• 제목/요약/키워드: International Plan of Action

검색결과 104건 처리시간 0.025초

남동권 초고농도 미세먼지 발생 특성과 비상저감조치 - 수도권과 비교연구 (II) (Characteristics of Extremely High PM2.5 Episode and Emergency Reduction Measures Plan in Southeastern Region - Comparative Study in Busan vs. Seoul Metropolitan Area (II))

  • 최다니엘;허국영;김철희
    • 한국환경과학회지
    • /
    • 제30권10호
    • /
    • pp.789-802
    • /
    • 2021
  • This study analyzed the characteristics of high PM2.5 episodes that meets the concentration criteria of Emergency Reduction Measures Plan (ERMP) in Busan during the 2015-2020, and compared with those in Seoul. As a first step, the CAPSS-2017 emission data was employed to analyze the emission differences between Busan and Seoul, and pointed out that Busan emission included the dominance of ship emissions (37.7%) among total PM2.5 city emissions, whereas fugitive PM2.5 emission was the highest in Seoul. These emission characteristics are indicating that the controlling action plan should be uniquely applied to cope with ERMP in each region. We selected extremely high PM2.5 episode days that meet the criteria of ERMP levels. In Busan, Ulsan, and Gyeongnam region, 15, 16, and 8 days of extremely high PM2.5 cases were found, respectively, whereas Seoul showed approximately doubling of occurrences with 37 cases. However, the occurrences in summer season indicated big differences between two cities: the proportion of summer-season occurrence was 13-25% in Busan, whereas no single case have occurred in Seoul. This is suggesting the needs of comprehensive summer emission reduction plan with focusing on sulfur reduction to effectively cope with the ERMP levels in summer in the southeastern region, including Busan.

안전체험 시뮬레이터 개발에 관한 연구 (The study of Safety education, safe experience for students to develop research simulreyiteo)

  • 김태환
    • 한국재난정보학회 논문집
    • /
    • 제6권1호
    • /
    • pp.46-59
    • /
    • 2010
  • In this study, the safety training of comparative analysis of the realities of Korea's safety training and international experience and practical training for the safety experience of a virtual reality simulator, the development of safe conduct as a controlled motion simulator system, image H / W and the control system works, sound effects H / W and the control system works, 4D special effects (smoke, heat, wind, vibration) and a control system integration, mission control system for the selection and evaluation of the proposal, and safety training on Game S / W of development as we have never experienced an earthquake action plan and evacuate to escape the power of experience and the experience of an earthquake (vibration + video), Also the collapse and a fire escape on the experience of following second disaster, the building collapsed during an escape experience in the field, in case of fire According to the initial fire suppression and fire extinguisher usage experience - experience of smoke and heat to escape in, Moreover, the Daegu subway fire in public places such as subway and evacuated to escape the experience, considering the suggested Simulator.

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

Interpretive Structural Modeling in the Adoption of IoT Services

  • Kim, Yonghee;Park, Youngju;Song, Gwangsuk
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제13권3호
    • /
    • pp.1184-1198
    • /
    • 2019
  • This study aims to use ISM to identify the enablers affecting the acceptance of IoT services. For this purpose, this study conducted an ISM analysis and a MICMAC analysis, extracted the enablers from Internet of Things - An Action Plan for Europe published by the EU for the research, and conducted interviews and surveys. The study found that it would be preferentially necessary to prepare the base for successful IoT services through international cooperation and the security of objective data. In addition, it turned out that it would be necessary to make efforts to spread and develop IoT services by conducting R&D and implementing projects through public-private partnerships and the organization of a consultative group. Lastly, since information security and standardization are the desired objects of the IoT industry, it was found that both the government and the industrial world should focus on them. This study has significance in that it can provide practical implications for the effective acceptance of IoT services.

A CP-BASED OPTIMIZATION MODEL FOR CONSTRUCTION RESCHEDULING PROBLEMS

  • Shu-Shun Liu;Kuo-Chuan Shih
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.941-946
    • /
    • 2005
  • It is essential for project managers to make schedule adjustment based on their professional experience, in terms of rescheduling action discussed in this paper. This paper discusses the topics of resource-constrained construction rescheduling by modifying the concepts of manufacturing rescheduling. Moreover, the influence factors of construction rescheduling problems are investigated and identified in this paper. According to initial schedule plan and present progress, a new rescheduling mechanism based on Constraint Programming (CP) techniques is developed to reschedule projects with the objective of minimizing total project cost or duration, under three rescheduling policies. Through case study, the behavior of three different rescheduling policies is analyzed and discussed in this paper.

