• Title/Summary/Keyword: Integrated Planning

Search Result 1,120, Processing Time 0.026 seconds

An Integrated Robot-Trajectory-Planning Scheme for Spray Painting Operations (스프레이 페인팅 작업을 위한 일관화된 로보트 궤적계획법에 관한 연구)

  • Suh, Suk-Hwan;Woo, In-Kee
    • IE interfaces
    • /
    • v.3 no.2
    • /
    • pp.23-38
    • /
    • 1990
  • The use of robots for painting operations is a powerful alternative as a means for automation and quality improvement. A typical method being used for motion planning of the painting robot is to guide the robot along the desired path : the "lead-through" method. Although this method is simple and has been widely used, it has several drawbacks a) The robot cannot be used during the teaching period, b) A human is exposed to a hostile environment, c) The motions taught are, at best, human's skill level. To deal with the above problems, an integrated robot-trajectory planning scheme is presented. The new scheme takes CAD data describing the shape and geometry of the objects, and outputs an optimal trajectory in the sense of coating thickness and painting time. The purpose of this paper is to investigate theoretical backgrounds for such a scheme including geometric modeling, painting mechanics and robot trajectory planning, and develop algorithms for generating spray gun paths and minimum-time robot trajectories. Future study is to implement these algorithms on an workstation to develop an integrated software system ; ATPS(Automatic Trajectory Planning System) for spray painting robots.

  • PDF

An Integrated Production Management Model for a Manufacturing System (제조시스템을 위한 통합형 생산관리모형 구축)

  • Ahn, Jae-Kyoung
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.111-116
    • /
    • 2003
  • Business integration has been considered as one of the most critical success factors that enable the firms to gain competitive edges. Despite this trend, it has also been found among not a few companies that the activities that should be functionally tied with are performed even independently. In this study, an integrated model of production planning and inventory has been developed. Computerization of the production planning activities is proposed and implemented. We also proposed the reasonable inventory levels of each item using historic data of the items, which are composed of safety stock from the given fill-rate, operating stock from the production patterns, and reserved stock from the production planning. This study has helped the firm to have clearer job definition of the related processes, to tightly control the inventory by setting and tracing the reasonable fill rates for every product, and to quickly respond to the market changes through the computerized production planning process.

Integrated Development Planning for the Mongolian Economic Development Planning

  • Park, Myungho
    • Journal of Appropriate Technology
    • /
    • v.6 no.1
    • /
    • pp.65-78
    • /
    • 2020
  • This paper deals with challenges of Mongolian government regarding Economic Development Plan (hereafter EDP). EDP has a long history, appearing first in the socialist countries, then in European countries following the European Reconstruction Plan after the Second World War, and then in many developing countries after they gained independence from the colonial rule. Major challenges of the Mongolian EDP are largely related to the absence or lack of integrated approach. We will propose a new integrated framework based on the approach suggested by UNDP. The new framework consists of 5 core areas; 1) institutions and governance, 2) evidence-based and empirically backed policy options, 3) development of budgeting and financial system, 4) and monitoring and evaluation (M&E), 5) capacity development. In order to identify challenges in Mongolia, the new integrated approach was applied to diagnose current states. To understand current states of EDP in Mongolia, survey regarding EDP in Mongolia was conducted for the 43 officials of Ministry of Finance. The same approach was applied for Five-Year Economic Development Plans in Korea to compare performances with EDP in Mongolia. On the basis of comparative analysis of EDPs in Mongolia and Korea, some lessons are suggested.

The Integrated Process Planning and Scheduling in Flexible Assembly Systems using an Endosymbiotic Evolutionary Algorithm (내공생 진화알고리듬을 이용한 유연조립시스템의 공정계획과 일정계획의 통합)

  • Song, Won-Seop;Shin, Kyoung-Seok;Kim, Yeo-Keun
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.20-27
    • /
    • 2004
  • A flexible assembly system (FAS) is a production system that assembles various parts with many constraints and manufacturing flexibilities. This paper presents a new method for efficiently solving the integrated process planning and scheduling in FAS. The two problems of FAS process planning and scheduling are tightly related with each other. However, in almost all the existing researches on FAS, the two problems have been considered separately. In this research, an endosymbiotic evolutionary algorithm is adopted as methodology in order to solve the two problems simultaneously. This paper shows how to apply an endosymbiotic evolutionary algorithm to solving the integrated problem. Some evolutionary schemes are used in the algorithm to promote population diversity and search efficiency. The experimental results are reported.

An Integrated Planning of Production and Distribution in Supply Chain Management using a Multi-Level Symbiotic Evolutionary Algorithm (다계층 공생 진화알고리듬을 이용한 공급사슬경영의 생산과 분배의 통합계획)

  • 김여근;민유종
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.2
    • /
    • pp.1-15
    • /
    • 2003
  • This paper presents a new evolutionary algorithm to solve complex multi-level integration problems, which is called multi-level symbiotic evolutionary algorithm (MEA). The MEA uses an efficient feedback mechanism to flow evolution information between and within levels, to enhance parallel search capability, and to improve convergence speed and population diversity. To show the MEA's applicability, It is applied to the integrated planning of production and distribution in supply chain management. The encoding and decoding methods are devised for the integrated problem. A set of experiments has been carried out, and the results are reported. The superiority of the algorithm's performance is demonstrated through experiments.

