• Title/Summary/Keyword: Korean Construction Firms

Search Result 267, Processing Time 0.022 seconds

A Study on the Development of Performance Evaluation Model Utilizing BSC(Balanced Score Cards) for Construction Firms (균형성과지표(BSC) 개념의 건설기업 성과평가모델 개발에 관한 연구)

  • Shin Kyoo-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.27-34
    • /
    • 2002
  • Utilizing information and knowledge is one of the major objectives in the management of construction firm. This trend has been developed both inside of the firms and overall industry-wise. Therefore conventional methods of performance evaluation based on the financial statements such as balance sheet under GAAP(Generally Accepted Accounting Principles) are not sufficient to cover various Performance of constriction firms. Core competency of construction firms needs to be evaluated by the new performance evaluation model. In this research, the concept of BSC (Balanced Score Cards) is utilized to develop the performance evaluation model for construction firms considering four major performance indicators including financial perspective, customer perspective, learn and growth perspective, anti internal business perspective. A model of performance evaluation including criteria is proposed to evaluate construction firms based on their vision and strategy.

  • PDF

Analyzing the Market Structure of International Construction Contracts : Focusing on Korean Construction Firms (국내 건설기업의 해외건설 계약실적 구조 분석)

  • Lee, Kang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.124-132
    • /
    • 2019
  • Notwithstanding the crucial contribution of international construction industry in the national economy, previous studies on international construction contracts had mainly focused either on trend investigation or market share analysis at a point of time. Fundamentally, the international construction industry is fragmented due to its project-based nature, is heterogeneous that has to involve different firms from diverse fields, and tends to be dynamic according to macroeconomic conditions. Therefore, the combination of static and dynamic analyses is necessary to understand its underlying structure. This study analyzes the market structure of international construction contracts using the data of 9,173 projects awarded by Korean construction firms from 2000 to 2017. Industry-level performance data is analyzed both in static (market concentration) and dynamic (market mobility and instability) methods, and detailed methodology is also provided. Consequently, the static analysis result shows that the competition among Korean construction firms has been more intensified, and the dynamic analysis result indicates that market positions of Korean construction firms are unstable and vulnerable in most of the regions and the sectors. The combination of static and dynamic indices is found to be helpful to understand the underlying aspects of market structure and can be utilized as an effective strategic reference in the highly competitive market.

A Status Analysis on the Field Management of Professional Construction Firms after Abrogation of Construction Participants System (시공참여자제도 폐지 이후 전문건설업체의 현장관리 실태분석)

  • Park, Kyoung-Hun;Kim, Hwa-Joong;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.199-203
    • /
    • 2009
  • After the construction participants system is abolished, expectations are high for its consequences such as liquidating paper-companies, holding back low price contracts, and improving multi-stepwise subcontract structure. However, the professional construction firms have been took responsibilities and obligations as businessmen employing the chief workmen and construction workers. For this reason, it is expected that they will be charged a great deal of expenses such as increase in labor management services and laborers, the occurrence of an retirement grants, insurance fees, etc. Since the hold on power of field managers are getting weaker toward the construction workers, it is most likely to have loss in efficiency of production in the long term. Therefore purpose of this research is to analyze difficulties and the point at issues with which professional construction firms are undergoing after abolishing the construction participants system by investigating on the actual condition in the field management. For this research, we got a grip on the actual condition and analyzed the rise of a primary factor on reinforced concrete construction.

