• Title/Summary/Keyword: Integrated railway system

Search Result 202, Processing Time 0.033 seconds

LTE-R LinkBudget Analysis for channels interference in the case of sharing the Integrated Public Network Frequency (통합공공망 주파수 공용 환경에서의 LTE-R 링크버짓 분석)

  • Won, Hong-sun;Kim, Seong-cheol
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.10
    • /
    • pp.1833-1839
    • /
    • 2017
  • Korea Railway is enhancing the railway wireless communication system from VHF and TRS which have been used for 100 years to LTE-R starting with Ministry of Science and ICT's allocation of Integrated Public Network Frequency on December 2014. LTE-R has advantages on technology performance, also on ease of evolution based on standardization compared to existing technologies. However there are few problems that need to be solved to provide stable railway wireless services in the future. Due to national spectrum policy, LTE-R has frequency interference with Integrated Public Networks (PS-LTE, LTE-M ) and UHD-TV which was commercialized in 2017. This paper introduces performance changes caused by interferences which were founded from the test bed in Wonju~Gangneung LTE-R project and the result of RAN-Sharing. In addition, this paper suggests the standard for LTE-R cell planning in the case of sharing the Integrated Public Network Frequency by analyzing the changes of designed link-budget factor based on the test result.

A Study on the Power Information System for the Electric Railway (전철 전력정보시스템에 관한 연구)

  • Kim, B.;Moon, Y.H.;Ryu, H.S.;Song, K.B.;Cho, Y.O.;Ahn, C.H.
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.359-365
    • /
    • 2001
  • The conventional SCADA adopted for the electric railway has the mere function of controlling and monitoring the hardware itself. Lack of the functions necessary far the fault prevention and the system recovery requires the operators to depend on their intuition and experience. To make up far these shortcomings of the conventional SCADA, PIS(Power Information System) visually offers integrated information for the optimal operation of the power system by manipulating the raw data acquired from the SCADA. In this paper we have studied the variety of information and its feasibility that can be offered individually by PIS.

  • PDF

Functions and Feasible Methods of the PIS for the Electric Railway (전철 전력정보시스템의 기능 및 구현 방법)

  • Kim, B.;Chung, K.W.;Moon, Y.H.;Ahn, C.H.
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.1019-1026
    • /
    • 2002
  • The conventional SCADA being used in the electric railway has the basic functions of remote controlling and system monitoring. Since the SCADA lacks the functions essential to the fault prevention and the system recovery, operators must depend on their intuition and experience to considerable extent. Visually integrated information offered by PIS contributes to the fast system recovery and the state judgment of the power system, and makes a novice be adapted for the operation easily. In this paper, we have studied the various functions and its feasibility that can be offered by PIS.

  • PDF

Study of Distributed Software for IP-Based Integrated Surveillance System (IP 방식의 종합감시 시스템을 위한 분산 소프트웨어 연구)

  • Song, Gyu-Youn;Ryu, Hee-Moon;An, Tae-Ki;Lee, Woo-Dong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.363-370
    • /
    • 2008
  • The surveillance system for urban transit now adapt the newest IT technology. The Surveillance system analyzes the video information from various cameras intelligently and determines the critical status automatically. Other sensors, for example fire sensor and audio sensor are used in the surveillance system for increasing the correctness of surveillance. The surveillance system tries to increase the performance of surveillance by gathering lots of information for the current situation and analyzing them intelligently. IP-Based Integrated system needs the distributed computer system with location and functions. For correctly running this system, a distributed software is needed. In this paper, we study the distributed software for IP-based integrated surveillance system. The required functions, safety and extendability are suggested.

