• Title/Summary/Keyword: Investment payback period

Search Result 51, Processing Time 0.032 seconds

A study of real estate investment value and analytic technique -mainly by case study of real estate development projects- (부동산 투자가치와 사업타당성 분석기법 연구 -개발사업 사업타당성 분석 사례연구를 중심으로-)

  • Lee, Taek-Soo;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.12
    • /
    • pp.6128-6134
    • /
    • 2012
  • In so many real estate development projects, there were strong needs to have a powerful tool to check feasibility of those projects. But there were not enough tool and measure to cover risk of real estate development and construction. Therefore I tried to find a real tool to measure investment value of development properly and efficiently, by means of case studies of many real estate development projects. Finally I found a fact that no tools of investment value analysis are perfect and efficient to hedge all kinds of risks in projects. Especially NPV(Net Present Value) and IRR(Internal Rate of Return) were not sufficient by themselves to measure investment value. So I found out that MIRR(Modified IRR), XIRR(X-IRR), ARR(Average Rate of Return), PP(Payback Period) and so on, would be supplementaries of proper and efficient investment value analysis.

An Establishment of Greenhouse Gas Information System using Excel Spreadsheets (엑셀 스프레드시트를 활용한 온실가스 정보시스템 구축)

  • Lee, Hae-Jung;Chung, Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.4
    • /
    • pp.129-136
    • /
    • 2017
  • Climate change is the biggest environmental issue of our times. A variety of activities to reduce greenhouse gas emissions have been in progress to observe the Kyoto Protocol. Especially, the Energy Target Scheme is created to reduce greenhouse emission with the supervision of Korean government. This includes Green-house Gas Information Systems to promote activities in the private sector to reduce green-house gas emissions, to cut a cost of energy use, and to reduce GHG emissions. Also, the system has calculated the amount of greenhouse gases. Without any additional investment, 2.75% savings are increased over the previous year. In service sector, a cooperation of customers and employees is necessary. A reduction of GHG emissions requires a proper service organization, considering an amount of investment and payback period. Without any additional investment or replacement, employees can save energy easily turning off ventilation systems an hour before employees' departure, installing timers to turn off water purifiers and vending machines after some period of no use. The Green-house Gas Information System is similar to that of Environmental Management System. However, the Excel is the best program to calculate an amount of green-house gas emissions, and to assess for a reduced amount of GHG emissions. A goal of this research is to propose a practical method in the private sector to calculate an amount of green-house gases. The Green-house gas Information System based on Excel spreadsheet gives standards for good evaluation. The greenhouse gas information system establishes and executes the policies and objectives related to greenhouse gas emissions Similar to ISO 14001 environment management system structures, the advantages of using simplified Excel Sheet for calculating GHG emissions and reducing GHG emissions are easy to access.

Environmental awareness and economical profits of replacing gas turbines in gas compressor stations: A case study of Polkalleh station in Iran

  • Sadrnejad, Amin;Noorollahi, Younes;Sadrnejad, Tohid
    • Environmental Engineering Research
    • /
    • v.21 no.2
    • /
    • pp.132-139
    • /
    • 2016
  • In early 90s the worldwide awareness about the energy crisis and global warming had been increased and emission reduction (by improving energy efficiency), as well as increasing the capacity of clean and renewable energies, showed themselves as the most important steps towards the sustainable development approach. However, investigations on Iran's environmental situation show huge decline in recent decades and apparently there is no sense of urgency about these issues through the vision of Iranian politicians. In this article the idea of replacing the old gas turbines of Polkalleh natural gas compressor station - as one of the main compressor stations of Iran - with newer and more efficient gas turbines is evaluated, emphatically for reducing greenhouse gases emissions and their environmental costs and decreasing natural gas consumption as well. Clearly such idea is costly, but analyzing its economic impacts, huge declines in annual costs and greenhouse gases emissions can be seen as well. So an investment about $95 million can decrease 40% of Polkalleh compressor station annual costs, 25% of natural consumption and 30% of $CO_2$ and $NO_x$ emissions. Besides the simple payback period of this investment is about 2.5 years from the cut-expenses of annual costs.

Economic Evaluation of Early Detection System for Warranty Issues (품질보증 이슈 조기감지 시스템의 경제성 평가)

  • Jung, Sung-Hwan
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.1
    • /
    • pp.39-48
    • /
    • 2012
  • An early detection system for warranty issues periodically collects customers' claim data and automatically reports alarms about emerging issues based on statistical algorithms. It helps companies to reduce an issue definition time and save the handling cost of warranty claims. This paper provides an evaluation framework to validate the economic effect of an early detection system project. For this purpose, we present economical index of a project with explicit formulas such as ROI(return on investment), PP(payback period), NPV(net present value), PI(profitability index) and IRR(internal rate of return) and analyze the sensitivities of the index according to the variation of project input parameters. The proposed analysis framework is expected to be used for evaluating economic values of various system integration projects.

