The Rationalization through Comparative Analysis of Price Fluctuation Adjustment Method (물가변동 조정방법의 비교분석을 통한 합리화 방안)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.67-76
    • /
    • 2012
  • There are index adjustment method and item adjustment method in estimation methods for price fluctuation rate of public constructions. A relevant regulation has put item adjustment method as a principle, but in most construction, contract sum adjustment has been made by index adjustment method. Hence, this study, by figuring out width and causes of the gap between index adjustment method and item adjustment method through direct comparative analysis, solved inequality caused by difference between them and suggested a rational way against irrationality of each method. For building operations of public housing construction, a detailed fluctuation rate by index adjustment method and item adjustment method of construction cost elements of the same construction, that is, direct material cost, direct labor cost and historical construction cost was estimated to analyze difference between two adjustments and establish its cause. Across the analysis, it was found that fluctuation rate by item adjustment method was estimated lower than that by index adjustment method and difference between methods for estimating fluctuation rate of quotation unit price and application of index unrelated to construction type and construction nature are main causes of the difference. This study has a significance in that, for smooth contract sum adjustment between contracting parties, it practically proved the real difference between adjustment methods by conducting comparative analysis of the difference in direct correspondence way.

The Development of the Composite Index as a method of rate adjustment (의료보험수가 조정을 위한 복합지표 개발에 관한 연구)

  • 김한중;조우현;이해종
    • Health Policy and Management
    • /
    • v.3 no.1
    • /
    • pp.84-101
    • /
    • 1993
  • The current method of rate adjustment is based on the evaluation of the financial performance of hospitals. The method has the disadvantages such as too complicated, expensive process as well as low reliability due to small sample size. This study, therefore, develops a new model for the rate adjustment with the use of the composite index. In addition to that, it examines the validity of the model by comparing the result of the new method with that of the conventional method. The idea of the new model comes from the Medicare Economic Index(MEI) on which physician fees for the Medicare patients are adjusted periodically in the United States. Medical costs are classified into three groups : labor costs, materials and other expenses. Labor costs are subdivided into physicians and other personnels. Materials are subdivided into drugs and others. Other expenses are subdivided into 5 items. Macro economic indices are selected for each cost item in order to reflect the cost inflation during the specific period. Then the composite index which integrate all items according to the ration of each item in the total costs is calculated. The result from the application of empirical data to the new model is very similar to that of the current method. Furthermore, this method is very simple and also to easy to get social concensus. This model can be replaced the current method based on the analysis of the financial performance for the adjustment of medical fees.

  • PDF

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

School aged Children's Adjustment to Hospital Life (학령기 아동의 입원생활 적응)

  • Oh Jina
    • Child Health Nursing Research
    • /
    • v.9 no.4
    • /
    • pp.399-407
    • /
    • 2003
  • Purpose: The study was done to identify adjustment to hospital life of school aged children. This research was designed as a descriptive study. Method: A convenience sample of 186 patients who were hospitalized children, 6~12 years old. The instrument in this study were developed by researcher and constructed to include 5 sub categories about adjustment to hospital life. They ask children to rate each item on 5 Likert scale. The data were analyzed by SPSS Win Program. Result: The mean average score of adjustment to hospital life was 91.75(SD 11.22); the social support revealed the highest value, followed by self-esteem, stress on disease, stress on hospitalization, and defense strategies. There was differences on bibliographic data; hospital date, disease type. The relationship between adjustment and sub categories was significant, especially in the stress on hospitalization and disease, social support and self-esteem. The relationship between coping strategies and stress on diseases was reversed. Conclusion: These results suggest that pediatric nurses need to be aware of the adjustment to hospital life. A development of nursing intervention program may be useful and critical for hospitalized school aged children.

  • PDF

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

Improvement contract sum adjustment method caused by price fluctuation (물가변동에 의한 계약금액 조정방안 개선 기초연구)

  • Cho Hun-Hee;Seo Jang-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.83-86
    • /
    • 2004
  • Index adjusted ration method has been widely utilized in public construction secter for contract sum adjustment by price fluctuation. In this method. the Production Price Index are used for calculating the base ratio. but the PPI can't reflect the property of construction project in respect of the selected item and weight structure. In this research we prove the problem of using the index adjusted ration method in contract sum adjustment by price fluctuation. and improve it by using the construction cost index. which has the property of construction project. And the result. we figure out the difference between the PPI and CCI by $6.7\%$ in maximum value.

