Series hybrid electric vehicles (SHEVs) having multiple power sources such as an engine- generator (EnGen), a battery, and an ultra-capacitor require a power control unit with high power density and reliable control operation. However, manufacturing using separate individual power converters has the disadvantage of low power density and requires a large number of power and signal cable wires. It is also difficult to implement the optimal power distribution and fault management algorithm because of the communication delay between the units. In order to address these concerns, this approach presents a design methodology and a power control algorithm of an integrated power converter for the SHEVs powered by multiple power sources. In this work, the design methodology of the integrated power control unit (IPCU) is firstly elaborately described, and then efficient and reliable power distribution algorithms are proposed. The design works are verified with product-level and vehicle-level performance experiments on a 10-ton SHEV.
In this paper, we described the integrated monitoring system for low-voltage panel boards. This system consists of three parts, a panel board controller, an integrated monitoring unit and a remote PC. The panel board controller which was made of CT/PT unit, control unit and power supply is able to transmit variable parameter for monitoring and diagnosis of low voltage branch circuits. Also, the integrated monitoring unit was collected monitoring data from panel boards and displayed on the touch panel.
These days, most of electric power facilities need high stability. Therefore integrated system has been required to monitor and control electronic power distribution system in fields at all times when the interruption of electric power has occurred. To construct this system, unit that convert and process the input signal from fields needed. And for control and monitoring from remote place MMI software is required. Lastly network equipments are required for real-time communications. So, in this paper, units for control and monitoring of emergency power generator and for electric power monitoring in normal electric power and interruption of electric power are developed. Also integrated remote system for monitoring in remote is developed.
최근 네트워크회선 사용비용의 안정화로 인해 IP방송과 통신장비가 확대 보급되고 있으나, TV, DID와 같은 멀티미디어에는 고가의 네트워크 시스템을 이용한 통합관리 시스템을 사용하고 있지 않다. 제안된 멀티미디어 통합 TCU(terminal control unit)는 Wake-on-Lan을 셋탑박스에 탑재한 후에 기존 네트워크의 IP통신망을 사용하여 TV전원의 On/Off의 상태 확인 및 원격제어, 전원 제어 예약 기능(관제실 소프트웨어 지원), TV채널 변경, 다양한 인터페이스 입출력 AC전원 & Lan포트, RS-232C, IR등을 지원하는 제어기기로 기존에 저가의 제어기기로 사용되던 RF방식과는 다르게 24시간 감시 및 제어할 수 있다. 높은 가격과 확장성이 전무한 기존 제어장비에서 24시간 모니터링 기능과 자동제어 시스템 지원과 저가격인 TCU(Termial Control Unit)의 개발은 폭넓은 사용처를 확보할 것으로 예상된다.
Supervisory Control And Data Acquisition(SCADA) of electric power system refersto the system that displays, monitors and executes the control commands for remote electric power system. KNR's existing electric power control system is built on UNIX platform such that it costs more for system construction, and people with UNIX skills can only be an operator who controls and manages the system. Moreover, since the system is mainly operated in local offices, system operators must communicate with local operators to investigate the cause of the accident and react the accident every time the system fails. As a new integrated SCADA system is constructed, establishment of small-unit electric power control system, that alters local electric power control system in designated stations, is required. In this study, the electric power control system, which accommodates all functions of UNIX-based SCADA system and facilitates operation and even maintenance for local operators, is to be developed. In order to develop small-unit electric power control system, the industrial automation program, "Cimon", is used. The small-unit electric power control system that accommodatesRTU and newly installed electronic switchboard is being developed and tested at Chulam station of KNR.
In this paper, a new algorithm of Integrated Volt/Var Control (IVVC) is proposed using Volt/Var control for the Distribution Automation System (DAS) based on the modeling of the distributed load and the distributed current. In the proposed, the load flow based on the modeling of the distributed load with Distributed Generation and the distributed current are estimated from constants of four terminals using the measurement of the current and power factor from a Feeder Remote Terminal Unit (FRTU). For Integrated Volt/Var Control (IVVC), the gradient method is applied to find optimal solution for tap and capacity control of OLTC (On-Load Tap Changers), SVR (Step Voltage Regulator), and SC (Shunt Condenser). What is more Volt/Var control method is proposed using moving the tie switch as well as IVVC algorithm using power utility control. In the case studies, the estimation and simulation network have been testified in Matlab Simulink.
