• Title/Summary/Keyword: KEPCO System

Search Result 1,667, Processing Time 0.03 seconds

Large-scale 3D SSI Analysis using KIESSI-3D Program (KIESSI-3D 프로그램을 이용한 대형 3차원 SSI 해석)

  • Lee, Eun-Haeng;Kim, Jae-Min;Seo, Choon-Gyo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.6
    • /
    • pp.439-445
    • /
    • 2013
  • The soil-structure interaction(SSI) effect should be considered to accurately assess the seismic response of structure constructed on soft soil site other than the hard bedrock. Recently, the demand of SSI analysis has increased due to strengthening of the regulatory guidelines of nuclear power plant such as the USNRC SRP 3.7.2. In this study an accuracy and running time of the KIESSI-3D program for large-scale 3D SSI analysis were investigated. The seismic SSI analysis using the KIESSI-3D program was performed for several examples of large-scale three-dimensional soil-structure interaction system. The analysis results were compared with those of the ACS/SASSI program. Good agreements in transfer functions at selected locations showd that KIESSI-3D yields accurate solution for large-scale SSI problem. Moreover, it was found that running speed of the KIESSI-3D for large-scale 3D SSI analysis is much faster than that of the ACS/SASSI about 30~2000 times.

C00rdinated Testing between transformer Tap Selection and Inverter Voilage Control in the PV Distributed Generation system (태양광 분산 발전 시스템의 계통연계용 변압기탭 선정과 인버터전압조정 협조시험)

  • Yoon, kap koo;CHO, SeongSoo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1098-1099
    • /
    • 2015
  • ${\bullet}$ 시험대상: 영월태양광 4,990kW(998kW ${\times}$ 5호) ${\bullet}$ 13.07.31 연계기술검토의뢰 ${\bullet}$ 13.08.28 한전검토결과: 인근변전소 영월S/S(40MW) 초과로 10.8km 지점의 평창 D/L 평창간 347호 주진S/S에 다음의 보완대책과 연계 권고 ${\cdot}$ 문제점: 적정전압이탈 및 순시전압변동률 유지불가 ${\cdot}$ 연계기준만족을 위해 한전에서 제시한 보완대책 : 계통용량증설(설비보강), 연계용량 감소 및 전용선로 연계 ${\bullet}$ 14.01.09 분산형설치자의 용역사(에이스기술단)에서 송배전용전기설비 이용규정과 연계기준 만족을 위한 보완대책 제안 ${\cdot}$ 태양광발전시스템 인버터 자동전압(역률/무효전력) 조정기능 및 감시설비 구비 ${\cdot}$ 최적 공통연결점 선정: 분산형전원으로 부터 전기적으로 가장 가까운 영월D/L 영월S/S측에 개폐장치설치 하고 주진S/S 측으로 연계 ${\bullet}$ 14.01.29~06.19 한전(전력연구원)의 유효성 검토 ${\cdot}$ 보완대책 기술적 유효(실증시험 시행 후 시행공문 발송 예정) ${\bullet}$ 14.08.08 송배전용전기설비 이용규정 개정에 따른 협의 ${\cdot}$ 변압기 대당 20MW에서 25MW ${\cdot}$ 변전소 전체 60MW에서 75MW까지 허용 ${\cdot}$ 영월 S/S 측 문곡/영월 D/L 연계 공사 협의 ${\bullet}$ 14.10.04 사용전검사, 한전계통연계운전 시작 ${\bullet}$ 인버터 고정역률(99.9~100%) 운전 시험 ${\cdot}$ 14.11.21 22.9kV 계전기(SEL-751) 5대, 15분 간격 자료저장 ${\cdot}$ SEL-751/USB to RS232C/노트북 15분간격 측정(첨부) ${\bullet}$ 14.03.07 인버터 역률 95.0% 조정 15분간격 측정(첨부) ${\bullet}$ 변압기탭 선정과 인버터전압조정협조시험 계획 ${\cdot}$ 변압기탭을 현장에서 상하 1탭씩 변경 ${\cdot}$ 인버터역률을 인버터공급사에서 원격조정 ${\cdot}$ 22.9kV 보호계전기 SEL-751, 15분 간격 측정 ${\cdot}$ 인버터 370V 계전기 K-PAM DG3000/현장감시설비 연계 ${\cdot}$ 15분 간격 측정 저장 ${\cdot}$ 현장감시설비/인터넷 연결 원격측정(첨부예정)