  • PDF

A study on the difficulty adjustment of programming language multiple-choice problems using machine learning (머신러닝을 활용한 프로그래밍언어 객관식 문제의 난이도 조정에 대한 연구)

  • Kim, EunJung
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.27 no.2
    • /
    • pp.11-24
    • /
    • 2022
  • For the questions asked for LMS-based online evaluation the professor directly set exam questions, or use the automatic question-taking method according to the level of difficulty using the question bank divided by category. Among them, it is important to manage the difficulty of questions in an objective and efficient way, above all, in the automatic question-taking method according to difficulty. Because the questions presented to the evaluators may be different. In this paper, we propose an difficulty re-adjustment algorithm that considers not only the correct rate of a problem but also the time taken to solve the problem. For this, a logistic regression classification algorithm was used of machine learning, and a reference threshold was set based on the predicted probability value of the learning model and used to readjust the difficulty of each item. As a result, it was confirmed that there were many changes in the difficulty of each item that depended only on the existing correct rate. Also, as a result of performing group evaluation using the adjustment difficulty problem, it was confirmed that the average score improved in most groups compared to the difficulty problem based on the percentage of correct answers.

Intelligent Control Algorithm for the Adjustment Process During Electronics Production (전자제품생산의 조정고정을 위한 지능형 제어알고리즘)

  • 장석호;구영모;고택범;우광방
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.4
    • /
    • pp.448-457
    • /
    • 1998
  • A neural network based control algorithm with fuzzy compensation is proposed for the automated adjustment in the production of electronic end-products. The process of adjustment is to tune the variable devices in order to examine the specified performances of the products ready prior to packing. Camcorder is considered as a target product. The required test and adjustment system is developed. The adjustment system consists of a NNC(neural network controller), a sub-NNC, and an auxiliary algorithm utilizing the fuzzy logic. The neural network is trained by means of errors between the outputs of the real system and the network, as well as on the errors between the changing rate of the outputs. Control algorithm is derived to speed up the learning dynamics and to avoid the local minima at higher energy level, and is able to converge to the global minimum at lower energy level. Many unexpected problems in the application of the real system are resolved by the auxiliary algorithms. As the adjustments of multiple items are related to each other, but the significant effect of performance by any specific item is not observed. The experimental result shows that the proposed method performs very effectively and are advantageous in simple architecture, extracting easily the training data without expertise, adapting to the unstable system that the input-output properties of each products are slightly different, with a wide application to other similar adjustment processes.

  • PDF

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

A Study on the Effects of Search Language on Web Searching Behavior: Focused on the Differences of Web Searching Pattern (검색 언어가 웹 정보검색행위에 미치는 영향에 관한 연구 - 웹 정보검색행위의 양상 차이를 중심으로 -)

  • Byun, Jeayeon
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.52 no.3
    • /
    • pp.289-334
    • /
    • 2018
  • Even though information in many languages other than English is quickly increasing, English is still playing the role of the lingua franca and being accounted for the largest proportion on the web. Therefore, it is necessary to investigate the key features and differences between "information searching behavior using mother tongue as a search language" and "information searching behavior using English as a search language" of users who are non-mother tongue speakers of English to acquire more diverse and abundant information. This study conducted the experiment on the web searching which is applied in concurrent think-aloud method to examine the information searching behavior and the cognitive process in Korean search and English search through the twenty-four undergraduate students at a private university in South Korea. Based on the qualitative data, this study applied the frequency analysis to web search pattern under search language. As a result, it is active, aggressive and independent information searching behavior in Korean search, while information searching behavior in English search is passive, submissive and dependent. In Korean search, the main features are the query formulation by extract and combine the terms from various sources such as users, tasks and system, the search range adjustment in diverse level, the smooth filtering of the item selection in search engine results pages, the exploration and comparison of many items and the browsing of the overall contents of web pages. Whereas, in English search, the main features are the query formulation by the terms principally extracted from task, the search range adjustment in limitative level, the item selection by rely on the relevance between the items such as categories or links, the repetitive exploring on same item, the browsing of partial contents of web pages and the frequent use of language support tools like dictionaries or translators.