An Economic Feasibility Analysis of the HAPS Services in Korea

  • Ahn, Jae-Kyung;Kim, Jong-Hwa;Lee, Deok-Joo;Ahn, Do-Seob;Ku, Bon-Jun
    • Satellite Communications and Space Industry
    • /
    • v.13 no.1 s.28
    • /
    • pp.118-124
    • /
    • 2006
  • HAPS(High Altitude Platform Station) which is defined as a station located on an object at an altitude of 20 to 50 km and at a specified, nominal, fixed point relative to the earth is promising technology capable of providing broadband multimedia services. In this study, economical aspects of HAPS service are analyzed by estimating the revenue and costs incurred by the service. To evaluate the profitability of HAPS service, the number of subscribers is estimated and then the net present value (NPV), payback period, and the rate of return on investment (ROI) are calculated under various scenarios

  • PDF

Methodology of Feasibility Assessment for Small Hydropower Plant (소수력발전소의 건설 타당성분석 기법)

  • Park, W.S.;Lee, C.H.;Jeong, S.M.
    • Solar Energy
    • /
    • v.18 no.3
    • /
    • pp.153-160
    • /
    • 1998
  • The methodology and feasibility analysis model for small hydropower plant has been studied and developed. It consists of two main part, the performance prediction model to estimate the performance characteristics and economics anaysis model to evaluate economical characteristics for surveyed sites. The performance characteristics and feasibility assessment for surveyed sites were analyzed, using developed models. Also, primary design specifications such as design flowrate, capacity, load factor were estimated and discussed for surveyed sites in Dan-yang and feasibility was suggested through analyzing the investment, unit cost and payback period.

  • PDF

Economic Assessment of a Wind Farm Project Using Least Square Monte-Carlo (LSMC) Simulation (최소자승몬테카를로 시뮬레이션을 이용한 풍력발전설비 투자계획)

  • Kim, Jin-A;Lee, Jong-Uk;Lee, Jae-Hee;Joo, Sung-Kwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.32-35
    • /
    • 2011
  • The economic value of a wind farm project is influenced by various risk factors such as wind power output and electricity market price. In particular, there is uncertainty in the economic evaluation of a wind farm project due to uncertain wind power outputs, which are fluctuated by weather factors such as wind speed, and volatile electricity market prices. This paper presents a systematic method to assess the economic value and payback period of a wind farm project using Least Square Monte-Carlo (LSMC) simulation. Numerical example is presented to validate the effectiveness of the proposed economic assessment method for a wind farm project.

Energy and Cost Efficiency on applying Solar Control Facade System (일사조절 장치 적용에 따른 에너지 및 비용효과 분석)

  • Ahn, Ki-Uhn;Kim, Seong-Jin;Kim, Dong-Hee;Moon, HyunSeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.98-99
    • /
    • 2013
  • Recently, solar control facade systems are highlighted due to its low cost and outstanding applicability for green remodeling. However, it has not been long time since the systems were introduced. Therefore, the application study of the solar control system also has been insufficient. In this study, simulated models were developed and three types of solar control systems(i.e., overhang, blind, and screen)are installed in the models. The efficiency of energy savings and investment payback period according to the application of solar control facade system were analyzed.

  • PDF

A Study on the strategy to investment of Building Cogeneration System (건물용 열병합발전 설비의 효과적인 투자를 위한 현 제도의 개선방향 모색에 관한 연구)

  • Kim, Jung-Hoon;Ko, Min-Jea;Park, Jong-Seong
    • Proceedings of the KIEE Conference
    • /
    • 1994.11a
    • /
    • pp.18-20
    • /
    • 1994
  • The cogeneration system has a advantage of producing electrical and thermal energy simultaneously. therefore, this system is encouragable to the business proprietor and the nation like us which has the problem of limited energy. Presently, there is a few cogeneration system for new city and industrial complex. But the building cogeneration system is dull in application because of legal limitation and poor tax support. In this paper, we simulate economic propriety of the building system under the support which is applied to industrial system. And we simulate the effect of each support item on the economic propriety in aspect of payback period.

  • PDF

Fuel Conversion to Renewable Energy Analysis of the Impact on the Horticulture in the Agricultural Sector -Mainly Wood Pellets- (농업부문에서 신재생에너지로의 연료전환이 시설원예에 미치는 영향 분석 -목재펠릿을 중심으로-)

  • Yoon, Sung-Yee;Kim, Tae-Hoon
    • Korean Journal of Organic Agriculture
    • /
    • v.22 no.4
    • /
    • pp.531-547
    • /
    • 2014
  • This study analyzed the effect of Greenhouse of wood pellet fuel conversing from Diesel. Analyzed through a life cycle assessment of greenhouse gas emissions of carbon dioxide for the environmental assessment, In evaluation of the Ministry of the Environment, analyzed through the life cycle assessment of carbon dioxide emissions of the greenhouse gas and, In the case of economic evaluation, we analyzed the investment payback period to the total revenue generated by each of the calculated incentive based on the RHI and institutions reduction projects a reduction of costs associated with the reduction of fuel costs.