• Title/Summary/Keyword: Integrated Construction

Search Result 1,685, Processing Time 0.023 seconds

A Study of IDEF Modelling on the Construction Project (건설사업에 IDEF 모형화에 관한 연구)

  • Kwon, Oh-Ryong;Yuem, Jun-Koun
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.117-124
    • /
    • 1997
  • This paper presents the results of analysis for the Flexible Computer Integrated construction(FCIC) system to adapt CALS on the construction industry. Acquisition and supply process of the system are represented by IDEFO function models and FCIC information systems are briefly described in this paper. The model presented here can be used as a reference for the development of CALS system.

  • PDF

A Comprehensive Development of Urban Greenery Morphs - The Analysis of Greenery Construction of the Middle Ring Line (Puxi section) of Shanghai-

  • Zhongzhai Wang;Wei Zhuang
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.140-146
    • /
    • 2004
  • All-round development of urban greenery network morphology is an integrated part of urban space system. The greenbelt construction of the Middle Ring Line is capable of changing linear planning and merging the peripheral greenery construction with 3-D space design to jointly form a broad open space.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction (원전 건설공사를 위한 공급망관리체계 적용방안에 대한 기초연구)

  • Park, Hang-Soon;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.229-231
    • /
    • 2012
  • The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.

  • PDF

Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction (철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출)

  • Ryu Si-Wook;Ahn Byung-Jun;Ryu Myung-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

Behavior of Lateral Earth Pressure around the Underpass Constructed by the STS Construction Method

  • Jin, Kyu-Nam;Kim, Hyo-Jin;Sim, Young-Jong
    • Land and Housing Review
    • /
    • v.7 no.4
    • /
    • pp.271-279
    • /
    • 2016
  • Recently developed trenchless construction methods ensure stability for the ground settlement by inserting steel pipes along the underpass section and integrating steel pipes before ground excavation to form pipe-roof. This study is to confirm the reinforcing effect of pipe-roof by measuring lateral earth pressure acting on the underpass constructed by the STS (Steel Tube Slab) construction method. For this purpose, lateral earth pressure was measured at the left and right side of the pipe-roof after installing earth pressure cells. As a result, lateral earth pressure was measured with considerable reduction because the integrated pipe-roof shared surcharge. Therefore, economic design for the underpass could be expected by sharing design load by pipe-roof. In addition, construction cost was analyzed according to the design-load sharing ratio by pipe-roof. As pipe-roof shares design load by 40%, the total construction cost can decrease by almost 10% in the case of four-lane underpass.

Exploratory Study on BIM-based Information Breakdown Structure for Construction Document Management

  • Lee, Dong Gun;Cha, Hee Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.32-39
    • /
    • 2015
  • Construction industry is an aggregate of information that diverse information is integrated and controlled. To implement successful construction projects, it can be said that the information management is very important. In particular, because information of construction sites is controlled in a form of documents, importance of the document management in construction has been increased. But, by controlling information through documents, there are difficult problems in writing and classification of the documents and preservation and utilization of the information. Also, due to incompletion of the information management system, difficulty in systematic info management arises. For this reason, this study intends to suggest the document information breakdown structure for controlling document info efficiently which is generated at construction sites. For this, through the examination of preceding studies, establishment of the concept of the document info breakdown structure, the space breakdown structure, and the info breakdown structure, availability of document information is intended to heighten.

Evaluation of Field Application of PC Integrated Polypropylene Waterproof Sheet (PC일체형 폴리프로필렌 방수시트 공법의 현장적용성 평가)

  • Kim, Dae-Kyu;Yun, Jong-Gu;Sin, Hong-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.6-7
    • /
    • 2019
  • In order to solve problems such as scattered dust, dust and chemicals harmful to the human body, workability in a confined space, quality performance, and the like generated during the field construction of the conventional waterproof sheet construction method, a waterproof sheet is used as a PC formwork, Which is produced by pouring concrete after PC installation, and evaluating the applicability of the development method in comparison with the construction method of polypropylene waterproof sheet construction method and the construction period, safety, quality, construction cost.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.