• Title/Summary/Keyword: LNG시장

Search Result 47, Processing Time 0.03 seconds

Economic Analysis on Repowering Plans for a Outworn Anthracite Power Plant (노후 무연탄발전소의 리파워링 방안에 대한 경제성 분석)

  • Kim, Su-Man;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.9 no.1
    • /
    • pp.36-42
    • /
    • 2013
  • In this study, repowering scenarios are analyzed and evaluated from the economical point of view on a case by case basis. Based on the result of evaluation, the IRR indicates 2.34% on single 750 MW LNG combined cycle unit, 3.56% on 500 MW sub-bituminous PC units and 2.31% on 200 MW circulating fluidized bed combustion units, resulting in not reaching 7% rate of discount rate and being concluded uneconomical. However, proposes that it is most economical and feasible to repower power plant into 750 MW LNG combined cycle unit as long as the economic feasibility can be improved and it is necessary for old anthracite power plant to be repowered than rebuilt under the circumstances of lacking power supply.

  • PDF

Hydrogen Generation Technology for Hydrogen Fueling Station (수소스테이션용 고효율 수소제조 기술개발)

  • Oh, Young-Sam;Park, Dal-Lyung;Cho, Young-Ah
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.92-101
    • /
    • 2005
  • 세계적으로 수소에너지를 미래 에너지의 대안으로 여겨지고 있기 때문에 수소에너지 관련기술은 미래 국가 경쟁력을 좌우할 것으로 예상되고 있으며 수소에너지시대의 핵심인 수소스테이션 관련기술을 개발은 국가 연료전지 시장을 비롯한 수소 자동차 산업 전반에 큰 영향을 미칠 것으로 예상되고 있다. 이에 따라 전 세계적으로 수소에너지를 차세대 에너지원으로 개발하기 위하여 전력을 다하고 있으며 수소제조기술개발 및 수소스테이션 실증연구가 진행되고 있다. 본 연구에서는 수소제조장치 관련 국내외 기술개발 현황과 수소스테이션용 고효율 수소제조장치 장치 개발 현황을 소개하고자 한다.

  • PDF

Risk Assessment Technology of LNG Plant System (액화천연가스 플랜트 시스템 위험도평가 기술)

  • Choi, Song-Chun;Ha, Je-Chang;Lee, Mee-Hae;Jo, Young-Do;Chang, Yoon-Suk;Choi, Shin-Beom;Choi, Jae-Boong
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.29 no.2
    • /
    • pp.162-170
    • /
    • 2009
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this manuscript is to introduce domestic activities to develop risk assessment technology against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

해운이슈 - 한국해양수산개발원, 최근 해운시장 이슈와 대응에 대해 발표

  • 한국선주협회
    • 해운
    • /
    • s.93
    • /
    • pp.11-22
    • /
    • 2012
  • 최근 해운시장에서 가장 이슈가 되는 주저는 해운시황 전망과 선사의 유동성 확보 대책으로 집약된다. 현재 해운시장에서는 해운시황 전망, 특히 운임회복 시기 문제가 가장 중심적인 이슈이다. 그리고 국내선사의 공통적인 문제인 유동성 확보 제, 이에 대한 해결책으로 거론되는 Primary CBO 발행과 패스트 트랙(Fast Track) 문제 등도 중요한 이슈로 거론되고 있다. 또한 선사 경영(수익성)에 가장 많은 영향을 미치는 유가 문제, 이를 해결하기 위한 방편에서 선박 연료유 헷징과 공동구매도 관심을 물고 있는 문제가 있다. 유가 문제는 과거의 해운 불황기에 크게 문제가 되지 않았으나, 최근에는 해운기업의 경영난을 가장 크게 가중시키고 있다. 한편 해운시장에서 국적선사를 더욱 어렵게 하는 요인은 국내 대량화물의 외국적 선사의 참여문제이다. 석탄, 철광선, LNG 등의 대량화물은 국가경제발전에도 매우 중요한 전략물자임과 동시에 선사입장에서도 가장 중요한 화물임에도 외국적 선사의 수송이 근절되지 않고 계속 늘어나고 있다. 다음은 한국해양수산개발원 황진회 센터장이 발표한 "최근 해운시장 이슈와 대응"의 주요 내용을 요약 정리한 것이다.

