• Title/Summary/Keyword: KSLV-I

Search Result 159, Processing Time 0.018 seconds

KSLV-I Kick Motor Nozzle Hydro-Pressure Test (KSLV-1 Kick Motor 노즐 수압시험)

  • Yoo, Jae-Suk;Kim, Byung-Hun;Cho, In-Hyun;Jang, Young-Soon
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.202-209
    • /
    • 2008
  • KSLV-1 2nd stage Kick Motor Nozzle was exposed to high temperature and pressure during the firing. Under the high pressure environment, Kick Motor Nozzle hydro-pressure test was done for verifying the structural safety of the nozzle. The differences with the KM hydro-pressure test [1] are that the real immerged heat resistance material is assembled and the throat heat resistance material is similar with the real one. The hydro-pressure tests were done for the two times of the 125 % of MEOP (975 psi) and the 153 % of the MEOP.

  • PDF

REAL-TIME TRAJECTORY ESTIMATION OF SPACE LAUNCH VEHICLE USING EXTENDED KALMAN FILTER AND UNSCENTED KALMAN FILTER (확장칼만필터와 UNSCENTED 칼만필터를 이용한 우주발사체의 실시간 궤적추정)

  • Baek, Jeong-Ho;Park, Sang-Young;Park, Eun-Seo;Choi, Kyu-Hong;Lim, Hyung-Chul;Park, Jong-Uk
    • Journal of Astronomy and Space Sciences
    • /
    • v.22 no.4
    • /
    • pp.501-512
    • /
    • 2005
  • This research supposed when a fictitious KSIV-I space launch vehicle launches from NARO space center. This compared and analyzed the results from real-time trajectory estimation using the Extended Kalman Filter and the Unscented Kalman Filter. A virtual trajectory and observation data are generated for the fictitious KSLV-I and three measurement radars. The performances of both Otters are compared for several simulations with small initial errors, large initial errors, 20Hz and 10Hz data rate. The results show that the Unscented Kalman Filter yields faster convergence and more accurate than the Extended Kalman Filter for the cases with larger initial error and slower data rate conditions.

Critical Design of Kerosene Filling System for KSLV-II Launch Complex (한국형발사체 발사대시스템 연료공급설비 상세설계)

  • Yeo, Inseok;Kang, Sunil;An, Jaechel;Lee, Jaejun;Seo, Jongweon
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.21 no.3
    • /
    • pp.76-83
    • /
    • 2017
  • Korea Aerospace Research Institute(KARI) has been developing a new launch vehicle Korea Space Launch Vehicle-II(KSLV-II) with their own technology. Thus, it is required a new launch complex that corresponds to a new propulsion system of launch vehicle. Because widely changing of KSLV-II comparing with KSLV-I such as thrust of engine system, composition of vehicle staging, pneumo-hydraulic scheme of propulsion system, it is important to establishing appropriate ground support equipments for fuel(kerosene) filling. In this critical design process, specific supply line and specification of components are designed and the concept of kerosene filling is determined based on results of preliminary design. Also, plans of supply operation and prerequisite are established and operation algorithms are formed.

금속재 세미 모노코크 콘형 구조체의 정적 구조 시험

  • Park, Soon-Hong;Jang, Young-Soon;Yi, Yeong-Moo
    • Aerospace Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.129-142
    • /
    • 2005
  • A semi-monocoque truncated cone structure, which is a main structure for the payload adapter of KSLV-I, was designed. Static test was performed to confirm the reliability of the cone structure under the design loads. Strains and displacements are measured during four load cases; the compressive axial, pure bending, pure shear, and combined loading conditions. The results showed that the cone structure satisfies the design requirements. An equivalent axial load was applied to the cone structure so that the global buckling of the cone structure occurred. The measured buckling load was compared with the predicted one by finite element method. The results show a good agreement.

  • PDF

Prototype 모델 MDU의 신뢰도 예측

  • Kim, Joon-Yun;Jung, Hae-Seung;Lee, Jae-Deuk
    • Aerospace Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.203-210
    • /
    • 2005
  • Prototype model of MDU(Master Data Unit), to be employed on KSLV-I, has been developed and tested being interfaced with other units. Before stepping into the development of engineering and flight model phases, we have carried out reliability prediction of prototype MDU in order to assure availability of the unit. This paper describes the method of reliability prediction of prototype MDU and prediction results based on MIL-HDBK-217F, 'Electronic Reliability Design Handbook'.