  • PDF

지역특성을 고려한 환경보전계획수립을 위한 시민환경의식 분석 (Analysis for Environmental Consciousness on Conservation Planning Considering the Regional Characteristic -The Case of Daegu City-)

  • 류지원;정응호
    • 한국환경과학회지
    • /
    • 제23권12호
    • /
    • pp.2071-2082
    • /
    • 2014
  • In this study, the environmental consciousness of Daegu citizen on conservation planning considering the regional characteristics was investigated. Data were collected throughout a survey and 1400 people were selected using a stratified sampling method based on populations of Daegu administration district. Results wee followings; First, the levels of environmental consciousness were different dependent on districts' characteristics. Second, poor awareness on Daegu Agenda 21 (Clear and Green Daegu 21) were shown. Daegu Agenda 21 is the action plan for the sustainable environmental conservation activities of the City of Daegu. Third, waste was the most serious environmental problems of Daegu, air quality was second worst, and third was river water quality from the survey, but differentiated awareness was shown dependent on regional spatial factors and pollution emission factors. Last, a public environmental education was the most important issue to make invigorations and progress for future environmental policy.

암등록과 암관리사업의 최신 국제 경향 및 우리나라 암발생 통계 (Global Activity of Cancer Registries and Cancer Control and Cancer Incidence Statistics in Korea)

  • 신해림
    • Journal of Preventive Medicine and Public Health
    • /
    • 제41권2호
    • /
    • pp.84-91
    • /
    • 2008
  • The World Health Organization (WHO) reported that cancer killed 7.6 million people in the world in 2005, and that 40% of all cancer deaths can be prevented. According to the WHO Global Action Plan Against Cancer (GAPAC), monitoring of cancer patients is the essential part of cancer control, and should be conducted through cancer registration. Originally, cancer registries were primarily concerned with the description of cancer patterns, trends of cancer occurrence, and etiology of cancer. In the last 20 years, cancer registries provided not only information on the incidence and characteristics of specific cancers, but also supplied the source of cancer control planning and evaluation and the care of individual cancer patients with survival. Cancer Incidence in Five Continents (CI5) presents incidence data from populations all over the world every five year. Volume IX in the series (data for 1998-2002) has recently (November 2007) been published online at International Agency for Research on Cancer (IARC). Nine data from Korea Central Cancer Registry (National data), Seoul, Busan, Daegu, Gwangju, Incheon, Daejeon, Usan, Jejudo regional cancer registries were included in that volume. In this paper, the editorial process, the characteristics of national data, and quality indices in CI5 IX are being described. In addition, cancer control activities related to cancer registration in some selected countries are also presented.

A Study on Quality Management and Assessment Model for System-Integration Organization

  • Lee, Byung Yong;Jung, Soo Il
    • 산업경영시스템학회지
    • /
    • 제24권68호
    • /
    • pp.85-94
    • /
    • 2001
  • Most of customers want to know how to develop the computer system they want to get to use according to the their requirements. This study presents a Computer Integration management System for Quality (CISQ) model for system-integration organizations, which need to demonstrate their capability to consistently provide computer integrated system that meets customer satisfaction and applicable regulatory requirements. The Plan.Do.Check.Act(PDCA) cycle called by Doming wheel expresses the basic concept of continuous improvement action in order to emphasize on achieving business goal. It is useful for providing full competence of a system-integration organization to integrate management systems based on the international management system, and to take an advantage in its market. This study specifies International Certification Network Business Excellence Concept(IBEC) approach to ensure a harmonized integration of the variety of management systems and thereby produce synergy effect. The end part of this study specifies a Assessment Model including an assessment concept adding to the compliance audit according to the CISQ for the continuous improvement. A simple application on Failure Modes and Effects Analysis(FMEA) in testing phase in project life cycle has been done.

