• 제목/요약/키워드: KHNP

검색결과 359건 처리시간 0.033초

Thermal Evaluation of the KN-12 Transport Cask

  • Chung, Sung-Hwan;Chae, Kyoung-Myoung;Choi, Byung-Il;Lee, Heung-Young;Song, Myung-Jae
    • Journal of Radiation Protection and Research
    • /
    • 제28권4호
    • /
    • pp.281-290
    • /
    • 2003
  • The KN-12 spent nuclear fuel transport cask, which is a Type B(U) package designed to comply with the requirements of Korea Atomic Energy Act[1], IAEA Safety Standards Series No.TS-R-1[2] and US 10 CFR Part 71[3], is designed for carrying up to 12 PWR spent fuel assemblies in a basket structure. The cask has been licensed in accordance with Korea Atomic Energy Act and was fabricated in Korea in accordance with the requirements of ASME B&PV Sec.III, Div.3[4]. The cask must maintain thermal integrity in accordance with the related regulations and be evaluated to verify that the thermal performance of the cask complies with the regulatory requirements. The temperatures of the cask and components were determined by using finite elements methods with a numerical tool, safety tests using an 1/8 height slice model of the real cask were conducted to demonstrate verification of the numerical tool and methods, and heat transfer tests for normal transport conditions were performed as a fabrication acceptance test to demonstrate the heat transfer capability of the cask.

Equivalency Assessment for an Eddy Current System Used for Steam Generator Tubing Inspection

  • Cho, Chan-Hee;Lee, Tae-Hun;Yoo, Hyun-Ju;Moon, Gyoon-Young
    • 비파괴검사학회지
    • /
    • 제35권4호
    • /
    • pp.258-267
    • /
    • 2015
  • Eddy current testing is widely used for inspecting steam generator tubing in nuclear power plants (NPPs). The inspection technique for steam generator tubing in NPPs should be qualified in accordance with examination guidelines. When the components of a qualified system such as eddy current tester, probe, and data analysis program, are changed, the equivalency of the modified system to the originally qualified system must be verified. The eddy current tester is the most important part of an eddy current testing system because it excites and transmits alternating currents to the probe, receives coil impedance of the probe and generates signals for anomalies. The Korea Hydro & Nuclear Power Co., Ltd. (KHNP) developed an eddy current testing system with an eddy current tester and data acquisition-analysis program for inspecting the steam generator tubing in NPPs; this system can be used for an array probe and as a bobbin and rotating probes. The equivalency assessment for the currently developed system was carried out, and we describe the results in this paper.