A new multi-step voltage source inverter is proposed in this paper. The proposed scheme is composed of the double-connected 12-step inverter with an auxiliary circuit. The auxiliary circuit includes two voltage dividing capacitors, two switching devices and a low KVA autotransformer. The resultant system is shown to be a 24-step inverter suitable for large scale SVC applications in which the PWM method can not be employed. The design parameters are derived from the analysis of voltages and currents by means of switching functions. The simulation results verify the proposed concept.
This paper proposes 40 [KVA] rated SW(Static Inverter) system for Light Rail Transit. The SIV provide power of a fluorescent light in the car, Air-conditioner, and other equipments. To control output voltage it is used voltage control loop for constant voltage control and simultaneously used current control loop for instantaneous control at load changing. The performance of SW system will be verified by experimental results.
The Transactions of the Korean Institute of Power Electronics
/
v.13
no.4
/
pp.278-286
/
2008
This paper investigates the fault generation type and the cause of output interruptionsin bulky with $30^{\sim}500[KVA]$ double conversion UPS, and proposes the fault detection method to improve the reliability of power supply used in the critical load in industry. Identifies its existing way of detecting a quality of inverter output it to bypass when exceeds its expectation. Under a UPS managing system, when an inner (Power device, Controller, CPU) fault occurs it disrupts the power supply and these occurrences has been verified by the results of experiments and application results. To overcome these problems, the proposed method constructs independently a fault-detection, a bypass-control device and a triple power supply apart from the conventional UPS operation. Also the detection point is changed to the preceding of a circuit breaker, a reference of fault detection is modified to avoid any clash and the breaking equipment is attached to intercept a spread of accident. As a result of applications of these developed systems to 242 UPS which was installed purposefully to the communication power supply, the service errors has not occurred in the UPS for two years since 2006.
Power quality refers to voltage quality and current quality. Voltage quality means supply reliance such as voltage sag, voltage swell. and short-time interruption. Current quality is related to power factor, harmonic distortion, negative-sequence and zero-sequence current. We fabricated Customer STATCOM to improve current quality such as reactive power, harmonic distortion, and load imbalance. In this paper. We summarize the spec, of STATCOM. its hardware configuration, and control system.
The purpose of this study is to compare the valuation of technology firms in the KOSPI and KOSDAQ. This study analyzed 224 market reports for KOSDAQ firms and 602 reports for KOSPI firms. We compare the two markets under 3 definitions on the accuracy of stock price forecasting. Findings are as follows: Although PER multiples is the most used method of valuation, KOSDAQ valuation more heavily relies on the method than KOSPI valuation. In stock market, the period of earnings forecasting is mostly 2-3 years. Multiples of KOSDAQ is generally higher than those of KOSPI. Even for technology firms, valuation in KOSPI mostly relies on earnings of the company, but that in KOSDAQ mostly relies on relative price. In stock price forecasting, generally overestimation prevails. Moreover, forecasting of KOSPI reports is more accurate than that of KOSDAQ reports. ROE and COE of KOSDAQ firms are generally higher than those of KOSPI firms.
종래 사용되어온 교류발전기의 자동전압조정기는 직류여자기의 계자전류를 제어함으로써 교류 발전기의 단자전압을 일정하게 유지하는 방식이었다. 이경우 정정시의 전압변동을 적게하는 것은 비교적 용이하지만 급격한 부하변동에 대해서는 불경하였다. 즉 발전기에 급히 부하가 걸리면 발전기의 특성에 의하여 결정되는 전압이 순간적으로 떨어지고 또 발전기에는 복권작용이 없고 직류여자기및 제어장치의 시정수에 의한 조정작용의 시간적 늦음이 있기때문에 발전기의 전압은 더욱 강하한다. 이 전압강하의 방지책으로 발전기를 필요이상 크게하여 단종비를 크게하고 또 속응여자를 행하고 있다. 그리고 발전기의 부하가 유도전동기이 가능한 것은 소용량에 한하고 거의 모두 감압기동을 하고 있었다. 이 난점을 보상하기 위해 주회로전류에 의한 복권특성을 갖는 자여자교류발전기가 개발되어 왔으며 근래에는 S.C.R (Silicon Controlled Rectifier)의 발달에 따라 자기증폭기식에서 Transistor-Thyristor식으로 변천하고 있다. 여기서는 자여자발전기를 이용한 정전압장치부 자려자교류벌전기 75KVA에 대한 특성을 소개하고자 한다.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.6
/
pp.1064-1070
/
2007
This paper presents a grid-interactive current controlled voltage source inverter (CCVSI) with uniterruptible power supply (UPS), which uses an inner current control loop (polarized ramp time (PRT)) and outer feedback control loops to improve grid power quality and UPS. To reduce the complexity, cost and number of power conversions, which results in higher efficiency, a single stage CCVSI is used. The operation of this system could be divided into the power quality control (PQC) state mode and the UPS state mode. In PQC mode, the system operated to compensate the reactive power demand by nonlinear load or variation in load. In UPS mode. the system is controlled to provide a sinusoidal voltage at the rated value for the load when the gird fail. To verify the proposed system, a comprehensive evaluation with theoretical analysis, simulation and experimental results for 1KVA load capacity is presented.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.48
no.7
/
pp.363-368
/
1999
The parallel operation system of multiple uninterruptible power supplies(UPSs) is used to increase power capacity of the system or to secure higher reliability at critical loads. In the parallel operation of the two UPSs, the load-sharing control to maintain the current balance between them is a key technique. Because a UPS has low output impedance and quick response characteristics, in case of an unbalanced load inverter output current changes very rapidly and thereby can instantaneously reach an overload condition. In this study, high precise load-sharing controller is proposed and implemented for the parallel operation system of two UPSs with low impedance characteristics and this controller controls the frequency and the voltage to minimize the active power component and the reactive power component which are gotten from the current difference between two UPSs. And then a good performance of the proposed method is verified by experiments in the parallel operation system with two 40KVA UPSs.
본 논문에서는 2대의 다이오드 정류기에 부스트 컨버터를 이용하여 전류의 파형을 능동적으로 만들어 정현파의 입력전류를 얻는 새로운 방식의 고조파 저감방식을 제안한다. 제안한 당식으로 역률 1의 전원 품질을 얻을 수 있으며 입력측의 변동에 대한 출력전압의 조정도 가능하다. 또한 저감된 용량을 갖는 3상 오토 트랜스포머의 사용으로 기존의 $\Delta$-Y 변압기에 비해 KVA정격이 80$\%$ 절감되며 상간변압기도 필요 없다. 본 방식을 소형화와 고품질의 전원이 요구되는 통신용 정류기등에 적용하면 효과적이다. 제안한 방식의 동작원리, 제어 및 설계방법을 기술하고 1.5KW급 시작품으로부터의 실험결과를 제시한다.
This study aims to analyze the valuation of technology firms in the stock market to answer how before-market entities should be valuated. This study analyzes 230 market reports of 2012 for technology firms in the KOSDAQ under several hypotheses. The results are as follows: 90% used the 3 multiples methods consisting of PER multiples with 80%, PBR multiples 8.7% and EBITDA multiples 1.7%. The average of PER multiples was 15 with the range of 6.9 to 83. That of PBR multiples is 2.27. Forecasting for cash flow is not applied over 4 years, but mainly 2-3 years. The accuracy of forecasting was 18.8%, 34.4% and 8% according to the different definitions. No differences were found in the accuracy of forecasting between valuation methods, between the industries having more intangible assets and the industries having less, and between startups and general companies and between ages and listed ages.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.