  • PDF

스포츠 조정·중재제도의 활용방안 - K 선수 사례 중심으로- (The Plan for Application of a Sports Arbitration and Conciliation System -With Kim yeon-kyoung's Case as the Center -)

  • 김규범
    • 한국중재학회지:중재연구
    • /
    • 제26권2호
    • /
    • pp.67-89
    • /
    • 2016
  • An ADR arbitration system has a necessary value in the sports industry for settlement of disputes. Sports disputes should be resolved independently by enacting internal regulations within the basic principles of national law rather than treated as a civil action. If the dispute is not fair and transparent, it may cause distrust. Because an arbitration system has values such as speed, flexibility of economic decisions, professionalism of arbitrator and confidentiality of arbitration-related information, the efficiency of the arbitration system for conflict resolution has emerged recently. We have to assign sports experts to reactivate sports arbitration commission committees which existed from 2006 to 2009 in Korea. Many countries, such as the UK, USA, Canada, New Zealand, Hungary, the Netherlands, Poland, Germany, and Japan, which attain advancement of sports and the International Court of Arbitration establish and run their own sports arbitration agencies. However, Korea disbanded its sports arbitration commission committee for political and economic reasons. In 2012, after their disbanding, athlete Kim Yeon-kyoung came into conflict with Heungkuk Life over terms of free agent acquisition and international transfer certification. Finally they were able to settle those political conflicts. However if there had been related laws in Korea, they could have resolved those problems easily without international disputes. Practically, it would have been almost impossible for Kim Yeon-kyoung to win the dispute. But her problem became an issue after the London Olympics, so she could win. Although it is well for her to take an active role on the international stage, it left much to be desired on account of the intervention of political circles in order to resolve the conflict. If the sports arbitration commission committee in Korea had still been active, it could have come to a peaceful settlement domestically. Therefore we have to reestablish a Korean sports arbitration committee centered around experts of sports law.

해외투자(海外投資)와 지속가능발전 원칙 - 적도원칙(赤道原則)(Equator Principles)을 중심으로 - (How to Reflect Sustainable Development in Overseas Investment including Equator Principles)

  • 박훤일
    • 한국무역상무학회:학술대회논문집
    • /
    • 한국무역상무학회 2006년도 제35회 하계 정기세미나
    • /
    • pp.45-72
    • /
    • 2006
  • The Equator Principles are a set of voluntary environmental and social guidelines for ethical project finance. These principles commit banks and other signatories to not finance projects that fail to meet these guidelines. The principles were conceived in 2002 on an initiative of the International Finance Corporation and launched in 2003. Since then, dozens of major banks have adopted the Principles, and with these banks among them accounting for more than three quarters of all project loan market volume the Principles have become the de facto standard for all banks and investors on how to deal with potential social and environmental effects of projects to be financed. While regarding the Principles an important initiative, NGOs have criticised the Principles for not producing real changes in financing activities and for allowing projects to go through that should have been screened out by the Principles, such as the Sakhalin-II oil and gas project in Russia. In early 2006, a process of revision of the principles was begun. The Equator Principles state that endorsing banks will only provide loans directly to projects under the following circumstances: - The risk of the project is categorized in accordance with internal guidelines based upon the environmental and social screening criteria of the International Finance Corporation (IFC). - For all medium or high risk projects (Category A and B projects), sponsors complete an Environmental Assessment, the preparation of which must meet certain requirements and satisfactorily address key environmental and social issues. - The Environmental Assessment report addresses baseline environmental and social conditions, requirements under host country laws and regulations, applicable international treaties and agreements, sustainable development and use of renewable natural resources, protection of human health, cultural properties, and biodiversity, including endangered species and sensitive ecosystems, use of dangerous substances, major hazards, occupational health and safety, fire prevention and life safety, socio-economic impacts, land acquisition and land use, involuntary resettlement, impacts on indigenous peoples and communities, cumulative impacts of existing projects, the proposed project, and anticipated future projects, participation of affected parties in the design, review and implementation of the project, consideration of feasible environmentally and socially preferable alternatives, efficient production, delivery and use of energy, pollution prevention and waste minimization, pollution controls (liquid effluents and air emissions) and solid and chemical waste management. - Based on the Environmental Assessment, Equator banks then make agreements with their clients on how they mitigate, monitor and manage those risks through an 'Environmental Management Plan'. Compliance with the plan is required in the covenant. If the borrower doesn't comply with the agreed terms, the bank will take corrective action, which if unsuccessful, could ultimately result in the bank canceling the loan and demanding immediate repayment. - For risky projects, the borrower consults with stakeholders (NGO's and project affected groups) and provides them with information on the risks of the project. - If necessary, an expert is consulted. The Principles only apply to projects over 50 million US dollars, which, according to the Equator Principles website, represent 97% of the total market. In early 2006, the financial institutions behind the Principles launched stakeholder consultations and negotiations aimed at revising the principles. The draft revised principles were met with criticism from NGO stakeholders, who in a joint position paper argued that the draft fails by ignoring the most serious critiques of the principles: a lack of consistent and rigorous implementation.

  • PDF