• Title/Summary/Keyword: LADGPS

Search Result 3, Processing Time 0.017 seconds

A Study on the Development of Dredge Process Management System (준설공정관리시스템 개발에 관한 연구)

  • 정대득;이중우;조증언
    • Journal of Korean Port Research
    • /
    • v.15 no.1
    • /
    • pp.75-85
    • /
    • 2001
  • Accuracy of dredging processes depends on the types of equipment used, the sediments encountered, whether the work to be performed is new or maintenance dredging, pre- and post-hydrographic surveying and so forth. Among those, position surveying accuracy which is directly determined by the control of the dredge's position and depth surveying accuracy being surveyed at the dredging point during dredging work are important factors. The purpose of this study is to develop 'Dredge Management System'for Grab dredge which is composed of 4 sub-system using LADGPS for dredge position determining system and dredging point determining system, tide gauge system and optical sensor for depth determining system and GIS and ENC for total management system. This system is installed on the grab dredge 'EUNJIN G-18'and applied to anchorage dredging work. at Pohang Harbor. The results revealed that this system is easy to operate, achieves good accuracy with only 45cm unevenness, reduces working period by 22 percent and saves cost 16.6 percent.

  • PDF

Development of Integrated Process Management System for Pump Dredge (펌프식 준설선의 통합공정관리시스템 개발)

  • Jeong, Dae-Deuk;Lee, Joong-Woo;Cho, Jeung-Eon
    • Journal of Navigation and Port Research
    • /
    • v.26 no.1
    • /
    • pp.146-151
    • /
    • 2002
  • Efficiency of dredging work depends on the types of equipment used, the sediments encountered, whether the work to be performed is new or for maintenance, pre and/or post hydrographic surveying and so forth. Among those, surveying accuracy which is directly determined by the control of the dredge's position and depth surveying accuracy being surveyed at the dredging point are important factors. The purpose of this study is to develop an integrated process management system for pump dredge. The system is composed of 4 sub-systems such as LADGPS for dredge positioning dredging point determination, tidal gauge and angular depth sensor for depth determination, and GIS and ENC process management. The process management system for pump dredge developed was installed on the pump dredge "EUNJIN PD-2" but is now producing work data for comparison with performance of the existing dredge. The data retrieved from the pump dredge process management system up to now shows similar result from the grab dredge management system which was developed previously. It is easy to operate, achieves good accuracy with only 45cm unevenness, reduces working perioa by 20 percint,. More precise evaluation of the system comes later after the dredging work is completed.completed.

Accuracy Analysis of Kinematic SBAS Surveying (SBAS 이동측위 정확도 분석)

  • Kim, Hye In;Son, Eun Seong;Lee, Ho Seok;Kim, Hyun Ho;Park, Kwan Dong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.5
    • /
    • pp.493-504
    • /
    • 2008
  • Space-Based Augmentation System (SBAS), which is one of the GPS augmentation systems, is a Wide-Area Differential GPS that provides differential GPS corrections and integrity data. In this study, we did performance analysis of kinematic SBAS surveying by conducting Real-Time Kinematic (RTK), DGPS, standalone, and SBAS surveys. Considering static survey results as truth, 2-D Root Mean Square (RMS) error and 3-D RMS error were computed to evaluate the positioning accuracy of each survey method. As a result, the 3-D positioning error of RTK was 13.1cm, DGPS 126.0cm, standalone (L1/L2) 135.7cm, standalone (C/A) 428.9cm, and SBAS 109.2cm. The results showed that the positioning accuracy of SBAS was comparable to that of DGPS.