The extent and depth of the event plan determines the scope of pedagogical experience in situations and consequently the quality of immersive learning based on our simulated world. In contrast to planning in conventional narrative-based systems mainly pursuing dramatic interests, planning in virtual world-based pedagogical systems strive to provide realistic experiences in immersed situations. Instead of story plot comprising predetermined situations, our inter-event planning method aims at simulating diverse situations that each involve multiple events coupled via their associated agents' conditions and meaningful associations between events occurring in a background world. The specific techniques to realize our planning method include, two-phase planning based on inter-event search and intra-event decomposition (down to the animated action level); autonomous and independent agents to behave proactively with their own belief and planning capability; full-blown background world to be used as the comprehensive stage for all events to occur in; coupling events via realistic association types including deontic associations as well as conventional causality; separation of agents from event roles; temporal scheduling; and parallel and concurrent event progression mechanism. Combining all these techniques, diverse exogenous events can be derived and seamlessly (i.e., semantically meaningfully) integrated with the original event to form a wide scope of situations providing chances of abundant pedagogical experiences. For effective implementation of plan execution, we devise an execution scheme based on multiple priority queues, particularly to realize concurrent progression of many simultaneous events to simulate its corresponding reality. Specific execution mechanisms include modeling an action in terms of its component motions, adjustability of priority for agent across different events, and concurrent and parallel execution method for multiple actions and its expansion for multiple events.
The operating systems in the system architecture, which is integrated several applications and modular electronic devices in the same computing device, demand partitioning technology for safety. Thus, operation system requires partition scheduler for partition scheduling. When we design partition scheduler in embedded system, which has small memory and low performance, such as space system, we must consider not only performance but also memory. In this paper, we introduces a linux-based memory efficient partition scheduler using partition bitmap. This partition scheduler demands small memory space and produce low partition switching overhead. The prototype was executed on a LEON4 processor, which is the Next Generation Multicore Processor (NGMP) in the space sector. In evaluation, this prototype shows accuracy, additional memory space and low partition switching overhead.
The Transactions of the Korea Information Processing Society
/
v.7
no.5
/
pp.1464-1473
/
2000
In this paper, we analyze the cycle property of the (n,k)-star graph that has an attention as an alternative interconnection network topology in recent years. Based on the graph-theoretic properties in (n,k)-star graphs, we show the pancyclic property of the graph and also present the corresponding algorithm. Based on the recursive structure of the graph, we present such top-down approach that the resulting cycle can be constructed by applying series of "dimension expansion" operations to a kind of cycles consisting of sub-graphs. This processing naturally leads to such property that the resulting cycles tend to be integrated compactly within some minimal subset of sub-graphs, and also means its applicability of another classes of the disjoint-style cycle problems. This result means not only the graph-theoretic contribution of analyzing the pancyclic property in the underlying graph model but also the parallel processing applications such a as message routing or resource allocation and scheduling in the multi-computer system with the corresponding interconnection network.
Journal of the Society of Naval Architects of Korea
/
v.52
no.2
/
pp.97-103
/
2015
This paper has focused on the middle term process planning around quays based on the prefixed long-term plan of the product mixed ships. Recently, the order rate of high add-value ships in domestic shipyards has been sharply increased and the spending time at quays is accordingly on an increasing trend. For proper and practical process planning related to quays, it has to be closely connected with a long-term plan and product calendar, erection network and result of ship allocation around quays. Moreover, it is also required to include the integrated consideration of the whole process of a yard, each ship, and each team respectively. The most distinguishing feature of this study is that it would run on the ship allocation simulator and GIS framework in order not to be limited to the specific one yard and the readers can figure out the optimization formulation containing the work load leveling and a different approach from PERT/CPM. The proposed approach reflected all requirements from the department of process planning and management in a shipyard, and the analysis of the results has explained its performance of the optimization result with the examples of total 43 ships under construction from 2008 to 2013.
Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.886-891
/
2007
All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2011.10a
/
pp.116-120
/
2011
In this paper, we have designed and implemented the integrated protocol gateway for the integration of CAN and Profibus networks. To do that, we used the Switched Ethernet as Backbone network, and each fieldbus network is connected by CAN/Ethernet or Profibus/Ethernet gateway, and each gateway perform the translation between fieldbus and Ethernet frames. Futhermore, we realized the real-time features in the environment of the Switched Ethernet by applying the distributed hard real-time scheduling algorithm among each gateways. To implement tht CAN/Ethernet and Profibus/Ethernet gateways, we used the Linux of kernel 2.6.31.12 real-time patched version(PREEMTED_RT), and we could verify successful message translation and real-time features through real implementation.
GPS (Global Positioning System) is the most ideal navigation system which can be used on the earth irrespective of time and weather conditions. GPS has been used for various applications such as construction, survey, environment, communication, intelligent vehicles and airplanes and the needs of GPS are increasing in these days. This paper deals with the design and implementation of the RTOS (Real-Time Operating System) for a GPS navigation computer in the GPS/INS integrated navigation system. The RTOS provides the optimal environment for execution and the base platform to develop GPS application programs. The key facilities supplied by the RTOS developed in this paper are priority-based preemptive scheduling policy, dynamic memory management, intelligent interrupt handling, timers and IPC, etc. We also verify the correct operations of all application tasks of the GPS navigation computer on the RTOS and evaluate the performance by measuring the overhead of using the RTOS services.
Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.13
no.2
/
pp.115-123
/
2018
This study is empirically intended to put forward the modeling and process improvement measures for the SCM capability in small venture firms. The findings are summarized as follows. There were strategic alliance, technological development and centralization in the modeling of strategic planning for supply chain, not the least of which is strategic alliance, followed by centralization and technological development. There were routing scheduling, network integration and third party logistics outsourcing in decision making, not the least of which was network integration. There were customer service management, productivity management and quality management in management control, not the least of which was quality management. And there were order management choice, pricing demand, shipment delivery and customer management in transaction support system, not the least of which was order management choice. As for the above-mentioned findings, to maximize the SCM capability and operate the optimized process in small venture firms, the existing strategic alliances can optimize the quality management and stabilize the transaction support system through the network sharing and integration from the perspective of relevant organizational members' capability and process improvement. And the strategic linkage between firms can maximize the integrated capability of information system beyond the simple exchange relation between electronic data, achieving a differentiated competitive advantage. Consequently, the systematization and centralization for the maximization of SCM capability, including the infrastructure construction based on the system compatibility and reliability for information integration, should be preceded before the modeling of the integrated capability for optimum supply chain and the best process management in the smart era.
Journal of The Korean Society of Agricultural Engineers
/
v.62
no.3
/
pp.1-13
/
2020
The management of agricultural water can be divided into management of agricultural infrastructure and operation to determine the timing and quantity of water supply. The target of water management is classified as water-supply facilities, such as reservoirs, irrigation water supply, sluice gate control, and farmland. In the case of agricultural drought, there is a need for water supply capacity in reservoirs and for drought assessment in paddy fields that receive water from reservoirs. Therefore, it is necessary to analyze the water supply amount from intake capacity to irrigation canal network. The analysis of the irrigation canal network should be considered for efficient operation and planning concerning optimized irrigation and water allocation. In this study, we applied a hydraulic analysis model for agricultural irrigation networks by adding the functions of irrigation canal network analysis using the SWMM (Storm Water Management Model) module and actual irrigation water supply log data from May to August during 2015-2019 years in Sinsong reservoir. The irrigation satisfaction of ponding depth in paddy fields was analyzed through the ratio of the number of days the target ponding depth was reached for each fields. This hydraulic model can assist with accurate irrigation scheduling based on its simulation results. The results of evaluating the irrigation efficiency of water supply can be used for efficient water distribution and management during the drought events.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.