  • PDF

Rail in The Netherlands

  • Lamers, J.P.
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.145-149
    • /
    • 2002
  • Fully integrated with European system. Duisburg: 7 hrs; Hamburg 21: Dresden 30. Antwerp: 3; Paris: 10; Basel 14. 2600 kilometers--2000 km electrified with 1500V overhead wire.(omitted)

  • PDF

A Study on Improvement of Collected Data Performance in Real-time Railway Safety Supervisory Platform (실시간 철도안전관제 플랫폼에서의 수집 데이터 성능 개선 방안 연구)

  • Shin, Kwang-Ho;Park, Jee-Won;Ahn, Jin
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.233-241
    • /
    • 2018
  • Recently, integrated railway safety monitoring and control system, which is a convergence system based on data distribution service for railway safety monitoring and control, is under development. It collects safety data of vehicle, signal, power and safety monitoring facilities in real time and adopts communication middleware based on distributed service for mass data processing. However, in the case of a server device used as an existing control server, the performance of the distributed service middleware can not be exhibited due to low hardware performance due to safety reasons. In the safety control system, 200,000 packets per second were set as the transmission target, but the performance test of the LAB was not satisfied. In this paper, we analyze the characteristics of railway data to improve the data collection performance of existing equipment and apply DDS-based streaming transmission method to the data model of signal facilities and vehicle facilities with large packet amount according to the analysis result. As a result, it was confirmed that the throughput was improved about 30.4 times when the hardware performance was the same. We plan to improve the data processing performance by applying it to real-time railway safety integrated monitoring and control system in the future.

Construction of Integrated Signalling System for Next-generation High-Speed Train (한국형 고속전철용 신호시스템 시제품의 시험을 위한 통합신호시스템 구축)

  • Hwang, Jong-Gyu;Shin, Duck-Ho;Joung, Eui-Jin;Lee, Jong-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1220-1222
    • /
    • 2002
  • The railway signaling system consists of several vital computerized equipments. Now the project for development of signaling system for the next-generation high-speed train is progressed according to the consortium. The developing signaling system by this project, kTCS(Korean Train Control System), is composed of kTCS-CTC, kTCS-IXL, kTCS-ATC and etc. The KTCS signaling has to be operated as a integrated system by interface between each signaling. To achieve these, communication protocols between each signaling have to be designed and message codes are defined. In this paper the configuration of integrated kTCS system and designed communication protocol is presented.

  • PDF

Model-based Development of Integrated Onboard Signaling System (모델기반 통합 차상신호시스템 개발)

  • Han, Jae-Mun;Kim, Seok-Heon;Cho, Yong-Gi
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.245-250
    • /
    • 2011
  • ERTMS/ETCS Level 1 ATP, ATC and ATS are Signaling Systems adopted in korea. For operating in three different trackside signaling systems, train must have individual onboard signaling systems, ATP, ATC and ATS. Three signaling systems in one train is the main cause to increase installation and maintenance cost. Also it is need more effort to change a onboard signaling system depend on the trackside signaling system. those things should lead to decrease efficiency of the onboard signaling system. one integrated onboard signaling system for ATP, ATC and ATS is the good solution for those problems. IOSS is an integrated Onboard Signaling System and still developing. In this paper, we introduce the methodology of model-based development of IOSS. IOSS has one superviser process and several functional blocks to process individual signaling system s. Rhapsody which is CASE tool is used to construct the structure and develop the software for IOSS.

  • PDF

Study on the Design of Operation Scenario for Replacement of a Railway Signaling System (철도신호시스템 교체에 따른 운행 시나리오 도출에 관한 연구)

  • Jeong, Rag-Gyo;Kim, Baek-Hyun;Kang, Seok-Won;Kho, Young-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.8
    • /
    • pp.1064-1069
    • /
    • 2014
  • The railway signalling system plays an essential role in the headway and routing control for a safe and efficient train operation. The reliable and safe operation of the system is very important because the failure of the railway signalling system can lead to the collision, derailment, or unexpected stop of a train. So far, the conventional wayside signal mode (ATS: Automatic Train Stop) has been generally used as the railway signalling system. However, this system is highly linked to a risk of major accidents resulted from human mistakes such as missing a signal or careless control of train speed. Accordingly, the onboard signal mode (ATC: Automatic Train Control) as an alternative of ATS has been recently introduced and applied to transmit effectively the information on speed control of a train by using computers and communication equipment. In the process of replacing the obsolete signal system, it is necessary to switch over the system while providing passengers with normal services. Therefore, the integration of a railway signaling system compatible for both ATS and ATC and its interface is discussed in this study. In particular, the implementation scenario required for operation planning of the integrated system was designed, and the results as well as effects of its applicability test were also presented.