• 제목/요약/키워드: KTX Passenger

검색결과 98건 처리시간 0.028초

터널에서의 고속철도 압력 변화의 x-t선도 특성에 관한 연구 (A Study on the x-t diagram Characteristics of Pressure Change of High Speed Train in Tunnels)

  • 남성원
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 춘계학술대회
    • /
    • pp.1655-1660
    • /
    • 2004
  • Theoretical study has been conducted to clarify pressure characteristics of KTX(Korea Train eXpress) in tunnel. The external and internal pressure of rolling stock have been measured by using the atmospheric pressure sensors and portable data acquisition system on Seoul-Busan high speed railroad line. These pressure change may give rise to the ear-discomfort for passenger and fatigue for car body. In this study, the tunnels from 200m to 4000m in length have been chosen for the investigation of tunnel length effects. From the results of experiment, the pattern of pressure change generally agrees to RTRI's experimental result for Shinkansen. We found that there are similar patterns of external pressure variation for each critical tunnel length. The critical tunnel lengths are governed by train speed, train length and sonic velocity.

  • PDF

대전북(대전 조차장-대전역) 고속전철 연계 운행 구간의 운전시격 분석 (Headway Analysis in Daejeon Nord section(Daejeon shunting yard-Daejeon station) which high speed train and conventional trains will be run)

  • 김용규;김종기;유창근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 학술회의 논문집 정보 및 제어부문 B
    • /
    • pp.810-813
    • /
    • 2003
  • The present headway on KNR(Korea National Railway) lines varies from 6 to 10 minutes depending on the each line and by the operation of High Speed line in 2004, the bottleneck would be expected within a few sections such as Daejeon-Daejeon shunting yard which will be the common mute between KTX(Korea Train Express) and conventional trains. Therefore, KNR would like to reduce the headway of the all lines by 4 minutes with the implementation of ERTMS/ETCS on-board system. Where ETCS(European Train Control system), the subsystem of ERTMS, is Automatic Train Protection system for safety train running. This study will be analyze expected braking distance and running time depending on characteristics of conventional passenger and freight trains and high speed train will be operated within electrified conventional line for comparing the headways of ATS(Automatic Train Stop) system and ETRMS/ETCS system within the Daejeon-Daejeon shunting yard section.

  • PDF

소음원 기여도 해석 및 벽면 투과손실에 대한 민감도 해석에 의한 한국형 고속철도의 실내소음 예측 (Interior noise prediction of the Korean high speed train using sound source contribution analysis and sensitivity analysis of wall′s transmission loss)

  • 김관주;박진규
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 추계학술대회논문집 II
    • /
    • pp.1093-1098
    • /
    • 2001
  • The interior sound pressure level of the Korean high speed train is predicted using ray acoustic method. The motor car, motorized car and passenger cabin are investigated under the environment of passing open countryside and inside tunnel Calculated sound levels of KHST are compared with the those of KTX prototype which vehicle shows similar acoustic behavior with KHST for the purpose of assuring the calculated data. In order to reduce the calculated SPL in systematic way, contribution analysis of sound sources and sensitivity analysis of concerning wall's transmission loss on the SPL of the designated receiving points are carried out. Finally, practical design suggestions are proposed.

  • PDF

고속철도 교량의 동특성 해석을 위한 준3차원 차량/궤도/교량 상호작용 해석기법의 개발 (Development of a Quasi-Three Dimensional Train/Track/Bridge Interaction Analysis Program for Evaluating Dynamic Characteristics of High Speed Railway Bridges)

