• Title/Summary/Keyword: LF Communication

Search Result 32, Processing Time 0.016 seconds

Low-Complexity Joint Estimation Algorithms of Frequency Offset and Carrier Phase for Digital Communication Systems (디지털 통신 시스템에서 주파수 옵셋과 반송파 위상의 간단한 동시 추정 알고리듬)

  • Hong Dae-Ki;Kang Sung-Jin;Ju Min-Chul;Kim Yong-Sung;Cho Jin-Woong
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.11C
    • /
    • pp.1581-1591
    • /
    • 2004
  • In this paper, we investigate the design of three low-complexity joint estimation algorithms(LJEAs) for frequency offset and carrier phase. The proposed LJEAs are based on the interpolation technique of correlation values of the received signal in frequency and phase domains. With these algorithms, the estimation ranges $\Delta$f$_{d}$${\times}$T$_{s}$ . are less than 1/2N$_{s}$ , and 1/N$_{s}$ which are comparable to conventional algorithms. The Proposed LJEAs require only 2N$_{s}$ or 4N$_{s}$ complex multiplications which are very simple compared with the conventional algorithms. Nevertheless the estimation accuracies of the LJEAs are as good as those of the conventional algorithms. Suitable areas of application include joint estimation of frequency offset and carrier phase in burst-mode digital transmission such as satellite communications.

Developing Competency Model and Analyzing Competency Needs for Construction Manager in D Co., Ltd. (건설사업관리자 역량 모형 개발 및 역량 요구 분석: D사(社) 사례를 중심으로)

  • Kim, Dae-Young
    • Journal of vocational education research
    • /
    • v.33 no.3
    • /
    • pp.37-56
    • /
    • 2014
  • The purpose of this study was to develop a competency model and analyze the competency needs for construction manager in D Co., Ltd.. The delphi method of 25 excellent construction managers working in D Co., Ltd. was used to develop a competency model. The results showed that there would be a construction manager competency model which consisted of 3 competency clusters, 11 competencies, and 60 key actions. Then the survey of 114 construction managers working in D Co., Ltd. was conducted to examine concurrent construct validity of the competency model for construction manager and to analyze construction managers' competency needs by using the Borich's formula and the Locus for Focus Model(LfFM). The results showed that construction managers perceived 'communication', 'risk management', 'goal orientation', 'customer orientation', and 'project management' as top five priorities of competencies for construction managers. Based upon the above results, some implications were suggested for developing construction managers' competencies and improving their performance.