  • PDF

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

Developing Strategies of Construction Firms through u-City Construction Project Scenarios (u-City 건설사업 시나리오에 따른 건설기업의 대응전략 수립에 관한 연구)

  • Kwon, Yong-Ho;Ha, Hee-Yoon;Yoo, Byeong-Gi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.146-154
    • /
    • 2007
  • The u-City construction project has become a hot topic In the construction market because it seems economic value-added field for construction firms. However, construction firms don't willingly participate in the u-City construction market because the future business environments for the u-City are very uncertain. Scenario planning is a very powerful method in managing this complex planning situation and is based on scenarios that help each enterprise appropriately adapt itself to its own business environments. Therefore it Is based on the main principles of systems thinking and multiple futures. For the purpose of dealing with such uncertainties, this paper attempts to develop the possible market scenarios of the u-City construction market through a scenario planning approach. From this perspective, we considered various aspects of the u-City construction such as market demands, technology development, policy level and management environment. After considering the relevant issues, we identified the main trends and key uncertainties. Then, we developed three coherent u-City construction market scenarios. On the basis of the proposed scenarios, the business strategies of potential construction firms in the u-City construction market has been formulated. Therefore, construction firms can use these scenarios as a basic data for market analysis and business strategy. Therefore, this paper is able to enhance the participation of construction firms in the u-City construction market.

Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures (CM 전문회사 단장 활용실태 및 개선방안)

  • Son, Chang-Baek;Huh, Young-Ki;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.87-95
    • /
    • 2013
  • The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.

Identification of Core Competencies of Construction Managers (CM단장 핵심역량 발굴에 관한 연구)

  • Kim, Dong-Hee;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.93-100
    • /
    • 2011
  • As the construction management(CM) market has grown, so has the CM competition in the market place. Consequently, competent construction managers become a core part of CM firms' competitiveness. The objective of the study is to identify and discuss core competencies of construction mangers based on literature survey, Delphi Method and AHP. Among various competencies required for construction managers, skills for problem solving, trust and negotiation skills were identified as the crux of construction managers' competencies. A better understanding of construction managers' core competencies is very critical in terms of CM firms' training of construction managers and continuos self-improvement for construction managers.

A Study on Elements of CM Firms' Competitive Strategy (경쟁전략요소에 대한 CM기업의 인식에 관한 연구)

  • Baek, Seung-Ryong;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.122-130
    • /
    • 2013
  • As the level of competition has increased in the construction management market, it becomes a critical issue for CM firms to secure competitive edges. The objective of the study is to investigate elements of competitive strategy as perceived by CM firms and to discuss key features and implications. Michael Porter's Competitive Strategy Model was used as a framework to analyse the elements under three strategy categories. A major finding includes that Differentiation Strategy is generally perceived most important strategy category but, depending on the group to which a CM firm belongs, there exist a gap in the perception. However, regardless of the group, Cost Leadership is commonly considered least important strategy category. In particular, lowest-bidding strategy element showed the least importance. Understanding CM firms' perceptions on elements of competitive strategy provides an insight into CM firms' current strategy directions and can be useful for future tuning in a firms' own strategy.

Analysis of Project Management Firms' Characteristics in BTL Projects (BTL사업 PM사의 특성 분석 연구)

  • Lee, Hyun-Ki;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.230-233
    • /
    • 2007
  • As a new form of the public procurement method, that is BTL(Build-Transfer-Lease) was introduced in 2005, it has consequently created a new form of emerging business, so called BTL Project Management firms. As a key participant of BTL projects, PM firms play an important role in securing the projects. But due to the short history of BTL, the identity of BTL PM firms has not been widely understood. The objective of this paper is to investigate major characteristics of BLT PM firms for better understanding of the emerging business.

  • PDF

Utilizing SWOT Model to Define a Strategy for the Korean Construction Companies in Preparation of the Changes in the Global Construction Market

  • Kim, HwaRang;Jang, HyounSeung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.486-490
    • /
    • 2015
  • SWOT model was used to develop strategies for the Korean construction firms in entering the global construction market. Literature review, official statistics survey and other research methods were utilized in order to extract internal and external environmental factors of both the firm and local area. By extracting strength, weakness, opportunity and threat factors, a total of 12 strategies were produced: SO (Strengths-Opportunities), ST (Strengths-Threats), WT (Weaknesses-Threats), and WO (Weaknesses-Opportunities). The result of the study can be utilized as a basic data in developing a strategy for the Korean construction firms to penetrate into the global construction market.

  • PDF