• Title/Summary/Keyword: JIT

Search Result 279, Processing Time 0.023 seconds

A Trace-based Precompile Method for Improving the Response Times of Android Applications (안드로이드 응용의 응답 시간 향상을 위한 트레이스 기반 프리컴파일 기법)

  • Hong, Sunggil;Kim, Kanghee
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.2 no.6
    • /
    • pp.231-236
    • /
    • 2013
  • Recently, to improve the user response times of Android applications, several studies have been proposed to combine the idea of Ahead-of-Time compilation into Dalvik virtual machine, which uses Just-in-Time compilation. The studies, however, require modifications of the Dalvik executables of target applications, thus are difficult to be adopted for legacy applications already deployed. This paper proposes a JITwP(JIT with Precompile) technique that precompiles hot traces at application launch time with no modification of the Dalvik executable. It improves the user response times of target applications by providing precompile hints prepared offline. Our experimental results demonstrate a 4% improvement in terms of execution time for the Web browser application.

Moderate Effect of JIT and Workforce Management on Infra and Process Factor in Quality Management Practices (품질경영 실행방식 요인과 성과 간 관계에 대한 JIT와 인력관리의 조절 효과)

  • Park, Jeong-Soo;Chang, Deok-Shin;Kim, Soo-Wook
    • Korean Management Science Review
    • /
    • v.27 no.3
    • /
    • pp.99-115
    • /
    • 2010
  • We classified quality management practices of manufacturing companies into 'Infra' factor and 'Process' factor which were introduced based on existing literatures and previous studies related to quality management. It was our first objective to confirm its conformance in Korean manufacturing industry, and to examine the two factors effect positively on production performance. Moreover, we tried to examine whether JIT and workforce management have an moderate effect on 'Infra and Process factors-performance' relationship, using moderate regression. As the result of empirical study on nationwide manufacturing companies, we had the results that the classification between Infra factor and Process factor in quality management practices was valid in Korean manufacturing companies, and that the two factors gave performances positive effect. Moreover, our secondary analysis showed that JIT had an positive moderate effect on the Infra factor while workforce management on the Process factor. With these results, we have an interpretation that manufacturing companies which aim to enhance short term performances have to concentrate their effort and investment on Process factor and, on the other hand, ones which aims to improve long term performances on Infra factor.

Scheduling of a Casting Sequence Under Just-In-Time (JIT) Production (적시 생산 방식에서의 주조공정 스케줄링)

  • Park, Yong-Kuk;Yang, Jung-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.40-48
    • /
    • 2009
  • In this article, scheduling of a casting sequence is studied in a casting foundry which must deliver products according to the Just-in-time(JIT) production policy of a customer. When a foundry manufactures a variety of casts with an identical alloy simultaneously, it frequently faces the task of production scheduling. An optimal casting schedule should be emphasized in order to maximize the production rate and raw material efficiency under the constraints of limited resources; melting furnaces and operation time for a casting machine. To solve this practical problem-fulfilling the objectives of casting the assigned mixed orders for the highest raw material efficiency in a way specified by the customer's JIT schedule, we implement simple integer programming. A simulation to solve a real production problem in a typical casting plant proves that the proposed method provides a feasible solution with a high accuracy for a complex, multi-variable and multi-constraint optimization problem. Employing this simple methodology, a casting foundry having an automated casting machine can produce a mixed order of casts with a maximum furnace utilization within the due date, and provide them according to their customer's JIT inventory policy.

동적인 제조환경에서의 유연한 생산 스케줄링을 위한 TOC/JIT/MRP 통합 모델에 관한 연구

  • Ji, Yeong-Ju
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.383-386
    • /
    • 2004
  • 급변하는 시장환경으로 인한 제조의 복잡성과 동적 특성의 증대로 인해 기업은 재공품의 감소, 납기일 준수를 위한 기술적 방법의 개발과 조화의 중요성을 인식하고 있다. 이에 기존에 사용하고 있는 MRP, JIT의 생산계획 및 통제 방식은 적용하는 데 있어 단점을 지니고 있다. 이에 최근 각광 받고 있는 TOC의 DBR 방식을 이해하고 기존 생산시스템(MRP, JIT)의 단점을 극복하고 동적인 생산환경에서도 효율적으로 생산 가능한 유연한 생산 스케줄링 모델을 개발하고자 한다. 개발된 생산 스케줄링 모델은 동적인 제조환경에서 효율적이고 유연한 생산 계획 및 통제 시스템이 될 것이며, 비용절감과 함께 기업의 생산성을 향상시킬 것이다. 또한, 이런 유연 생산 스케줄링을 증명하기 위해 프로토타입을 통해 그 효과를 증명하여 보기로 한다.

  • PDF

Analysis of inventory strategy of middle-small company which are ordered form large company which product using JIT(just in time) system (JIT를 적용하는 대기업에 납품하는 중소기업의 재고정책)

  • 이상복
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.117-120
    • /
    • 1997
  • In this paper, we analyze Inventory Strategy of our country middle-small Company which are ordered form large Company which product using JIT(just in time) System. Until now, we have not found a good inventory strategy for middle small Company which such like above. In this paper, we first simply survey product lead time, lot size and safety inventory in continuous product system which idea can be adapted our object. We try to mathematical modelling of product lead time, total inventory cost of bur country middle-small Company. We suggest inventory strategy for middle-small Company.