  • 김만철
    • 한국전산구조공학회논문집
    • /
    • 제16권2호
    • /
    • pp.141-151
    • /
    • 2003
  • 철도교량은 차량과 교량의 상호작용에 의해 유발되는 동하중을 받고 있다. 이러한 동적인 효과는 교량 각 부재에 충격과 피로를 유발하고, 교량의 잔존수명에 영향을 미치게 된다 따라서 수치적 또는 시험적 방법에 의한 교량의 실제적인 동적 거동을 분석하는 것이 매우 중요하다. 본 논문에서는 KTX 차량의 주행에 따른 교량의 동적 특성을 구조적 안전성, 주행 안전성 및 승차감 측면에서 평가할 수 있는 차량/궤도/교량 상호작용 해석프로그램을 개발하였다. 차량/궤도/교량의 실질적인 모델링을 위하여 차륜/레일 접촉 모델링을 위한 헤르찌안 스프링 및 도상에 대한 윈클러 요소를 적용하였다. 또한 개발 프로그램은 준3차원해석으로 차량의 복선제도 주행에 따른 3차원 편심 효과를 고려하기 위해 비톤 자유도 및 기하학적인 관계에 따른 제약조건식을 사용하였다. 개발프로그램의 검증을 위해서 고속철도교량중 가장 일반적인 형식인 PSC 박스교(2@40m=80m)에 대해 수치해석결과 및 계측시험 결과를 비교하였다.

곡선부 최적 선형 설계기법에 관한 연구 (A Study on Optimum Design for Railway Alignment in Curve)

  • 엄주환;양신추;김은경
    • 한국철도학회논문집
    • /
    • 제12권4호
    • /
    • pp.597-603
    • /
    • 2009
  • 본 연구에서는 승차감을 목적함수로 하고 궤도부담력을 경계조건으로 하는 곡선부 평면선형의 최적설계 기법을 제시하였다. 평면선형 최적화시 중요한 변수인 곡선반경-완화곡선장은 엄주환 등(2009)에서 제시한 결정방법을 적용하였으며 승차감 평가방법은 영국 BSI(2006)에서 제시하는 곡선부 전용 승차감 평가방법인 $P_{CT}$방법을 활용하였다. 또한 한국형 고속전철 G7(KTX-II)모델을 이용한 차량/궤도선형 상호작용 해석을 수행하였다. 해석결과, 최적선형조건은 교각 I(곡선부 양 끝단 직선과 직선이 만나는 교차각) 크기 및 곡선반경-완화곡선장 조합에 따라 다름을 알 수 있었다. 또한 Kufver(1997) 등에서 제시하는 간략화 해석방법과 유사한 경향이 나타남을 알 수 있었으나, 대부분의 경우 동적해석결과 값이 크게 나타났다. 따라서 곡선부 최적선형 설계시 동적해석과 간략화 해석을 병행한다면 신속하고 신뢰성 높은 최적선형을 결정할 수 있을 것으로 판단된다.

다차원척도법을 활용한 지역 간 대중교통 수단들의 유사성에 관한 연구: 간선열차를 중심으로 (Multidimensional Scaling Analysis of Inter-regional Public Transit Services: Focusing on Inter-regional Railways)

  • 권영민;장기태;장인권
    • 한국철도학회논문집
    • /
    • 제19권2호
    • /
    • pp.243-250
    • /
    • 2016
  • 지속적인 경제성장에 더불어 지역 활성화 정책이 시행되면서 지역 간 통행수요가 증가하고 있으며, 이를 다양한 교통수단이 분담하고 있다. 교통 분야에서 저탄소 녹색성장이 강조되면서 친환경 교통수단인 간선열차로 통행수요의 전환을 유도하려는 노력이 이루어지고 있다. 이를 위하여 간선열차와 경쟁적 위치에 있는 대중교통수단들에 대한 승객들의 인식 파악 및 간선열차의 경쟁력 강화 방안에 대한 연구는 필수적이다. 본 연구에서는 6개의 대표적 지역 간 대중교통수단(KTX, ITX-새마을, 무궁화, 우등고속버스, 일반고속버스, 항공기)이 제공하는 서비스 특성에 대한 유사성을 다차원척도 분석을 실시하여 2차원 공간상에 개념적 거리로 표현하고 승객들의 수단 간 유사성 인식정도를 측정하였다. 연구 결과를 통하여 지역 간 대중교통 수단들에 대한 경쟁관계를 파악할 수 있었으며, 이를 통하여 간선열차가 상대적 경쟁우위를 선점하기 위한 방안을 제시하였다.