A Study on The Database Design and Construction of Power System Operational Planning System (전력수급계획시스템 데이터베이스 설계 및 구축에 관한 연구)

  • Ahn, Yang-Keun;Park, Si-Woo;Nam, Jae-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1012-1014
    • /
    • 1998
  • This paper presents a database design for power system operational planning system of the integrated system for power system operational planning and analysis that will be more economical and stable of power system operation. An alias of the integrated system is Highly Integrated Total Energy System(HITES). We first describe the requirements for the Power System Planning System of HTES. Database design is processed in two phases(conceptual design and physical design), and CDM(Conceptual Data Model) and PDM(Physical Data Model) are generated by Powerdesigner(CASE tool for database design). In the future, the constructed database needs to be tested and tuning.

  • PDF

An Integrated System of Process Planning/Scheduling for Minimizing Makespan (Makespan 최소화를 위한 공정계획/일정계획 통합 시스템)

  • Kim, Ki-Dong
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.139-148
    • /
    • 1998
  • Traditionally, the problems of manufacturing technology and manufacturing management have been treated independently. In this research, we endeavor to integrate the process planning and scheduling activities as an attempt to integrate the two realms. To draw up a plan of process planning and scheduling in real manufacturing environment is not an easy task because available time to plan could be limited and the shop status could change frequently. So we propose an architecture of integrated process planing and scheduling problem within the allowed time even if sheep situations change rather frequently. We argue that we can obtain a better and practical scheduling solution by dynamically changing the processing machines and operations as the shop condition changes. The proposed system takes the initial information for alternative machines and operations represented by an AND/OR graph as its input. Other informational inputs to the system are part order and shop statues. The system then generates new process plan and schedules during permitted time. Experimental results show that the proposed scheme provides a viable solution for real world scheduling problems.

  • PDF

Integrated Optimization of Combined Generation and Transmission Expansion Planning Considering Bus Voltage Limits

  • Kim, Hyoungtae;Kim, Wook
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1202-1209
    • /
    • 2014
  • A novel integrated optimization method is proposed to combine both generation and transmission line expansion problem considering bus voltage limit. Most of the existing researches on the combined generation and transmission expansion planning cannot consider bus voltages and reactive power flow limits because they are mostly based on the DC power flow model. In this paper the AC power flow model and nonlinear constraints related to reactive power are simplified and modified to improve the computation time and convergence. The proposed method has been successfully applied to Garver's six-bus system which is one of the most frequently used small scale sample systems to verify the transmission expansion method.

QUANTITATIVE ANALYSES USING 4D MODELS - AN EXPLORATIVE STUDY

  • Rogier Jongeling;Jonghoon Kim;Claudio Mourgues;Martin Fischer;Thomas Olofsson
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.830-835
    • /
    • 2005
  • 4D models help construction planners to develop and evaluate construction plans. However, current analyses using 4D models are mainly visual and limit the quantitative comparison of construction alternatives. This paper explores the usefulness of extracting quantitative information from 4D models to support time-space analyses. We use two 4D models of an industry test case to illustrate how to analyze 4D content quantitatively (i.e., work space areas and distances between concurrent activities). This paper shows how these two types of 4D content can be extracted from 4D models to support 4D-based-analysis and novel presentation of construction planning information. We suggest further research to formalize the content of 4D models to enable comparative quantitative analyses of construction planning alternatives. Formalized 4D content will enable the development of reasoning mechanisms that automate 4D-model-based analyses and provide the information content for informative presentations of construction planning information.

  • PDF

Stochastic Integrated Generation and Transmission Planning Incorporating Electric Vehicle Deployment

  • Moon, Guk-Hyun;Kong, Seong-Bae;Joo, Sung-Kwan;Ryu, Heon-Su;Kim, Tae-Hoon
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.1
    • /
    • pp.1-10
    • /
    • 2013
  • The power industry is currently facing many challenges, due to the new environment created by the introduction of smart grid technologies. In particular, the large-scale deployment of electric vehicles (EVs) may have a significant impact on demand for electricity and, thereby, influence generation and transmission system planning. However, it is difficult to deal with uncertainties in EV charging loads using deterministic planning methods. This paper presents a two-stage stochastic decomposition method with Latin-hyper rectangle sampling (LHRS) to solve the integrated generation and transmission planning problem incorporating EV deployment. The probabilistic distribution of EV charging loads is estimated by Latin-hyper rectangle sampling (LHRS) to enhance the computational performance of the proposed method. Numerical results are presented to show the effectiveness of the proposed method.