic feasibility of the life extension of NPPs using LCOE method is affected by the types of NPPs, lifetime extension periods, discount rate, and capacity factor. According to the analysis results, the pressurized light water reactor (PWR) is more economical than the pressurized heavy water reactor (PHWR). Comparing the economical efficiency between the life extension of NPPs and other alternatives, the operation of the PWR for 20 years is more economical than the one of new NPPs and CFPs. However, 20 years of life extension of PHWR is more economical than the CCGTs, but less economical than new NPPs and CFPs. In summary, the 20 years of life extension of the NPPs seems to be more, especially for the PWR, which is more cost effective than other generation alternatives. Therefore, the government policy of the life extension of NPPs need to be a selective approach that simultaneously considers both safety and economics rather than closing all NPPs.

Multi-stage Membrane Process for $CO_2$ Separation from Flue Gas Using PES Hollow Fiber Membrane Modules (폴리이서설폰 중공사모듈을 이용한 연소배가스로부터 이산화탄소 분리회수를 위한 다단계 막분리공정 연구)

  • Choi Seung-Hak;Kim Jeong-Hoon;Kim Eeom-Sik;Lee Soo-Bok
    • Membrane Journal
    • /
    • v.15 no.4
    • /
    • pp.310-319
    • /
    • 2005
  • This paper describes the preliminary study on the development of multi-stage membrane demonstration plant for removal of carbon dioxide from flue gas stream being emitted from LNG boiler in thermal power generation plant. The prerequisite requirement is to design and develop the membrane process producing a $99\%\;CO_2$ with $90\%$ recovery from LNG flue gas of 1,000 $Nm^3$/day. Asymmetric polyethersulfone hollow fiber membranes and membrane modules developed in this laboratory[1] were used in this study. Using the permeation data for the hollow fiber membranes, modelling on the membrane module and multi-stage membrane process was done to meet the requirement condition of the process design. The effects of the operating pressure of feed and permeate side and feed concentration on $CO_2$ purity and recovery were investigated experimentally with the developed hollow fiber modules. These experimental results matched well with theoretical modelling results.

Action Plan for the Effects of Variation of Fuel Gas Composition on Domestic Gas Turbines (국내 가스터빈연소기 LNG열량변화에 따른 대응방향 연구)

  • Lee, Joongsung;Ha, Jongman;Han, Jeongok
    • 한국연소학회:학술대회논문집
    • /
    • 2014.11a
    • /
    • pp.115-118
    • /
    • 2014
  • Since 1st July 2012, the our Goverment and KOGAS have been adopting a calorific value range system from the standard calorific value system. Domestic power plant companies and KOGAS have asked GT manufacture about the effects of the reduction of the calorific value. We received GT manufacture's answer to the question on April 12.2011. Gas components of some GT models were limited to no more than 9% of the C2+ content. Now some of GTs remain under debating whether effects on variation of gas heating or not.

  • PDF

The Best Generation Mix considering CO2 Air Pollution Constraint ($CO_2$ 배출량제약을 고려한 최적전원구성)

  • Lee, Sang-Sik;Tran, TrungTinh;Kwon, Jung-Ji;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.149-151
    • /
    • 2005
  • A new approach considering CO2 air pollution constraints in the long-term generation mix is proposed under uncertain circumstances. A characteristic feature of the presented approach in this paper is what effects give the air pollution constraints in long term best generation mix. Best generation mix problem is formulated by linear programming with fuel and construction cost minimization with load growth, reliability (reserve margin rate) and air pollutionconstraints. The proposed method accommodates the operation of pumped-storage generator. It was assumed in this study that the construction planning of the hydro power plants is given separately from the other generation plans. The effectiveness of the proposed approach is demonstrated by applying to the best generation mix problem of KEPCO-system, which contains nuclear, coal, LNG, oil and pumped-storage hydro plant multi-years.

  • PDF

A Study on the Construction of flexible Best Generation Mix with fuzzy Multi-criterion Function (퍼지 다목적함수(多目的函數)를 갖는 유연(柔軟)한 최적전원구성(最適電源構成)의 수립에 관한 연구(硏究))

  • Song, Kil-Yeong;NamGung, Jae-Young;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.103-105
    • /
    • 1992
  • The new approach using fuzzy linear programming with fuzzy multi-criterion is proposed for the best generation mix of a power system. A chracteristic feature of the presented approach is that not only cost but also reliability for goal function can be taken into account by using fuzzy multi-criterion and so more realistic solution can be obtained. The effectiveness of the proposed approach is demonstrated by the best generation mix problem of KEPCO-system size model which contains nuclear, coal, LNG, oil and pump-generator hydro plant in multi-years.

  • PDF

Characteristics of cryogenic liquefaction cycle using two stage compression type (2단 압축 방식을 적용한 초저온 액화 사이클 특성)

  • Oh, Seung-Taek;Lee, Ho-Saeng;Yi, Gyeong-Beom;Yoon, Jung-In;Lee, Sang-Gyu
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.556-560
    • /
    • 2009
  • In this paper, two different types of natural gas liquefaction process are simulated and designed for secure a competitiveness in the industry of natural gas liquefaction plant. These processes are based on basic cascade process, and one of these is improved with two staged intercooler and the other is modified two staged intercooler. These processes are compared characteristics of performance with basic process. COP of cascade process with two staged intercooler and modified two staged intercooler showed about 13.74% and 21.64% higher than basic process, and yield efficiency of modified process improved comparing with the basic process by 25.93% lower specific power, respectively.

  • PDF