• 제목/요약/키워드: Jung Kwang-soo

검색결과 1,048건 처리시간 0.034초

병렬 컴퓨팅을 이용한 영구자석 직류전동기의 최적설계 (Optimal Design of Permanent Magnet DC Motor Using Parallel Computing Method)

  • 조명수;이철균;김재광;정현교
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 B
    • /
    • pp.649-650
    • /
    • 2006
  • In this paper, finite element analysis (FEA)-based optimization using Internet distributed computing is proposed for the real world and complex optimization such as optimal design of permanent magnet do motor (PMDCM).

  • PDF

고온초전도체의 자기자계손실 측정 (Measurement of the Self-field Loss in the HTS Tape)

  • 심정욱;차귀수;이지광;한승엽
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 A
    • /
    • pp.274-276
    • /
    • 1999
  • Transport current is the HTS tape generates the self field loss. To measure the self field loss, rectangular voltage tap has been used. In this paper, self field loss was measured using the spiral voltage tap method. Result of the measurement was compared with that of the theoretical.

  • PDF

터널공사 사례분석에 의한 설계변경 표준프로세스 구성방안 (Case Study and Standard Process Analysis of Change Order in Design for Road Tunnel Project)

  • 강인석;김동광;정원명;이승렬;김현수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.1149-1152
    • /
    • 2005
  • Recently, tunnel structure is being widely used in railway or roadway construction projects because earthwork causes large cutting and damages in environmental factors. However, there are many changes of design by different items comparing with design phase in tunnel structure by uncertain drawings. This study develops a standard process for the change of design to reduce change orders in construction phase.

  • PDF

풍황 및 계통여건을 고려한 강원지역 풍력실증단지 적정입지 분석 (Feasibility Study for the Construction of Wind Farm)

  • 이정은;정종찬;기우봉;김현한;이규삼;김광호;장길수;강상희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.768-769
    • /
    • 2007
  • 국내의 풍력자원과 계통자원을 함께 고려해 강원도 풍력발전단지의 최적입지 타당성을 검증. 국내의 풍황 자료를 조사하고 우수한 지역 5곳을 선정한 후, WASP 프로그램을 이용해 최대 에너지 생산 가능한 지역에 풍력발전기의 배치를 결정하였다.

  • PDF