  • PDF

KSLV-I Kick Motor System Thrust Axis Alignment (KSLV-I 킥모터 시스템 추력 축 정렬)

  • Lee, Han-Ju;Jung, Dong-Ho;Oh, Seung-Hyub
    • Aerospace Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.138-142
    • /
    • 2010
  • The thrust axis alignment of the launch vehicle is very important because of the misalignment causes the unstable attitude control and results in mission failure. Generally, optical methods such as digital theodolite and laser tracker and mechanical method such as turn table method are used to align thrust axis to vehicle axis. This article deals with the simple method of thrust axis alignment of Kick Motor.

An Evaluation on the Limit cycle Analysis Methods using the Hardware in the Loop Simulation (실시간 모의시험을 통한 리밋 사이클 해석 결과 분석)

  • Jeon, Sang-Woon
    • Aerospace Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.145-157
    • /
    • 2012
  • The novel limit cycle analysis of the attitude control system using jet thrusters was presented based on a phase plane method by paper. It was shown in the software simulation results that the analysed results of the limit cycle was more accurate than those of the Haloulakos' method. But it was not verified in the real system. The proposed method is verified in the reaction control system for KSLV-I via an real time hardware in the loop simulation. It can be shown in this test that analyzed result of the limit cycle is very accurate.

Foreign Launch Vehicle Upper Stage Collision and Contamination Avoidance Maneuver Analysis (해외 발사체 상단의 충돌 및 오염 회피 기동 분석)

  • Park, Chang-Su;Cho, Sang-Bum;Song, Eun-Jung;Roh, Woong-Rae
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.194-201
    • /
    • 2008
  • The launch vehicle upper stage generally executes collision and contamination avoidance maneuver after the satellite separation. Through this maneuver the satellite safely settles in its orbit and the launch vehicle moves away from the satellite with minimum contamination. In this paper collision and contamination avoidance maneuvers by foreign launch vehicles are analyzed. Criteria for satellite contamination during the avoidance maneuver is given for KSLV-I upperstage.

  • PDF

Day-to-Day Repeatability of the Navigation Solution and SNR from the GPS Receiver installed on KSLV-I (나로호에 탑재된 GPS 수신기의 항법해와 신호대잡음비의 일반복 특성)

  • Kwon, Byung-Moon;Moon, Ji-Hyeon;Shin, Yong-Sul;Choi, Hyung-Don;Cho, Gwang-Rae
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.39 no.8
    • /
    • pp.774-787
    • /
    • 2011
  • This paper deals with quantitative analysis about the characteristics of GNSS(Global Navigation Satellite System) signals contaminated with multipath signals and day-to-day repeatability of the navigation solution and SNR(Signal to Noise Ratio) caused by multipath signals using the collected data from GPS receiver installed on KSLV-I which was on standby on the launch pad at Naro Space Center. Since the GPS antennas, surrounding environments and GPS satellite orbits were very slightly changed with respect to the day, the repeating pattern of the solution and SNR caused by the multipath signals was verified from the collected data. Analytic result of the multipath effects and day-to-day repeatability of the navigation solution and SNR observed at the launch pad would be used for obtaining more stable performance of the GPS receiver when the satellite launch vehicles are on standby.

Development and Test of Line-Telemetry DPS for KSLV-I Upper Stage (나로호 상단부 Line-Telemetry 데이터처리시스템 개발 및 시험)

  • Kim, Kwang-Soo;Lee, Soo-Jin;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.107-115
    • /
    • 2011
  • The line-telemetry data processing system is necessary for monitoring the status of each onboard systems of KSLV-I upper stage during the ground tests and launch preparation. The mission of line-telemetry system is to provide reference telemetry data and to monitor the status of upper stage. The line-telemetry data processing system consists of a PCM acquisition/processing server, a system management server, and 9 monitoring consoles. In this paper, we will describe the overview of onboard remote measurement system, the design of the line-telemetry data processing system, anomaly setup information for indicating alarm signal in case of abnormal occurrence, and the result of the ground test and flight test.