Most power steering systems obtain the power by a hydraulic mechanism. Therefore, it consumes more energy because the oil power should be sustained all the times. Recently, to solve this problem the electric power system has been developed and become widely equipped in passenger vehicles. In this research the simulation integration technique for an electric power steering system with MATLAB/SIMULINK and a full vehicle model with ADAMS has been developed. A full vehicle model interacted with electronic control unit algorithm is concurrently simulated with an impulsive steering wheel torque input. The dynamic responses of vehicle chassis and steering system are evaluated. This integrated method allows engineers to reduce the prototype testing cost and to shorten the developing period.
In this paper, a new algorithm of Integrated Volt/Var Control (IVVC) is proposed using Volt/Var control for the Distribution Automation System (DAS) based on the modeling of the distributed load and the distributed current. In the proposed, the load flow based on the modeling of the distributed load and the distributed current are estimated from constants of four terminals using the measurement of the current and power factor from a Feeder Remote Terminal Unit (FRTU). For Integrated Volt/Var Control (IVVC), the gradient method is applied to find optimal solution for tap and capacity control of OLTC (On-Load Tap Changers), SVR (Step Voltage Regulator), and SC (Shunt Condenser). What is more Volt/Var control method is proposed using moving the tie switch as well as IVVC algorithm using power utility control. In the case studies, the estimation and simulation network have been testified in Matlab Simulink.
본 논문에서는 $0.35{\mu}m$ CMOS 공정을 이용하여 태양 에너지 하베스팅을 위한 에너지 관리 시스템을 설계하였다. 태양 에너지 관리 시스템은 ISC(Integrated Solar Cell), voltage booster, MPPT(Maximum Power Point Tracker) control unit으로 구성된다. ISC의 개방전압은 약 0.5V이고, 단락 전류는 약 $15{\mu}A$이다. Voltage booster는 뒷단에 약 1.5V로 승압된 전압을 공급한다. MPPT control unit은 ISC가 MPP점에 도달 하였을 때, load로 전력이 전달될 수 있도록 pMOS 스위치를 동작시킨다. SEMU(Solar Energy Management Unit)의 크기는 패드를 포함하여 $360{\mu}m{\times}490{\mu}m$이다. ISC의 면적은 $500{\mu}m{\times}2000{\mu}m$이다. 제작된 칩을 측정한 결과 설계된 SEMU가 ISC에서 수확된 에너지에 대해 MPPT control 동작을 제대로 수행하는 것을 확인하였다. 측정된 MPP 전압범위는 약 370mV∼420mV이다.
최근 LED 디스플레이 시스템의 대형화에 따라서 시스템의 효과적인 전력 제어 방법에 대한 연구가 진행 중이다. 그 중에서 본 논문에서는 BLU(Backlight unit)시스템의 채널 별 LED 특성차에 기인한 전력 손실을 최소화하기 위한 전력 제어 방법을 제안하였다. 제안된 전력 제어 기능을 갖는 LED 드라이버 IC는 전 채널의 정전류 동작이 가능한 최소 headroom 전압을 검출 후 DC-DC 컨버터 출력을 선형적으로 제어하여, 불필요한 추가 전압에 따른 전력 소모를 최소화 할 수 있도록 하였다. 또한 채널 별 전압 감지 비교기와 기준 전압 생성 회로가 필요하지 않아서 집적 회로 구현시 칩사이즈 감소 및 안정화 측면에서 큰 장점을 갖는다. 제안된 전력 제어 기능 동작을 검증하기 위해서, DC-DC 내장형 전력제어 LED driver IC를 Cadence 및 Synopsys사의 Design Tool을 사용하여 설계하였으며, Magnachip 0.35um 5V/40V CMOS 공정을 사용하여 제작하였다. 제작된 IC실험을 통해서 제안된 전력 제어 방법이 BLU시스템의 최소 필요 전압을 정상적으로 제어함을 확인하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.