Performance assessment of pitch-type wave energy converter in irregular wave conditions on the basis of numerical investigation

  • Poguluri, Sunny Kumar;Kim, Dongeun;Bae, Yoon Hyeok
    • Ocean Systems Engineering
    • /
    • v.12 no.1
    • /
    • pp.23-38
    • /
    • 2022
  • In this paper, a pitch-type wave energy converter (WEC-rotor) is investigated in irregular wave conditions for the real sea testing at the west coast of Jeju Island, South Korea. The present research builds on and extends our previous work on regular waves to irregular waves. The hydrodynamic characteristics of the WEC-rotor are assessed by establishing a quasi-two-dimensional numerical wave tank using computational fluid dynamics by solving the Reynolds-averaged Navier-Stokes equation. The numerical solution is validated with physical experiments, and the comparison shows good agreement. Furthermore, the hydrodynamic performance of the WEC-rotor is explored by investigating the effect of the power take-off (PTO) loading torque by one-way and two-way systems, the wave height, the wave period, operational and high sea wave conditions. Irrespective of the sea wave conditions, the absorbed power is quadratic in nature with the one-way and two-way PTO loading systems. The power absorption increases with the wave height, and the increment is rapid and mild in the two-way and one-way PTO loading torques, respectively. The pitch response amplitude operator increases as the wave period increases until the maximum value and then decreases. For a fixed PTO loading, the power and efficiency are higher in the two-way PTO loading system than in the one-way PTO loading system at different wave periods.

Short-term Load Forecasting of Using Data refine for Temperature Characteristics at Jeju Island (온도특성에 대한 데이터 정제를 이용한 제주도의 단기 전력수요예측)

  • Kim, Ki-Su;Ryu, Gu-Hyun;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.9
    • /
    • pp.1695-1699
    • /
    • 2009
  • This paper analyzed the characteristics of the demand of electric power in Jeju by year, day. For this analysis, this research used the correlation between the changes in the temperature and the demand of electric power in summer, and cleaned the data of the characteristics of the temperatures, using the coefficient of correlation as the standard. And it proposed the algorithm of forecasting the short-term electric power demand in Jeju, Therefore, in the case of summer, the data by each cleaned temperature section were used. Based on the data, this paper forecasted the short-term electric power demand in the exponential smoothing method. Through the forecast of the electric power demand, this paper verified the excellence of the proposed technique by comparing with the monthly report of Jeju power system operation result made by Korea Power Exchange-Jeju.

Daily Operating Characteristics of Desalination System with Solar Energy (태양에너지 해수담수화 시스템 일일 운전 특성)

  • Kwak, Hee-Youl;Joo, Hong-Jin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.262-265
    • /
    • 2009
  • This study was carried out to evaluate the clear day operating performances for the decentralized desalination system with the solar thermal system and the photovoltaic power system. In a clear day, we used a solar thermal system as heat source of the single-stage fresh water generator with plate-type heat exchangers and a photovoltaic power system as electric source for hydraulic pumps. The demonstration system generation was designed and installed at Jeju-island in 2006. The system was comprised of the desalination unit with daily fresh water capacity designed as $2m^3$, a $120m^3$ evacuated tubular solar collector to supply the heat, a $6m^3$ heat storage tank, and a 5.2kW photovoltaic power generation to supply the electricity of hydraulic pumps for the heat medium fluids. In a clear day, solar irradiance daily averaged was measured $518W/m^3$, the daily fresh water yield showed that about 565 liter.

  • PDF

Comparision for Islanding Method of Grid-connected PV System (태양광발전 시스템의 단독운전법 비교)

  • Eun Seog-Jun;Choi Jong-Woo;Kim Heung-Geun
    • Proceedings of the KIPE Conference
    • /
    • 2004.07a
    • /
    • pp.92-96
    • /
    • 2004
  • Islanding of PV systems can cause a variety of problems and must be prevented. However, if the real and active powers of RLC load and PV system are closely matched, islanding detection by passive methods becomes difficult. Active methods enables islanding detection by forcing the frequency of the voltage in the island to drift up/down. This paper shows the simulation and comparision by Matlab for the active methods.

  • PDF

Transmission Network Expansion Planning Using Reliability and Economic Assessment

  • Kim, Wook-Won;Son, Hyun-Il;Kim, Jin-O
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.895-904
    • /
    • 2015
  • This paper presents a probabilistic approach of reliability evaluation and economic assessment for solving transmission network expansion planning problems. Three methods are proposed for TNEP, which are reorganizing the existing power system focused on the buses of interest, selecting candidates using modified system operating state method with healthy, marginal and at-risk states, and finally choosing the optimal alternative using cost-optimization method. TNEP candidates can be selected based on the state reliability such as sufficient and insufficient indices, as proposed in this paper. The process of economic assessment involves the costs of construction, maintenance and operation, congestion, and outage. The case studies are carried out with modified IEEE-24 bus system and Jeju island power system expansion plan in Korea, to verify the proposed methodology.