  • PDF

A Modified EGEAS Model with Avoided Cost and the Optimization of Generation Expansion Plan (회피비용을 고려한 EGEAS 모형 개발과 전원개발계획의 최적화)

  • 이재관;홍성의
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.1
    • /
    • pp.117-117
    • /
    • 1992
  • Pubilc utility industries including the electric utility industry are facing a new stream of privatization com-petition with the private sector and deregulation. The necewssity to solve now and in the future power supply and demand problems has been increasing through the sophisticated generation expansion plan(GEP) approach con-sidering not only KEPCo's supply-side resources but also outside resources such as non-utility generation(NUG) demand-side management (DSM). Under the environmental situation in the current electric utility industry a new approach is needed to acquire multiple resources competitively. This study presents the development of a modified electric generation expansion analysis system(EGEAS) model with avoided cost based on the existing EGEAS model which is a dynamic program to develope an optimal generation expansion plan for the electric utility. We are trying to find optimal GEP in Korea's case using our modified model and observe the difference for the level of reliabilities such as the reserve margin(RM) loss of load probability(LOLP) and expected unserved energy percent(EUEP) between the existing EGEAS model and our model. In addition we are trying to calculate avoided cost for NUG resources which is a criterion to evaluate herem and test possibility of connection calculation of avoided cost with GEP implementation using our modified model. The results of our case study are as follows. First we were able to find that the generation expansion plan and reliability measures were largely influenced by capacity size and loading status of NUG resources, Second we were able to find that avoided cost which are criteria to evaluate NUG resources could be calculated by using our modified EGEAS model with avoided cost. We also note that avoided costs were calculated by our model in connection with generation expansion plans.

The study on the effect of fracture zone and its orientation on the behavior of shield TBM cable tunnel (단층파쇄대 규모 및 조우 조건에 따른 전력구 쉴드 TBM 터널의 거동 특성 분석)

  • Cho, Won-Sub;Song, Ki-Il;Kim, Kyoung-Yul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.4
    • /
    • pp.403-415
    • /
    • 2014
  • Recently, the temperature rise in the summer due to climate change, power usage is increasing rapidly. As a result, power generation facilities have been newly completed and the need for ultra-high-voltage transmission line for power transmission of electricity to the urban area has increased. The mechanized tunnelling method using a shield TBM have an advantage that it can minimize vibrations transmitted to the ground and ground subsidence as compared with the conventional tunnelling method. Despite the popularity of shield TBM for cable tunnel construction, study on the mechanical behavior of cable tunnel driven by shield TBM is insufficient. Thus, in this study, the effect of fractured zone ahead of tunnel face on the mechanical behavior of the shield TBM cable tunnel is investigated. In addition, it is intended to compare the behavior characteristics of the fractured zone with continuous model and applying the interface elements. Tunnelling with shield TBM is simulated using 3D FEM. According to the change of the direction and magnitude of the fractured zone, Sectional forces such as axial force, shear force and bending moment are monitored and vertical displacement at the ground surface is measured. Based on the stability analysis with the results obtained from the numerical analysis, it is possible to predict fractured zone ahead of the shield TBM and ensure the stability of the tunnel structure.

