• Title/Summary/Keyword: JIT(Just-In-Time)

Search Result 98, Processing Time 0.027 seconds

Production Planning and Kanban Operations in JIT Systems for Small Manufacturers (중소기업을 위한 JIT 생산방식 : 생산계획(生産計劃)의 수립과 칸반의 운용(運用))

  • Chung, Nam-Kee;Yoo, Chul-Soo
    • IE interfaces
    • /
    • v.5 no.2
    • /
    • pp.29-37
    • /
    • 1992
  • An approach to Just-In-Time for small job-shop-type manufacturers is presented. This is aimed at those who understand the pull production system, however, cannot afford either swift changeover in workcenters or frequent delivery to customers. First, as a production planning technique, a lot-sizing model entitled Multilevel Least Total Cost Model(MLTCM) is developed; The production order quantities of each components be those requiremensts of the end item production lot. The contribution of MLTCM is shown via simulation. Then, a framework of the Kanban operations is designed; A Production Control Kanban is introduced as a communication tool with Production Kanban in a job-shop.

  • PDF

A Study on the Human Resource Management of the Specialty Contractors Performing Multi Projects -Focused on Rebar and Concrete Work- (멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근.콘크리트공사 중심으로 -)

  • Seo, Jong-Min;Na, Young-Ju;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.67-73
    • /
    • 2008
  • Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

A Study on the Prevention System of Mixed Assembly Under the Part of Supply Chain Management using Uncommon BOM (SCM에서의 효율적인 혼입방지시스템에 대한 연구)

  • 강민식;김재련
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.69
    • /
    • pp.13-22
    • /
    • 2001
  • The efficient quality assurance system to prevent mixed assembly in introduced in this paper, It supports JIT(Just-In-Time) based Kanban and demand pull system. A new system is designed for the synchronized production and quality assurance using barcode and production kanban card, And the performance improvement method for the stable and fast response of the proposed system is suggested in this paper also. As the result of the proposed system, we improved production status visibility and quality traceability.

  • PDF

Automobile Assembly Sequence System Using Production Information (생산정보를 이용한 자동차 조립 서열시스템에 관한 연구)

  • Ock, Young-Seok;Kim, Byung Soo;Bae, Jun-Hee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.3
    • /
    • pp.8-15
    • /
    • 2014
  • For zero inventory and mixed assembly production, JIT (Just In Time) production system in Toyota and JIS (Just-In-Sequence) production system in Hyundai motor co. have been proposed in automobile production areas. Even though the production systems are popular in the areas, many subcontract companies producing part-modules for final production at a parent company suffers from excessive or shortage amount of inventory due to the time gap of production and delivery to the parent company. In this study, we propose an efficient real-time assembly sequence system applying a well-known Pareto method using Paint-In information in painting process and daily production planning information. Based on this system, a production line can estimate the shortage amount of UPH (Units Per Hour) at production line and recovers the amount before operating assembly production in the line. The proposed system provides efficiency on productivity compared with the previous system.

Structured Analysis of SNS for Development of Production Inventory System Fitted to Minor Enterprise (중소기업에 적합한 생산재고관리 시스템 개발을 위한 SNS 의 구조적 분석)

  • Jeon, Tae-Joon
    • IE interfaces
    • /
    • v.6 no.1
    • /
    • pp.47-54
    • /
    • 1993
  • Sequential Numbering System(SNS) is one of the production and inventory management system, which is more effective and practical to minor enterprises than Material Requirement Planning (MRP) system or Just-in-Time(JIT) system. The purpose of the paper is the structured analysis of SNS as the first phase of software development. Data Flow Diagram(DFD), Data Dictionary(DD), and Mini-Specs are used to analyze the system through the second level. The result can be exploited to SNS software design and programming.

  • PDF

Improving application startup time by automatic profiling (Automatic Usage Profiling을 통한 초기 앱 실행 속도 개선 방법)

  • Chae, Hyangseok;Baik, Jongmoon
    • Journal of Software Engineering Society
    • /
    • v.28 no.1
    • /
    • pp.1-6
    • /
    • 2019
  • Google released an initial version of Android that runs Dex(Dalvik Executable) through the Dalvik Runtime. Since Dalvik Runtime is based on interpreter, JIT(Just-in-time) compilation has been applied to improve performance. After Lollipop(Android 5.0) Dalvik Runtime has replaced with ART Runtime which support AOT (Ahead-of-time) compilation of Dex into Native Code. The late st Android has a problem that the application execution speed is slow until the AOT compilation is completed according to the actual usage record after the installation of the app. To improve the problem we have investigate the characteristics of profile that can improve the execution speed of the application and generate the profile automatically. Finally we propose a method that can optimize the application at install time. With the proposed method we can optimize selectively at install time and can help improving the execution speed of the app from the initial execution.