  • PDF

The Influence of Excluding No-load Cost from SMP on Cost Reduction Incentive of Generators (계통한계가격(SMP)에서 무부하비용 제외가 발전사 비용절감 유인에 미치는 영향)

  • Kim, Myung Yun;Cho, Sung Bong
    • Environmental and Resource Economics Review
    • /
    • v.23 no.4
    • /
    • pp.617-641
    • /
    • 2014
  • Korean electricity market is a Cost-Based Pool (CBP) designed to minimize electricity production cost through cost by providing cost reduction incentives to generators. Generation companies have shown diverse efforts to reduce costs in CBP market such as procuring low-price fuels, installing high efficiency gas turbine and constructing power plants near the heavy-load site. Recently, as a way to improve CBP market, a proposal to exclude no-load cost from System Marginal Price (SMP) and to compensate generators ex post was suggested to Korea Power Exchange. This study analyzes the impact of excluding no-load cost from SMP on the cost reduction incentive of generators. We found that excluding no-load cost from SMP enhances the likelihood of decreasing the cost reduction incentives of LNG combined-cycle generators lying on the price-setting range.

A Study on the Climate Change and the Policy of Natural Gas Exploitation on the Arctic Region (기후변화와 북극 유·가스전 개발에 관한 연구)

  • Kim, Boyoung;Ryu, Siho;Park, Yonhe
    • Environmental and Resource Economics Review
    • /
    • v.18 no.4
    • /
    • pp.787-813
    • /
    • 2009
  • Because of global warming, the thawing of the Arctic ice cap is slowly accelerating. That is the hot issue nowadays. According to the each country's climate change policy, it is boom in the world to lessen the consuming of the fossil fuel those are oil, coal and natural gas. But on the contrary the thawing of the Arctic ice cap is the chance to make the natural gas producing unit cost lower. The purpose of this paper is to search the Arctic policy of each country under the contradictory relationship between promoting the climate change policy and exploiting the natural gas on the Arctic. Specially, there are huge natural gas reserves in Russia on the Arctic region, Russia's exploiting the natural gas on the Arctic will affect on the natural gas supply-demand balance of world natural gas market strongly in the future. Therefore it needs to prepare the future energy alternative policy for Korea's energy security. Russia has Yamal Peninsular where is abundant on natural gas reserver, and she can supply natural gas by LNG ship all over the world via the Arctic route. This means that the structure of world natural gas market be changed gradually. It will be possible in 2030~2040. And such a change is very important because new natural gas trading type can do it through not only overcoming the geological restriction but also shifting the main trading type from PNG(Pipeline Natural Gas) to LNG(Liquified Natural Gas). Therefore it is necessary that we should let this be a good lesson to ourselves through the government action of other countries (China, Japan) those also have no sovereignty over the Arctic as Korea.

  • PDF

Influences of Emission Trading on Current Electricity Market (배출권 거래가 현 전력시장에 미치는 영향)

  • Kim, Kwang-In;Kim, Doo-Jung;Moon, Young-Kwon
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.119-120
    • /
    • 2007
  • 지구온실가스에 대한 배출권거래제가 도입될 경우에는 현 변동비반영 전력시장에는 새로운 발전비용 요소가 추가되고 이에 따른 발전비용 및 거래비용이 증가됨을 밝혔다. 배출권 거래비용은 석탄, 중유, LNG발전의 순으로 증가하며, 향후 도입될 배출권 거래제에 대한 3가지 시나리오를 설정하여 분석한 결과, 발전비용의 증가는 시나리오별로 연간 112억원$\sim$1336억원이 소요되고, 시장에서의 거래비용은 이보다 작은 39억원$\sim$450억원 수준으로 나타났다. 또한 현 변동비반영 가격결정체제에서 배출권거래제를 도입하기 위해서는 기준배출비용을 산출하고 이를 조정하는 절차의 운영이 필요함을 밝혔다.