Economic Welfare Study on Seasonal and Time Period Electricity Pricing (계시별 전력가격에 대한 경제적 후생 연구)

  • Yoo, Young-Hoon;Kim, SungSoo
    • Environmental and Resource Economics Review
    • /
    • v.14 no.2
    • /
    • pp.519-547
    • /
    • 2005
  • The aim of this study is to analysis how economic welfare lost happens within the present korea seasonal and time period electricity pricing system and find out reasonable electricity price system acceptable during the transitional period of korea electricity industry restructuring To analyze economic welfare lost in the electricity industry, in advance seasonal and time periodic 9 demand curves(summer, spring &fall, winter/peak-load time, middle-load time, low-load time) and one market supply curve are made and then using these demand and supply curve, seasonal and time periodic market equilibrium prices is calculated. Finally, comparing these market equilibrium prices with present regulated classified seasonal and time periodic prices, the whole economic welfare lost in the electricity industry is calculated. The result of this study shows that in 2002, the total economic welfare lost in electricity industry is 137,770 million Won and under present price system, the worst welfare lost is happening seasonally in spring & fall, time periodically in the middle-load time. Specifically analyzing the characteristics of welfare lost, especially on the industry customers and service customers which are applied in seasonal and time periodic pricing, for the industry customers, the welfare lost calculated in this class occupies 51% of the total welfare lost in the whole electricity industry and the worst welfare lost is happening seasonally in spring & fall, time periodically in the middle-load time. For service customers, the welfare lost calculated in this class occupies 13% of the total welfare lost in the whole electricity industry and the worst welfare lost is happening seasonally in summer, time periodically in the peak time Finally, this study was made based on the year of 2002 and KEPCO has practiced two times of rate change until now. The result of rate change was positively analyzed in the direction of economic welfare improvement(welfare improvement achieved by 16.3% compared to 2002 result).

  • PDF

Work & Life Balance and Conflict among Employees : Work-life Balance Effect that Reflects Work Characteristics (일·생활 균형과 구성원간 갈등관계 : 직장 내 업무 특성을 반영한 WLB 효과 중심으로)

  • Lee, Yang-pyo;Choi, Chang-bum
    • Journal of Venture Innovation
    • /
    • v.7 no.1
    • /
    • pp.183-200
    • /
    • 2024
  • Recently, with the MZ generation's entry into society and the social participation of the female population, conflicts are occurring between workplace groups that value WLB and existing groups that emphasize collaboration due to differences in work orientation. Public institutions and companies that utilize work-life balance support systems show differences in job Commitment depending on the nature of the work and the activation of the support system. Accordingly, it is necessary to verify the effectiveness of the WLB support system actually operated by the company and present universally valid standards. The purpose of this study is, first, to verify the effectiveness of the support system for work-life balance and to find practical consensus amid changes in policies and perceptions of the working environment. Second, the influence of work-life balance level and job immersion according to work characteristics was analyzed to verify the mutual influence in order to establish standards for WLB operation that reflects work characteristics. For the study, a 2X2 matrix model was used to analyze the impact of work-life balance and work characteristics on job commitment, and four hypotheses were established. First, analysis of the job involvement level of conflict-type group members, second, analysis of the job involvement level of leading group members, third, analysis of the job involvement level of agreeable group members, and fourth, analysis of the job involvement level of cooperative group members. To conduct this study, an online survey was conducted targeting employees working in public institutions and large corporations. The survey was conducted for a total of 9 days from October 23 to 31, 2023, and 163 people responded, and the analysis was based on a valid sample of 152 people, excluding 11 copies that were insincere responses or gave up midway. As a result of the study's hypothesis testing, first, the conflict type group was found to have the lowest level of job engagement at 1.43. Second, the proactive group showed the highest level of job engagement at 4.54. Third, the conformity group showed a slightly lower level of job involvement at 2.58. Fourth, the cooperative group showed a slightly higher level of job involvement at 3.80. The academic implications of the study are that it subdivides employees' personalities into factors based on the level of work-life balance and nature of work. The practical implications of the study are that it analyzes the effectiveness of WLB support systems operated by public institutions and large corporations by grouping them.

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.