  • PDF

An Integrated Inventory Model for a Vendor-Buyer Supply Chain in a JIT Purchasing (다원자재를 고려한 구매업자와 공급업자간 공급사슬에서의 통합재고모형에 관한 연구)

  • Kim, Dae-Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.159-167
    • /
    • 2009
  • In this paper, we consider a single-vendor single-buyer supply chain problem where a single vendor orders raw materials from its supplier, then using its manufacturing processes converts the raw materials to finished goods in order to deliver finished goods to a single buyer for effective implementation of Just-In-Time Purchasing. An integrated lot-splitting model of facilitating multiple shipments in small lots between buyer and supplier is developed in a JIT Purchasing environment. Also, an iterative heuristic solution procedure is developed to find the order quantity for finished goods and raw materials, and number of shipments between buyer and supplier. We show by numerical example that when the integrated policy is adopted by both vendor and buyer in a cooperative manner, both parties can benefit.

Sequencing Control By Group Concept For Mixed-Model Assembly Lines In JIT (적시적정생산시스템에서 그룹개념을 이용한 조립순서 제어)

  • 최정상;박찬용;김경석
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.11
    • /
    • pp.20-26
    • /
    • 1995
  • 본 연구는 JIT생산시스템에서 혼합조립라인에 대한 제품순서게획에 대한 연구이다. 본 연구에서 고려하는 조립라인을 효과적으로 수행하기 위해서는 서로 다른 제품들을 조립하기 위한 제품순서가 결정되어야 한다. 필요한 제품을 적시에 적당한 양만큼 생산하는 JIT생산시스템에서의 제품 순서계획의 목적은 라인에서 소비 되는 모든 부품들의 소비율을 일정하게 유지시키는 것이다. 본 연구에서는 부품소비율을 일정하게 유지시키 면서 동시에 순서계획수립시 계획파괴를 줄일수 있도록 그룹개념을 이용하여 순서계획문제를 정식화하고 이 에 대한 해법을 제시하였다. 본 연구에서 개발한 해법의 우수성을 평가하기 위해 총변동과 순서계획의 파괴빈도에 대한 실험을 통하여 기존해법과 비교한 결과 본 연구의 해법이 우수한 결과를 제공하였다.

  • PDF

간판시스템(JIT)에 있어서의 간판매수결정에 관한 연구 2

  • 홍성찬;복산충소
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1991.10a
    • /
    • pp.27-38
    • /
    • 1991
  • 최근 관심의 대상이 되고 있는 JIT시스템은 간판매수 결정이 그 무엇보다도 중요하다 하겠다. 제1보에 있어서는 단일 제품인 경우에 있어서의 간판매수 결정법을 제안했다. 본 논문에서는, 복수의 제품이 다단계 생산 시스템을 흘러가는 경우, 1) 공정에서의 간판용량이 다른경우 2) 제품에 공통하는 부품의 공정이 있는 경우 3) 공통부품공수가 있지만 제품에 따라 흘러가는 공정이 다른 경우 등을 고려한다. 또한 종래의 코스트 최소화만의 사고를 탈피, 간판매수의 결정에 있어 중요한 요인을 정리 간판매수결정 방법을 제시하는데 있다. 구체적으로, 간판매수의 결정에 있어 중요한 요인으로써 수요, 공정간의 목표, 재고수준, 재고비용, 노무비용, 하청업체의 공급능력, 작업자의 작업시간을 고려한다. 또한, JIT시스템의 전제조건의 하나인 평준화생산을 실시하기 위하여 작업시간에 있어서 기간별 공정별 부하 밸런스를 고려한다. 그리고, 수리계획법의 하나인 다목표계획법에 의한 문제의 형식으로 모델화하고, 모델에 대한 수리적 검증을 실행한다.

  • PDF

A Study on the Optimal Design of JIT Kanban System under Uncertain Environment (불확실한 환경하에서의 JIT 간판 시스템 최적설계에 관한 연구)

  • 김용범;김우열
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.1
    • /
    • pp.176-188
    • /
    • 1998
  • In this paper, it is identified that the optimal level of each performance measures (service and inventory level) is not sensitive to an uncertain environment under JIT Kanban system designed by Moeeni. Moreover, it is proposed that the optimal design method considering multiple performance characteristics is the optimal level decision method according to the relative importance differences of each performance when there exist multiple performance characteristics. The result from the simulation analysis shows that the number of Kanban for stage 3 (final process) and stage 2 is increased at the service level. It is found that the expected loss is minimal when the cycle time decreases and the container size increases. However, the stage 1 is not affected by the number and cycle time of Kanban. It is thus important to consider carefully the cycle time and the container size of the Kanban to satisfy the demand in right time. In case of inventory level, the working inventory level decreases when the container size is decreased and the working inventory level also decreases slightly when the cycle time of the Kankban is increased in stage 1 and 2.

  • PDF

An Integrated Inventory Model for Multi-Product and its Raw Materials in Just-In-Time Purchasing (JIT구매 하에서 원자재를 고려한 다품목의 통합재고모형에 관한 연구)

  • Kim, Dae-Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.1
    • /
    • pp.49-58
    • /
    • 2008
  • In this paper, we consider an inventory system where a single supplier purchases and processes raw materials into finished goods in order to deliver finished goods to a single buyer for effective implementation of Just-In-Time Purchasing. An integrated multi-item lot-splitting model of facilitating multiple shipments in small lots between buyer and supplier is developed in a JIT Purchasing environment. Also, an iterative solution procedure is developed to find the order quantity for finished goods and raw materials, and number of shipments between buyer and supplier. We show by numerical example that when the integrated policy is adopted by both buyer and supplier in a cooperative manner, both parties can benefit.