A Successful Example of the PMIS to Dongnam Distribution Complex Project using TPMS(Total Project Management System) of the GS E&C (GS건설 TPMS를 통한 동남권유통단지 이주전문상가 현장 PMIS 성공사례)

  • Lee, Heung-Won;Park, Chan-Jeong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.129-134
    • /
    • 2007
  • In 1996, GS E&C became the first in the industry to adopt a Project Management System using EVM(Earned Value Management) to link schedule with profit/loss. In 2006, the TPMS(Total Project Management System) was completed by adding the concept of Lean Construction and JIT(Just In Time) to the Project Management System. This was done with the purpose of reducing waste and creating optimal work processes. This has been implemented on all sites and has enabled drastic increase of productivity. The portal provides customized information to the client, inspector and subcontractor personnel. Since various parties are receiving information that suits their requirements and is easy to use, usage has increased and since they are on the same platform, quick decisions and information sharing is possible. The purpose of the PMIS's success model in construction projects, this paper tests and proves the TPMS's efficiency and productivity to Dongnam Distribution Complex project.

  • PDF

The Study on Applying Incentive System for Just in Time Delivery (JIT 자재 조달을 위한 인센티브제도 적용에 관한 연구)

  • 정종식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.52
    • /
    • pp.21-31
    • /
    • 1999
  • This paper considers how to structure the incentive system between a buy and a single supplier of raw materials when early shipments are forbidden. And this paper is used to take the supplier's behavior into account in the buyer's choice of incentives. Combinations of two types of incentives that the buyer might offer are considered : (1) a fixed value incentive and (2) an incentive that decreases in value as time elapses. Given a desired probability of on time delivery, optimal incentives are found by specifying indifference curves for on time delivery and assessing the expected total cost of incentive schemes along that curve. Difficulties of using incentive to achieve 100% on time delivery are considered and two example flow time distributions are presented.

  • PDF

Implementation of Low-power Energy Checker Supporting Intermittent Computing Environment (간헐적 컴퓨팅 환경을 지원하는 저전력 에너지 체커 구현)

  • Kwak, Junho;Cho, Jeonghun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2021.05a
    • /
    • pp.86-89
    • /
    • 2021
  • 최근 에너지 하베스팅 기술이 발전하여 배터리 교체가 어려운 환경에서 동작하는 엣지 장치들에 많이 적용되고 있다. 하지만 해당 기술이 적용된 에너지 하베스팅 장치는 간헐적으로 동작하는 문제를 가진다. 이를 해결하기 위해 에너지 체커로 실시간 에너지 상태를 파악하고 에너지 상태에 따라 프로그램을 제어하는 JIT (Just-In-Time) 기반 모델이 많이 연구되고 있다. JIT 기반 모델에서 에너지 체커는 필수적이지만 상당한 에너지 오버헤드를 가지고 있다. 그렇기 때문에 본 논문에서는 에너지 체커의 에너지 오버헤드를 최소화하기 위해 저전력 에너지 체커 구현에 대한 실험을 진행했다. 내부 ADC (Analog-to-Digital Converter) 기반 에너지 체커, 내부 비교기 기반 에너지 체커, 그리고 외부 비교기 기반 에너지 체커 등 다양한 에너지 체커를 구현했고 각 에너지 체커에 대한 에너지 오버헤드를 측정 및 비교했다. 그 결과, 저전력 외부 비교기를 사용한 외부 비교기 기반 에너지 체커가 가장 작은 에너지 오버헤드를 가지는 것을 확인했다. 또한, ADC 의 측정 주기를 최적화하여 ADC 기반 에너지 체커의 에너지 오버헤드를 더욱 줄일 수 있는 가능성도 확인했다.

PDA System for Maximizing the Efficiency of Smart Pallet Based Rarts Delivery System (스마트 파렛트 기반 부품공급시스템의 운영 효율성 증대를 위한 PDA 시스템)

  • Lee, Young-Du;Koo, In-Soo
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.10 no.4
    • /
    • pp.115-120
    • /
    • 2010
  • Products companies, which manufactures finished goods with modular parts, will expect that the proper parts should be delivered to assembly line not only just in time (JIT) but also just in sequence (JIS) and also expect that faulty goods will not be produced due to the delivery of wrong parts. In order to satisfy the above requirements, recently Smart Pallet based Parts Delivery system (SPPD) was proposed. SPPD system can overcome the drawback of bar code based part delivery system in which much time for checking proper and in sequence parts is wasted due to labors' working in hand as well as the drawback of RFID based part delivery system in which recognition distance of RFID is very limited. In the paper, a PDA system is proposed and further implemented to maximize the efficiency of SPPD's operation as well as to manage the limited power of smart pallets efficiently.