• Title/Summary/Keyword: Korean Power System

Search Result 28,765, Processing Time 0.049 seconds

Technical Problems and solution based on Connection of Dispersed Power System into Power Distribution System (분산형전원의 배전계통연계에 따른 기술적 과제와 대책)

  • Yoon, G.G.;Yoon, T.S.;Roh, H.N.;Park, C.H.;Kim, J.O.;Kim, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.485-487
    • /
    • 2001
  • Electric power has traditionally been supplied to the demander through power generation, its transmission, and final distribution system. It is, however, expected that the various dispersed power system will be located near demanders and act as a power source based on the efficient management of electric power demanders and the optimal utilization of substitute energy. More stable electric power and efficient utilization of various power sources can be guranteed through the connection of the dispersed power system into the existing power system. It is the purpose of this study that, in the case of the connection of dispersed power system into the existing distribution line, effects of the connection on the power quality and plans for protection of power equipments are discussed and solutions of them are proposed.

  • PDF

Generation Characteristic of WEC for Buoy (브이용 파력발전시스템의 발전특성)

  • Oh, Jin-Seok;Kwak, Jun-Ho;Bae, Soo-Young;Jung, Sung-Young;Lee, Ji-Young
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.8
    • /
    • pp.1123-1128
    • /
    • 2008
  • Marine facilities like buoy, lighthouse are operated with stand alone power supply system. This power system can consist of a stand-alone type power system such as PV(Photovoltaic) system, wave system or hybrid system which is not cooperated with a commercial power system. Generally, PV power system for marine facilities can not supply a sufficient power to buoy, because it is so influenced from weather condition. For solving this problem the hybrid power system with PV and wave is studied on a various area, that is why a hybrid power system is requires to overcome these problems. This paper will describe a generation characteristic of WEC(Wave Energy Converter) for buoy, and an AFS(Anti-Fouling System) influence on WEC.

A Study on the Algorithm for Interconnection of PV System on Power Distribution System Considering Reliability (신뢰도를 고려한 태양광시스템의 배전계통 연계 알고리즘에 관한 연구)

  • Moon, Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.4
    • /
    • pp.241-245
    • /
    • 2011
  • In this paper, when photovoltaic (PV) systems are connected to power distribution system, most effective capacity and connected-point of PV system are presented considering power distribution system reliability. The reliability model of PV system is presented considering the duration of sunshine. Also the model of time-varying load and reliability test system bus2 model are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability for residential, general, industrial, and educational customer is evaluated.

Calculation of shielding range using shield wires in Myanmar 500kV Substation (차폐선을 이용한 미얀마 500kV 변전소 차폐보호범위 계산)

  • Park, H.S.;Kim, T.Y.;Cho, Y.S.;Park, C.S.;Joo, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.189-191
    • /
    • 2005
  • In the past, dramatic economical development of Korea could be achieved by well-organized 154kV power system network. Electric power Is a key Industry for the nation and industrial development. Nowadays we operates 345kV Power system with based transmission network and also we are operating 765kV power system to supply to the capital region. Currently developing countries in Southeast Asia are requiring the electric power technology to Korea so that they can acquire the source of the development-power system network. Therefore, it Is important to design transmission line and substation with appropriate methods. In this paper, a calculation and calculating process of shielding range using shield wires in Myanmar 500kV substation are reviewed according to the Myanmar 500kV power system project performed by the overseas projects section of the Korea Electric Power Corporation.

  • PDF

A Study on Verification of PowerRail based on Voltage Drop under Extended Feeding Condition (연장급전 전압강하 계산을 위한 전기철도 급전 시뮬레이터의 검증에 관한 연구)

  • Kim, Joorak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.331-337
    • /
    • 2015
  • The power flow analysis of electrified railway is required complicated calculation, because of variable load. Train runs trough rail supplied by electric power therefore, the load value in electrified railway system fluctuates along time. The power flow algorithm in electrified railway system is different from general power system, and the power flow simulation is peformed by the particular simulation software. Powerail is simulation software for analysis of traction power supply system developed by KRRI, in 2008. This consists of load forecasting module, including TPS and time scheduling, and power flow module. This software was verified by measured current under normal feeding condition, however, has not been verified by voltage on the condition of extended feeding. This paper presents the verification of PowerRail based on voltage drop under extended feeding condition. This is performed by comparing simulation result with field test. Field test and simulation is done in commercial railway line.

