• Title/Summary/Keyword: Integrated Scheduling

Search Result 219, Processing Time 0.023 seconds

A Simulation Method For Virtual Situations Through Seamless Integration Of Independent Events Via Autonomous And Independent Agents

  • Park, Jong Hee;Choi, Jun Seong
    • International Journal of Contents
    • /
    • v.14 no.3
    • /
    • pp.7-16
    • /
    • 2018
  • The extent and depth of the event plan determines the scope of pedagogical experience in situations and consequently the quality of immersive learning based on our simulated world. In contrast to planning in conventional narrative-based systems mainly pursuing dramatic interests, planning in virtual world-based pedagogical systems strive to provide realistic experiences in immersed situations. Instead of story plot comprising predetermined situations, our inter-event planning method aims at simulating diverse situations that each involve multiple events coupled via their associated agents' conditions and meaningful associations between events occurring in a background world. The specific techniques to realize our planning method include, two-phase planning based on inter-event search and intra-event decomposition (down to the animated action level); autonomous and independent agents to behave proactively with their own belief and planning capability; full-blown background world to be used as the comprehensive stage for all events to occur in; coupling events via realistic association types including deontic associations as well as conventional causality; separation of agents from event roles; temporal scheduling; and parallel and concurrent event progression mechanism. Combining all these techniques, diverse exogenous events can be derived and seamlessly (i.e., semantically meaningfully) integrated with the original event to form a wide scope of situations providing chances of abundant pedagogical experiences. For effective implementation of plan execution, we devise an execution scheme based on multiple priority queues, particularly to realize concurrent progression of many simultaneous events to simulate its corresponding reality. Specific execution mechanisms include modeling an action in terms of its component motions, adjustability of priority for agent across different events, and concurrent and parallel execution method for multiple actions and its expansion for multiple events.

Linux-based Memory Efficient Partition Scheduler using Partition Bitmap (파티션 비트맵을 이용한 메모리 효율적인 리눅스 파티션 스케줄러)

  • Kwon, Cheolsoon;Joe, Hyunwoo;Kim, Duksoo;Kim, Hyungshin
    • KIISE Transactions on Computing Practices
    • /
    • v.20 no.9
    • /
    • pp.519-524
    • /
    • 2014
  • The operating systems in the system architecture, which is integrated several applications and modular electronic devices in the same computing device, demand partitioning technology for safety. Thus, operation system requires partition scheduler for partition scheduling. When we design partition scheduler in embedded system, which has small memory and low performance, such as space system, we must consider not only performance but also memory. In this paper, we introduces a linux-based memory efficient partition scheduler using partition bitmap. This partition scheduler demands small memory space and produce low partition switching overhead. The prototype was executed on a LEON4 processor, which is the Next Generation Multicore Processor (NGMP) in the space sector. In evaluation, this prototype shows accuracy, additional memory space and low partition switching overhead.

Cycle Property in the (n,k)-star Graph ((n,k)-스타 그래프의 사이클 특성)

  • Chang, Jung-Hwan
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.5
    • /
    • pp.1464-1473
    • /
    • 2000
  • In this paper, we analyze the cycle property of the (n,k)-star graph that has an attention as an alternative interconnection network topology in recent years. Based on the graph-theoretic properties in (n,k)-star graphs, we show the pancyclic property of the graph and also present the corresponding algorithm. Based on the recursive structure of the graph, we present such top-down approach that the resulting cycle can be constructed by applying series of "dimension expansion" operations to a kind of cycles consisting of sub-graphs. This processing naturally leads to such property that the resulting cycles tend to be integrated compactly within some minimal subset of sub-graphs, and also means its applicability of another classes of the disjoint-style cycle problems. This result means not only the graph-theoretic contribution of analyzing the pancyclic property in the underlying graph model but also the parallel processing applications such a as message routing or resource allocation and scheduling in the multi-computer system with the corresponding interconnection network.

  • PDF

An Optimization of Process Planning around Quays based on the Yard Customized GIS and the Simulator (조선 전용 GIS와 안벽 시뮬레이터를 이용한 후행 중일정 최적화)

  • Ruy, Won-Sun;Hwang, Ho-Jin;Park, Chang-Kyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.2
    • /
    • pp.97-103
    • /
    • 2015
  • This paper has focused on the middle term process planning around quays based on the prefixed long-term plan of the product mixed ships. Recently, the order rate of high add-value ships in domestic shipyards has been sharply increased and the spending time at quays is accordingly on an increasing trend. For proper and practical process planning related to quays, it has to be closely connected with a long-term plan and product calendar, erection network and result of ship allocation around quays. Moreover, it is also required to include the integrated consideration of the whole process of a yard, each ship, and each team respectively. The most distinguishing feature of this study is that it would run on the ship allocation simulator and GIS framework in order not to be limited to the specific one yard and the readers can figure out the optimization formulation containing the work load leveling and a different approach from PERT/CPM. The proposed approach reflected all requirements from the department of process planning and management in a shipyard, and the analysis of the results has explained its performance of the optimization result with the examples of total 43 ships under construction from 2008 to 2013.

