International conference on construction engineering and project management
/
2007.03a
/
pp.41-49
/
2007
GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry
국내/외 제조업체 또는 유통업체가 경쟁력 있는 제품의 생산/판매를 위해 최적의 부품 및 제품을 최단 시간내, 최저 가격으로 조달하기 위한 Global sourcing체계 구축과 그에 따른 재고부담을 회피하면서 제품을 소비자에게 신속히 전달하려는 공급선관리 (Supply Chain Management : SCM)의 의지가 높아지고 있다. 이에 따라 제조업체나 유통업체가 자체 재고 및 관리부담을 감소시키기 위해 JIT(Just In Time)체계의 업무형태를 도입하고 있고 부품 및 제품을 공급하는 공급자에게 제조업체의 재고를 관리하게 하는 형태인 이른바 공급자 재고관리(Supplier Managed Inventory: SMI)가 공급업체에게 요구되고 있다. 또한 최근 국내 제조업의 생산기반이 급속히 해외이전 됨에 따라 해리 생산거점과 국내본사, 주문자에 이르는 전 과정에 걸친 물류 및 정보전달 체계를 확보해야 하는 상황에서 공급업체는 주문업체로부터 주문한 내용의 진행상황과 자동적인 재고의 판단 및 보충에 이르는 전 과정의 프로세스 관리 및 관련 정보제공을 요구 받고있다. 이와 같은 환경에 대응하기 위해 본 발표에는 공급자 재고관리의 정의 및 Global business 환경에서 EDI를 통한 System의 구축방안 및 고려사항을 제시하고자 한다.
Journal of Korea Society of Industrial Information Systems
/
v.19
no.5
/
pp.81-90
/
2014
It is an element certainly required for the cost reduction of a company that forward and reverse logistics chain are unified and constitutes a resource closed-loop supply chain (CLSC). In this study, the inventory control which unifies inventory of distribution centers (DCs) of forward logistics and processing center of reverse logistics in the CLSC environment is proposed. The inventory system model for newly-constructed CLSC considers the JIT(Just-In-Time) delivery from the processing center to the manufacturer, including the making of decisions on whether to wait for the arrival of end-of-life products or to back-order necessary products for manufacturer when the supply of end-of-life products at the processing center via the returning center is insufficient for the demands of the manufacturers. The validity of the proposed model was verified using the genetic algorithm (GA). In order that a parameter might investigate the effect which it has on a solution, the simulation was carried out for priGA(priority-based GA) on three kinds of parameter conditions. Moreover, mhGA(modified hybrid GA) to which a parameter is adjusted for every Study on Reducing Logistics Costs and Inventory Control System according to facilities integration in the Closed-Loop Supply Chain Environment generation, the simulation was carried out to a four-kind numerical example.
The aim of this study is to consider the physical distribution system of assembly supplied from $1^{st}$ supplier and module corporation to automobile assembly plant through analysis of existing literatures and interview survey. The major findings of this study are as follows. Parts supply of automobile are to bind together with many regional parts supplier than using multi frequency and small delivery of JIT. Regional physical distribution center of joint parts and integrated physical distribution information center is to be installed in neighboring region of automobile assembly plant in order to reduce the transport cost by designating and activating multiple physical distribution and transport companies in each automobile assembly plant and turning into effective high volume shipping system.