Z-Domain Frequency Dependent AC System Equivalent for Electromagnetic Transient Studies (전자기 과도현상 해석을 위한 Z 영역에서의 주파수 의존 교류시스템 등가)

  • Wang, Yong-Pil;Jeong, Hyeong-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.296-301
    • /
    • 2002
  • Modern power systems are very complex and to model them completely is impractical for electromagnetic transient studies. Therefore areas outside the immediate area of interest must be represented by some form of Frequency Dependent Network Equivalent (FDNE). In this paper a method for developing Frequency Dependent AC system Equivalent (FDACSE) using Z-domain rational Function Fitting is presented and demonstrated. The FDACSE is generated by Linearized Least Squares Fitting(LSF) of the frequency response of a Z-domain formulation. This 1 & 2 port FDACSE have been applied to the New Zealand South Island AC power system. The electromagnetic transient package PSCAD/EMTDC is used to assess the transient response of the 1 & 2 port FDACSE developed under different condition (linear load, fault and nonlinear loading). The study results have indicated the robustness and accuracy of 1 & 2 port FDACSE for electromagnetic transient studies.

Performance Monitoring and Load Analysis of Wind Turbine (풍력발전기의 성능 모니터링 및 하중분석)

  • Bae, Jae-Sung;Kim, Sung-One;Youn, Joung-Eun;Kyung, Nam-Ho
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.385-389
    • /
    • 2004
  • Test facilities for the wind turbine performance monitoring and mechanical load measurements are installed in Vestas 100 kW wind turbine in Wollyong test site, Jeju island. The monitoring system consists of Garrad-Hassan T-MON system, telemetry system for blade load measurement, various sensors such as anemometer, wind vane, strain gauge, power meter, and etc. The experimental procedure for the measurement of wind turbine loads, such as edgewise(lead-lag) bending moment, flapwise bending moment, and tower base bending moment, has been established. Strain gauges are on-site calibrated against load cell prior to monitoring the wind turbine loads. Using the established monitoring system, the wind turbine is remotely monitored. From the measured load data, the load analysis has been performed to obtain the load power spectral density and the fatigue load spectra of the wind turbine.

  • PDF

A Network Reconfiguration Method for BESS based Service Restoration in Distribution Systems (연계선로가 없는 배전선로에서 BESS기반 정전복구를 위한 토폴로지 재구성 방안)

  • Lim, Seongil
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.10
    • /
    • pp.1460-1465
    • /
    • 2017
  • Outage areas can be transferred to adjacent feeders to restore power supply in case of the fault on the distribution system. Feeders in the small island or mountain area may not have backup feeders due to the low density of load. In this weakly meshed open loop system, BESS can be used as a backup feeder to improve reliability of power supply. This paper proposes a new network reconfiguration method for BESS based service restoration. Fuzzy decision making technique is adopted to deal with fuzziness of service restoration planning rules. Case studies using KEPCO real distribution system have been performed to verify feasibility of the proposed method.

A Study on the Transmission Overload Relief by Fast Switching (고속 스위칭에 의한 송전선로 과부하 해소 연구)

  • Cho, Yoon-Sung;Lee, Han-Sang;Jang, Gilsoo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.8
    • /
    • pp.1053-1058
    • /
    • 2013
  • Because of computational burden and complex topology of substation, a transmission overload relief using circuit-breaker switching was very complex and difficult. However, a on-line algorithm for reducing the overloads in transmission lines has made progress due to the advance of IT technology. This paper describes the methodology for alleviating the overloads in transmission lines by circuit-breaker switching. First, the severe contingency lists and substations were selected from the results of contingency analysis. Then the switch combinations are determined using circuit-breakers of the selected substation. The topology changes are limited to equipment outage, bus split, island split, bus merge and island merge. Finally, the fast screening and full analysis methods are used to analyze the overload in transmission lines. To verify the performance of the proposed methodology, we performed a comprehensive test for both test system and large-scale power systems. The results of these tests showed that the proposed methodology can accurately alleviate the overloads in transmission lines from online data and can be applied to on-line applications.

Design and Dynamic Performance Analysis of a Stand-alone Microgrid - A Case Study of Gasa Island, South Korea

  • Husein, Munir;Hau, Vu Ba;Chung, Il-Yop;Chae, Woo-Kyu;Lee, Hak-Ju
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.5
    • /
    • pp.1777-1788
    • /
    • 2017
  • This paper presents the design and dynamic analysis of a stand-alone microgrid with high penetration of renewable energy. The optimal sizing of various components in the microgrid is obtained considering two objectives: minimization of levelized cost of energy (LCOE) and maximization of renewable energy penetration. Integrating high renewable energy in stand-alone microgrid requires special considerations to assure stable dynamic performance, we therefore develop voltage and frequency control method by coordinating Battery Energy Storage System (BESS) and diesel generators. This approach was applied to the design and development of Gasa Island microgrid in South Korea. The microgrid consists of photovoltaic panels, wind turbines, lithium-ion batteries and diesel generators. The dynamic performance of the microgrid during different load and weather variations is verified by simulation studies. Results from the real microgrid were then presented and discussed. Our approach to the design and control of microgrid will offer some lessons in future microgrid design.