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

The Design & Implementation of Fieldbus Bridge for Integration of different Fieldbus networks (이기종 필드버스 통합을 위한 필드버스 게이트웨이 설계 및 구현)

  • Lee, Yeong-Min;Kim, Myung-Kyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2011.10a
    • /
    • pp.116-120
    • /
    • 2011
  • In this paper, we have designed and implemented the integrated protocol gateway for the integration of CAN and Profibus networks. To do that, we used the Switched Ethernet as Backbone network, and each fieldbus network is connected by CAN/Ethernet or Profibus/Ethernet gateway, and each gateway perform the translation between fieldbus and Ethernet frames. Futhermore, we realized the real-time features in the environment of the Switched Ethernet by applying the distributed hard real-time scheduling algorithm among each gateways. To implement tht CAN/Ethernet and Profibus/Ethernet gateways, we used the Linux of kernel 2.6.31.12 real-time patched version(PREEMTED_RT), and we could verify successful message translation and real-time features through real implementation.

  • PDF

Design and Implementation of Real-Time Operating System for a GPS Navigation Computer (GPS 항법 컴퓨터를 위한 실시간 운영체제의 설계 및 구현)

  • Bae, Jang-Sik;Song, Dae-Gi;Lee, Cheol-Hun;Song, Ho-Jun
    • The KIPS Transactions:PartA
    • /
    • v.8A no.4
    • /
    • pp.429-438
    • /
    • 2001
  • GPS (Global Positioning System) is the most ideal navigation system which can be used on the earth irrespective of time and weather conditions. GPS has been used for various applications such as construction, survey, environment, communication, intelligent vehicles and airplanes and the needs of GPS are increasing in these days. This paper deals with the design and implementation of the RTOS (Real-Time Operating System) for a GPS navigation computer in the GPS/INS integrated navigation system. The RTOS provides the optimal environment for execution and the base platform to develop GPS application programs. The key facilities supplied by the RTOS developed in this paper are priority-based preemptive scheduling policy, dynamic memory management, intelligent interrupt handling, timers and IPC, etc. We also verify the correct operations of all application tasks of the GPS navigation computer on the RTOS and evaluate the performance by measuring the overhead of using the RTOS services.

  • PDF

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.

A Study on the SCM Capability Modeling and Process Improvement in Small Venture Firms (중소·벤처기업의 SCM역량 모델링과 프로세스 개선 방안에 관한 연구)

  • Lee, Seolbin;Park, Jugyeong
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.13 no.2
    • /
    • pp.115-123
    • /
    • 2018
  • This study is empirically intended to put forward the modeling and process improvement measures for the SCM capability in small venture firms. The findings are summarized as follows. There were strategic alliance, technological development and centralization in the modeling of strategic planning for supply chain, not the least of which is strategic alliance, followed by centralization and technological development. There were routing scheduling, network integration and third party logistics outsourcing in decision making, not the least of which was network integration. There were customer service management, productivity management and quality management in management control, not the least of which was quality management. And there were order management choice, pricing demand, shipment delivery and customer management in transaction support system, not the least of which was order management choice. As for the above-mentioned findings, to maximize the SCM capability and operate the optimized process in small venture firms, the existing strategic alliances can optimize the quality management and stabilize the transaction support system through the network sharing and integration from the perspective of relevant organizational members' capability and process improvement. And the strategic linkage between firms can maximize the integrated capability of information system beyond the simple exchange relation between electronic data, achieving a differentiated competitive advantage. Consequently, the systematization and centralization for the maximization of SCM capability, including the infrastructure construction based on the system compatibility and reliability for information integration, should be preceded before the modeling of the integrated capability for optimum supply chain and the best process management in the smart era.

Assessment of Water Distribution and Irrigation Efficiency in Agricultural Reservoirs using SWMM Model (SWMM 모형을 이용한 농업용 저수지 용수분배 모의 및 관개효율 평가)

  • Shin, Ji-Hyeon;Nam, Won-Ho;Bang, Na-Kyoung;Kim, Han-Joong;An, Hyun-Uk;Do, Jong-Won;Lee, Kwang-Ya
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.3
    • /
    • pp.1-13
    • /
    • 2020
  • The management of agricultural water can be divided into management of agricultural infrastructure and operation to determine the timing and quantity of water supply. The target of water management is classified as water-supply facilities, such as reservoirs, irrigation water supply, sluice gate control, and farmland. In the case of agricultural drought, there is a need for water supply capacity in reservoirs and for drought assessment in paddy fields that receive water from reservoirs. Therefore, it is necessary to analyze the water supply amount from intake capacity to irrigation canal network. The analysis of the irrigation canal network should be considered for efficient operation and planning concerning optimized irrigation and water allocation. In this study, we applied a hydraulic analysis model for agricultural irrigation networks by adding the functions of irrigation canal network analysis using the SWMM (Storm Water Management Model) module and actual irrigation water supply log data from May to August during 2015-2019 years in Sinsong reservoir. The irrigation satisfaction of ponding depth in paddy fields was analyzed through the ratio of the number of days the target ponding depth was reached for each fields. This hydraulic model can assist with accurate irrigation scheduling based on its simulation results. The results of evaluating the irrigation efficiency of water supply can be used for efficient water distribution and management during the drought events.