Park, Il Ha;Park, Yong Gul;Kim, Sigon;Kim, Yeon Kyu
Journal of Korean Society of Transportation
/
v.32
no.3
/
pp.227-238
/
2014
There is no question that railroad investment is crucial for better transport systems and the Korean government has continued to invest in railroad facilities. Nevertheless, the modal share of railroad, in particular, for freight has decreased. This is because rail freight transport can hardly meet customer needs such as just-in-time(JIT), a door-to-door service, compared to road transport, to be specific, trucking which can directly carry the freights to the final destinations. This has made the value of the railroad infrastructure less, which has been operated for the past 114 years. This study proposes a new freight movement concept called Piggy Back System. This system can carry freight trucks on the trains and deliver the freights to the final destinations. It can make a door-to-door deliver system possible for railroad transportation, which is the key factor for modal shift from road to railroad. For implementing this, this study proposes three important things: the cost-efficient reforming way of railroad yard that has been used for the past 114 years, the diagram plan of train services, and some technical reviews like clearance limits. This is the first study with practical proposals and solutions on this topic in Korea. The suggestions of this study cut down distribution costs by more than seven trillion won.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.4
/
pp.83-97
/
2012
In this paper, we consider a single-manufacturer single-buyer supply chain problem where a single manufacturer purchases and processes raw materials into a family of items in order to deliver a family of items to a single buyer at a fixed interval of time for effective implementation of Just-In-Time Purchasing. An integrated multi-item lot-splitting model of facilitating multiple shipments in small lots between buyer and manufacturer is developed in a JIT Purchasing environment. Previous research on the integrated model assumed that the manufacturer orders raw materials m (integer) times for every production run (lot multiplier policy for the raw material). In this paper, we consider a generalized policy in the replenishment of raw materials, allowing lot multiplier policy and lot splitting policy. An iterative solution procedure is developed to find the order interval for finished goods and raw materials, and number of shipments between buyer and manufacturer. We show by numerical example that when the integrated policy is adopted by both buyer and manufacturer in a cooperative manner, both parties can benefit.
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.1
/
pp.486-492
/
2011
In this paper we analyzed performance of Andriod's Davik virtual machine(VM) using standard benchmark and compared the result with the embedded Java virtual machine. We used a well known benchmark suit named SPECJVM for the measurement. For the fair comparison, Sun Java embedded JVM is ported and the same benchmark is ported on it. The Odriod smartphone hardware platform is used as the target hardware. We have added a Just-In-Time compiler to Dalvik, which is not supported in the recent Android release, and measured performance improvement. The experiment result show that Dalvik achieved 15% and Dalvik with JIT shows 63% of the Sun's JVM performance.
Companies are pursuing the management of small quantity batch production or JIT(Just-in-time) system for improving the delivery response and LOB(Line Balancing) in order to satisfy consumers' increasing demands in the current global economic recession. And in order to improve the growth of production for reducing manufacturing cost, improvements of the Load Balancing have become an important reformation factor. Thus this paper is aimed at warehouse which procures materials on the assembly line in procurement logistics of automotive logistics and proceed with research on heuristic algorithm development which can increase the Load Balancing of workers. As a result of this study, when applied the primary target value, it was verified that the whole workers decreased from 28 to 24. Furthermore, when specified the secondary target value and applied algorithm once more, it was verified that the Load Balance Ratio was improved from 44.96% to 91.7%.
Journal of Korean Society of Industrial and Systems Engineering
/
v.38
no.3
/
pp.78-86
/
2015
Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.
Journal of the Korean Regional Science Association
/
v.8
no.1
/
pp.119-130
/
1992
Many of the industrialized countries since the 1970s have been experiencing the change in the industrial structure due to technological development, that is, from Fordism to post-Fordism, or to "flexible production system". Regional development has been undergoing some changes according to the different industrial production systems. During the Fordist mass production period, the manufacturing belt was the core region of the production system. As the system shifts to flexible production system of which characteristics are veritcal disintegration, emphasis for JIT(just-in-time) delivery system, part-time and short-time labor contracts, design-intensive industries, etc, the new system requires the new production core and has produced the new industrial spaces, such as Sunbelt cities, suburbs, small-or medium-sized cities, and non-metropolitan areas. In the perspective of global system, the Fordist production system made th NICs developed, because the mass production required many unskilled and low-wage workers. As the NICs exports of manufactured goods have incredibly expanded during the 1970s, the industrialized countries have become threatened. The industriablized countries have restructured their economies and international policies. Such restructures resulted in the economic depression of the NICs. The investment pattern of the industrialized countries has changed and particularly those industries adopting the Post-Fordism have invested from the NICs to the peripheral areas of their own countries or toward the underdeveloped countries which have much lower wage workers. The investment pattern of the NICs is also undergoing some changes like from metropolitian areas to small or non-metropolitan regions. The regional development since the post-Fordist production is still going on, thus it is not possible to generalize the tendency. That could be a particular phenomenon or a stage in the long-term cycle. But the regional development in the world system since 1980s definitely shows the different pattern.t pattern.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.