• 제목/요약/키워드: Integrated Steam Generator

검색결과 41건 처리시간 0.024초

Steady-State Performance Analysis of Pressurizer and Helical Steam Generator for SMART

  • Seo, Jae-Kwang;Kang, Hyung-Seok;Kim, Hwan-Yeol;Cho, Bong-Hyun;Lee, Doo-Jeong
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1997년도 춘계학술발표회논문집(1)
    • /
    • pp.310-315
    • /
    • 1997
  • System-Integrated Modular Advanced Reactor (SMART), where major primary components such as modular helical steam generator and self regulating pressurizer are integrated into reactor vessel, is currently under development. The pressurizer is designed to control the primary pressure mainly with partial pressure of nitrogen gas and to maintain the fluid temperature as low as possible for the purpose of minimizing steam contribution. The steam generator (SG) is designed to produce super-heated steam inside tube at power operation. Because the in-vessel pressurizer and in-vessel SG are classified as the characteristic components of SMART, it is important to perform a steady state calculation of these components in order to evaluate the adoption of these components. A steady state analysis of the in-vessel pressurizer and in-vessel SG has been performed under normal power operation and the results show an acceptable performance of the components.

  • PDF

FEASIBILITY OF AN INTEGRATED STEAM GENERATOR SYSTEM IN A SODIUM-COOLED FAST REACTOR SUBJECTED TO ELEVATED TEMPERATURE SERVICES

  • Koo, Gyeong-Hoi;Lee, Jae-Han
    • Nuclear Engineering and Technology
    • /
    • 제41권8호
    • /
    • pp.1115-1126
    • /
    • 2009
  • As one of the ways to enhance the economical features in sodium-cooled fast reactor development, the concept of an integrated steam generator and pump system (ISGPS) is proposed from a structural point of view. And the related intermediate heat transfer system (IHTS) piping layout compatible with the ISGPS is described in detail. To assure the creep design lifetime of 60 years, the structural integrity is investigated through high temperature structural evaluation procedures by the SIE ASME-NH computer code, which implements the ASME-NH design rules. From the results of this study, it is found that the proposed ISGPS concept is feasible and applicable to a commercial SFR design.

대용량 발전소 재열재생 증기터빈 제어알고리즘에 관한 고찰 (A Study on Turbine Control Algorithms for Large Steam Turbine in a Power Plant)

  • 최인규;정창기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1665-1666
    • /
    • 2008
  • There are three main devices such as boiler producing steam, turbine driving generator and generator producing electricity. An electrical generator in power plant is driven and maintained its speed at rated by steam turbine which is coupled into generator directly. Therefore after the steam turbine reaches its rated speed and the generator gets into parallel operation with power grid, the electrical power can be increased by turbine controller or governor. The first governor was invented by James Watts for the steam engine to be maintained at a constant speed. The first governor by him was mechanical type with fly balls. The electrical type governor was created due to the progress of electronic devices such as operational amplifiers or integrated circuits. and Today digital electronic type of governor is being widely used in most prime movers.

  • PDF

Simulation of Multiple Steam Generator Tube Rupture (SGTR) Event Scenario

  • Seul Kwang Won;Bang Young Seok;Kim In Goo;Yonomoto Taisuke;Anoda Yoshinari
    • Nuclear Engineering and Technology
    • /
    • 제35권3호
    • /
    • pp.179-190
    • /
    • 2003
  • The multiple steam generator tube rupture (SGTR) event scenario with available safety systems was experimentally and analytically evaluated. The experiment was conducted on the large scaled test facility to simulate the multiple SGTR event and investigate the effectiveness of operator actions. As a result, it indicated that the opening of pressurizer power operated relief valve was significantly effective in quickly terminating the primary-to-secondary break flow even for the 6.5 tubes rupture. In the analysis, the recent version of RELAP5 code was assessed with the test data. It indicated that the calculations agreed well with the measured data and that the plant responses such as the water level and relief valve cycling in the damaged steam generator were reasonably predicted. Finally, sensitivity study on the number of ruptured tubes up to 10 tubes was performed to investigate the coolant release into atmosphere. It indicated that the integrated steam mass released was not significantly varied with the number of ruptured tubes although the damaged steam generator was overfilled for more than 3 tubes rupture. These findings are expected to provide useful information in understanding and evaluating the plant ability to mitigate the consequence of multiple SGTR event.

Characteristics of the Integrated Steam Generators for a Liquid Metal Reactor

  • Sim Yoon Sub;Kim Eui Kwang
    • Nuclear Engineering and Technology
    • /
    • 제36권2호
    • /
    • pp.127-141
    • /
    • 2004
  • Various types of integrated steam generators, which integrate IHTS and a steam generator into a single unit of equipment for an LMR, were analyzed using an analytic solution with some simplification. The analysis showed that the undesirable reversed heat transfer, of which occurrence was previously observed only in an integrated single-region bundle type, can also occur in an integrated double-region bundle type. The mechanism of the reversed heat transfer occurrence in the double-region type is explained and it is shown the mechanism in the double-region type is completely different from that in the single-region type. Based on this finding, a method for preventing the aforementioned heat transfer is suggested. The performance of the four types of the integrated steam generators is assessed. For this assessment, a SG is actually designed for each type and the optimization in the geometric parameters and flow rate are optimized.