  • PDF

Dual Capacity Price Mechanism to Provide Stable Remuneration for Generation Capacity (전력도매시장에서의 안정적 발전용량 보상을 위한 이원적 용량가격 제도 도입 방안)

  • Kim, Yung San
    • Environmental and Resource Economics Review
    • /
    • v.25 no.1
    • /
    • pp.113-140
    • /
    • 2016
  • Achieving the two goals of providing stable remuneration and promoting market based incentive for generation capacity with only one kind of capacity price is a difficult proposition. This paper suggests a market design in which two different kinds of capacity prices are used to achieve these goals. It maintains the current capacity price that is determined administratively based on the fixed cost of the gas-turbine generator. A second capacity price is added that covers generators with higher fixed costs and lower fuel costs such as combined-cycle gas turbine, coal-powered, and nuclear generators. This second capacity price is conditional on a lower energy price ceiling and determined by the interaction of the market supply and a demand schedule derived from the optimal fuel mixed principle.

에스코 국내소식

  • Korean association for escos
    • The Magazine for Energy Service Companies
    • /
    • s.40
    • /
    • pp.78-81
    • /
    • 2006
  • 포스코 에너지절약설비에 3100억 투입/ ESCOs,신재생에너지로 사업분야 확장 서둘러/ 올 하반기 '한국에너지재단' 설립/ 과학기술부 에너지 · 자원 개발로 30만명 고용창출/ 한국건설기술연구원 에너지 손실없는 환기 시스템 개발/ 안산도시개발 국내최초 아파트 지역 냉방 공급/ 산자부 고효율 전등 교체/ 정부 지구온난화 대응 R&D에 2조원 투입/ 지열이용기술연구회 제주서 보글활성화 세미나/ 효성중공업 미 초고압 변압기시장 공략/ 한국가스공사 2011년까지 LNG탱크 120만kl증설/ 에관공 한수원 신재생에너지설비 현장견학 실시/ 기술표준원 수소연료전지 KS규격제정/

  • PDF

Impacts of Energy Tax Reform on Electricity Prices and Tax Revenues by Power System Simulation (전력계통 모의를 통한 에너지세제 개편의 전력가격 및 조세수입에 대한 영향 연구)

  • Kim, Yoon Kyung;Park, Kwang Soo;Cho, Sungjin
    • Environmental and Resource Economics Review
    • /
    • v.24 no.3
    • /
    • pp.573-605
    • /
    • 2015
  • This study proposed scenarios of tax reform regarding taxation on bituminous coal for power generation since July 2015 and July 2014, estimated its impact on SMP, settlement price, tax revenue from year 2015 to year 2029. These scenarios are compared with those of the standard scenario. To estimate them, the power system simulation was performed based on the government plan, such as demand supply program and the customized model to fit Korea's power system and operation. Imposing a tax on bituminous coal for power generation while maintaining tax neutrality reducing tax rate on LNG, the short-term SMP is lowered than the one of the standard scenario. Because the cost of nuclear power generation is still smaller than costs of other power generation, and the nuclear power generation rarely determines SMPs, the taxation impact on SMP is almost nonexistent. Thus it is difficult to slow down the electrification of energy consumption due to taxation of power plant bituminous coal in the short term, if SMP and settlement price is closely related. However, in the mid or long term, if the capacity of coal power plant is to be big enough, the taxation of power plant bituminous coal will increase SMP. Therefore, if the tax reform is made to impose on power plant bituminous coal in the short term, and if the tax rate on LNG is to be revised after implementing big enough new power plants using bituminous coal, the energy demand would be reduced by increasing electric charges through energy tax reform. Both imposing a tax on power plant bituminous coal and reducing tax rate on LNG increase settlement price, higher than the one of the standard scenario. In the mid or long term, the utilization of LNG complex power plants would be lower due to an expansion of generating plants, and thus, the tax rate on LNG would not affect on settlement price. Unlike to the impact on SMP, the taxation on nuclear power plants has increased settlement price due to the impact of settlement adjustment factor. The net impact of energy taxation will depend upon the level of offset between settlement price decrease by the expansion of energy supply and settlement price increase by imposing a tax on energy. Among taxable items, the tax on nuclear power plants will increase the most of additional tax revenue. Considering tax revenues in accordance with energy tax scenarios, the higher the tax rate on bituminous coal and nuclear power, the bigger the tax revenues.