고속철도 개통이 항공여객 수요변화에 미치는 영향 분석 - 서울-제주간 노선을 중심으로 - (Analysis on the effect of the opening of high speed rail way on the change in the air passenger's demand - Focused on Seoul and Jeju line -)

  • 이준규;유광의;김덕녕
    • 한국항공운항학회지
    • /
    • 제20권1호
    • /
    • pp.26-33
    • /
    • 2012
  • Competition between air transportation and railways has grown fiercer in major countries around the world with the rise of high-speed railways. In South Korea, air passenger travel has been rapidly decreasing since the initial launch of the Seoul-Pusan KTX line in 2004 and second opening that followed in 2010. Further expansion of the high-speed railway is expected. At present, research efforts to verify the validity of constructing an underwater express railway tunnel between Ho-nam and Jeju Island are taking place. Considering the possible high speed railway connection between Seoul and Jeju Island, this thesis has analyzed the choice behavior of existing passengers of the major and low-cost carriers. For this, Stated Preference (SP) research has been performed for three variables, including fare, travel time and the number of runs, to estimate the substitution rate of each of the three variables. Binomial Logit Model has been estimated with the obtained data. The estimation of the model has found that airline passengers of major and low-cost carriers are willing to pay approximately 7,200 KRW and 5,000 KRW, respectively, to reduce travel time by one hour. If the number of runs in one day increases, it has been estimated that the passengers are willing to pay additional fares of about 390 KRW and 30 KRW, respectively. On the other hand, the substitution rate between the number of runs and the travel time was found to be somewhat insignificant. If the construction of the Seoul-Jeju line progresses in the future, this study could be used as preliminary data for determining fares, travel time and the number of runs.

철도와 지역발전 - 대구권 광역전철망 구상과 지역발전 효과 (A Study on Construction of Metro Rapid Transit Network in Daegu Area)

  • 한근수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 특별세미나.특별세션
    • /
    • pp.27-41
    • /
    • 2008
  • Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.

  • PDF

여객/화물 복합열차 HSB의 터널 공력특성에 대한 시뮬레이션 연구 (A Numerical Study on Aerodynamic Characteristics in Tunnel for High Speed Combi Train-HSB)

  • 노주현
    • 한국유체기계학회 논문집
    • /
    • 제17권5호
    • /
    • pp.54-59
    • /
    • 2014
  • The new high speed combi train prototype project was developed which named HSB. It runs over the speed of 330km/h. As the speed of the train exceeds over 300km/h, due to pressure change in tunnel, aerodynamic problems such as sudden drag increase, severe acoustic noise, passenger discomfort and tunnel pressure sonic boom were occurred. This aerodynamic characteristics in tunnel should be reviewed in early design state to enhance the performance and driving quality of new high speed train. In this paper, the aerodynamic characteristics in tunnel for HSB such as pressure waves in tunnel, a rate of pressure change in cabin and micro pressure wave that cause sonic boom outside tunnel are analyzed by 2D axisymmetric CFD simulations. The results are also compared with the value for ordinary high speed train like the KTX-Sancheon. It is helpful how to design the configuration of HSB train. Finally it shows that the HSB train was well designed in tunnel condition because all values fulfill the criterions on UIC code and Korean national regulations.

고속철도 운행선구간에서의 분기기 설치 기법 (The Installation of Turnout on High Speed Operating Line)

  • 최유복;김인재;하복수;신순호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.273-281
    • /
    • 2010
  • 300km/h의 고속으로 운행중인 선로구간에 중간역 설치에 따라 분기기 부설시 기존선로의 레일응력 해소방안이 필요하며 또한 속도제한을 높게 하고 기간을 단축시킬 수 있는 방안을 통해 열차 이용객의 불편을 최소화하여야 한다. 경부고속철도 중간역사 오송, 김천구미역 신설에 따른 분기기 설치는 짧은 야간 차단작업시간(1일 6시간)에 여러 부분으로 나누어 시행하여야 하고 곧바로 고속열차를 운행시켜야 하는 매우 어려운 조건으로서 국내에서는 처음이고 세계적으로도 매우 드문 사례이다. 본 논문에서는 작업조건, 장비, 안전조치 등에 관한 사항을 제시하였다.

  • PDF