Evaluation of New Design Concepts for Steam Generators in Sodium Cooled Liquid Metal Reactors

  • Kim, Seong-O.;Sim Yoonsub;Kim, Eui-kwang.;Myung-Hwan.Wi;Han, Dohee.
    • Nuclear Engineering and Technology
    • /
    • 제35권2호
    • /
    • pp.121-132
    • /
    • 2003
  • To reduce the construction cost and enhance the safety of sodium cooled liquid metal reactors, various kinds of new design concepts were evaluated using the KALIMER operation condition. The required equipment sizes were set for plant electricity output to be similar to that of KALIMER. The evaluations were made focusing on the plant performance and implementation practicality. Each design concept was evaluated for the concept itself and design impacts to interfacing systems. Through the evaluation of the concepts, it was found that the most favorable design concept is the integrated steam generator with forced convection using lead bismuth as the intermediate heat transfer fluid between the primary sodium tube and feed water/steam tube in the steam generator.

분리형 개질기를 이용한 고효율 일체형 개질기 개발에 관한 연구 (Research of High Efficiency Integrated Reforming System Using Separated Reforming System)

  • 박상현;김철민;손성효;장세진;김재동;방완근;이상용
    • 한국수소및신에너지학회논문집
    • /
    • 제29권1호
    • /
    • pp.11-18
    • /
    • 2018
  • A high efficiency integrated reforming system for improving the efficiency of the 5 kW PEMFC system used as the back up power of building was studied. The separated reforming system consisted of three parts - A steam reformer with two stage concentric circular shape, a heat exchanger type steam generator and a CO shift reactor. Temperature and steam carbon ratio (SCR) were control variables during operation. The operating conditions were optimized based on the thermal efficiency of the steam reformer as reformate gas composition changes at different temperature. In experiments, water was fully vaporized in the steam generator up to SCR 3.5 and the maximum thermal efficiency was achieved at the operating temperature around $700^{\circ}C$ in the steam reforming reactor. With the results of the separated reforming system research, we improved the shape of high efficiency integrated reformer. The performance evaluation of the integrated reformer was based on optimized operating conditions in SCR 3.5. As a result, the developed integrated reforming system maintained an efficiency of 76% and constant performance over 3,000 hours.

원전 증기 발생기 전열관 검사 자동화를 위한 지능형 통합 시스템 개발 (Development of an intelligent and integrated system for automatic inspection of steam-generator tubes in nuclear power plant)

  • 강순주;최유락;최성수;우희곤
    • 제어로봇시스템학회논문지
    • /
    • 제2권3호
    • /
    • pp.236-241
    • /
    • 1996
  • This paper presents a new eddy current testing system for inspecting tubes of steam generator in nuclear power plant. The proposed system adopted embedded expert system concept to automate tasks of the inspection such as inspection planning and flaw signal interpretation, and integrated all the tasks into a client/server type computing architecture using database management system. Therefore, human factor errors occurred during inspection could be minimized and the inspection data could be transferred in real-time. As a result, we can increase the level of inspection confidence and the productivity of a personal inspector. A prototype of the proposed system has been developed for 5 years and the test operation has been performed in domestic nuclear power plants.

  • PDF

화학플랜트 고온고압부 설계 효율화를 위한 일관시스템 구축 (Development of Integrated Design System for High Temperature, High Pressure Parts for Chemical Plants)

  • 정동관
    • 한국가스학회지
    • /
    • 제2권4호
    • /
    • pp.1-6
    • /
    • 1998
  • 중화학 플랜트의 고온고압 요소인 증기 발생기(steam generator)의 드럼, 헤더 및 헤더 스터브 설계에 응력해석에서 부터 도면자동작도, 제작용 서류 자동생성에 이르기까지의 제반설계과정을 체계적으로 연결시킨 설계정보 통합 관리로 단순 설계오류를 줄이고, 또한 설계변경에 대해 신속한 재설계가 가능한 효율적인 설계를 도모하기 위하여 "피로수명을 고려한 헤더스터브 형상설계 모듈", "TRD301을 기초로한 후육내압부 운전조건(기동/정지 조건) 및 수명평가 모듈", "헤더 및 드럼부 자동작도 모듈"을 개발하였다. 이에 따라 형상설계 모듈을 이용하여 설계된 스터브 형상을 토대로 수명평가 모듈로 수명을 평가한 후 상세설계 도면 및 관련 서류의 자동작도로 이어지는 일관된 종합설계 시스템을 구축하였다.

  • PDF

원전 증기발생기 와전류검사 시스템 개발 (A Development of Eddy Current Testing System for Steam Generators Inspection in Nuclear Power Plants)

  • 문균영;조찬희;유현주;이태훈;조용배
    • 한국압력기기공학회 논문집
    • /
    • 제9권1호
    • /
    • pp.40-47
    • /
    • 2013
  • The capacity factor of nuclear power plant in Korea is the highest level in the world. However, the integrity assessment of nuclear power plant is depended on foreign country. Especially, most eddy current testing systems for inspecting steam generators in nuclear power plant are currently imported from USA, Canada, and so on. Therefore, the eddy current testing system can react more active and adaptive from economic and managerial standpoint for actual nuclear power plants in Korea is required. In this paper, an eddy current testing system for inspecting steam generators in nuclear power plants is introduced. Frequency generator, analog circuit, analog digital converter circuit, and digital control circuit are composed in eddy current testing system. A benchmarking of acquisition system and acquisition software, eddynet 11i made by Zetec, and modifications are carried out based on the test environment of Korea nuclear power plants. Finally, all eddy current apparatus are integrated to inspect steam generator tubes in nuclear power plants.