A Study on the Design of Small Unit SCADA System for Electric Railroad (전기철도용 소규모SCADA 시스템 설계방안에 관한 연구)

  • Lee, Seung-Chul;Shin, Kwan-Woo;Lee, Youn-Seop
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.53 no.2
    • /
    • pp.89-93
    • /
    • 2004
  • Supervisory Control And Data Acquisition(SCADA) of electric power system refersto the system that displays, monitors and executes the control commands for remote electric power system. KNR's existing electric power control system is built on UNIX platform such that it costs more for system construction, and people with UNIX skills can only be an operator who controls and manages the system. Moreover, since the system is mainly operated in local offices, system operators must communicate with local operators to investigate the cause of the accident and react the accident every time the system fails. As a new integrated SCADA system is constructed, establishment of small-unit electric power control system, that alters local electric power control system in designated stations, is required. In this study, the electric power control system, which accommodates all functions of UNIX-based SCADA system and facilitates operation and even maintenance for local operators, is to be developed. In order to develop small-unit electric power control system, the industrial automation program, "Cimon", is used. The small-unit electric power control system that accommodatesRTU and newly installed electronic switchboard is being developed and tested at Chulam station of KNR.

Design of Fault Location System for High Voltage Underground Power Cable (지중송전선 고장점 탐색 장치 설계)

  • Lee, Jae-Duck;Ryoo, Hee-Suk;Choi, Sang-Bong;Nam, Kee-Young;Jeong, Seong-Hwan;Kim, Dae-Kyeong
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.603-605
    • /
    • 2006
  • To reduce inference of any power delivery failures in underground power cable, power system operators are trying to find effective way of finding fault location as soon as possible. But it is very difficult to find fault location exactly for underground power cable. We are developing fault location system for underground power cable which can detect its fault location exactly. This new system monitors current and voltage of underground power cable by using low voltage and current sensors and if there are any accidents, it records its transient signal. Fault location is calculated by analyzing recorded signal. To develop fault location system for power cable, we needed fault simulation system and we installed it physically and tested. In this rapers, we describe on describe of fault location system for underground power cable.

  • PDF

Long-term Power System Planning by using Mixed-Integer Programming (선형계획법을 활용한 장기 전력계통 계획수립 기법개발)

  • Ryu, Heon-Su;Cho, Kang-Wook;Lee, Jo-Lyeon;Kim, Tae-Hoon;Kim, Jin-Yi;Park, Marn-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.100-102
    • /
    • 2007
  • 본 논문에서는 혼합정수 선형계획 법을 이용하여 장기 전력계통 계획수립시 최적의 설비를 투자할 수 있는 기법을 제안하였다. 발전설비와 송변전설비는 하나의 망으로 연결되어 상호 보완적 영향을 주기 때문에 계통계획시 두 설비를 동시에 평가하는 것이 무엇보다 중요하다. 또한 계획기간 전체에 대해 투자비를 고려하여 비용을 최소화해야 한다. 이를 위해 선형계획법을 계통계획에 도입하여 최소비용의 투자비를 가지고 공급 신뢰도 기준를 만족할 수 있는 최적 장기 전력계통 계획 수립기법을 개발하였다. 개발된 기법을 Garver 6모선 계통 및 제3차 전력수급기본계획에 대해 모의하여 결과의 타당성을 검증하였다.

  • PDF

A Determining Contingency Ranking Using the Weather Effects of the Power System (날씨효과를 고려한 전력계통의 상정사고 순위 결정)

  • 김경영;이승혁;김진오;김태균;전동훈;차승태
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.487-493
    • /
    • 2004
  • The electric power industry throughout the world is undergoing considerable changes from the vertically integrated utility structure to the deregulated market. However, the deregulated electricity market is operated with respect to theory of economical efficiency, and therefore, the system operator requires data with fast contingency ranking for security of the bulk power system. This paper compares the weather dependant probabilistic risk index(PRI) with the system performance index for power flow in the IEEE-RTS. The system performance index for power flow presents the power system stability. This paper presents fast calculation method for determining contingency ranking using the weather dependant probabilistic risk index(PRI). The probabilistic risk index can be classified into the case of normal and adverse weather. This paper proposes calculation method using the probabilistic risk index in determining contingency ranking required for security under the deregulated electricity market.

A Study on Start·Stop System at Water Turbine-Generator for Tidal Power Plant (조력발전용 수차발전기의 기동·정지시스템에 관한 연구)

  • Oh, Min-Hwan;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.113-118
    • /
    • 2014
  • Tidal power is one of new and renewable energy sources. Tidal power is generated by using the gap in the water level between the water outside and inside the embankment. All tidal power plant in Korea were being operated by import of turn-key from abroad. The know-how and technology which are the most important to build predictive control system has become increasingly difficult to obtain from advanced countries because most of them avoid to transfer, which the domestic development of the control system is needed. In this paper, a study on start stop system at water turbine-generator for tidal power plant at the beginning of development was presented. For improvement the efficiency and develope of core technology of the start stop system, the technique and characteristics of tidal power, modeling, maximum generation calculation method, and optimal control of joint control system in Sihwa tidal power plant were studied.