• Title/Summary/Keyword: Integrated Construction

Search Result 1,683, Processing Time 0.031 seconds

Experimental Study for Development of the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bar (PS 강봉으로 일체화된 강합성 라멘교의 개발을 위한 실험연구)

  • Ahn, Young-Soo;Chung, Jee-Seung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.50-61
    • /
    • 2012
  • In recent years, various research and developments to introduce composite bridges of new concept have been performed. The types of integral bridge and portal rigid frame bridge are having advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection has problems such as complexity of construction and increase of the construction cost. A new type of bridge, called prestress integral composite girder(PIC girder) bridge, is proposed in this study, which decreases the cost of construction and improves the efficiency of construction by simplifying the detail of construction for girder-abutment connection. PIC girder bridge has the connection detail in which the steel girder and the abutment are integrated by using the PS bar installed in the connection. In this study, finite element analysis and mock-up load test are conducted to evaluate the propriety of design, the effective of fabrication and structural safety for PIC girder bridge. The adequacy of the PIC giredr bridge is verified by the results of static/dynamic load test and finite element analyses.

Development of Integrated Work Breakdown Structure for Project Management Information System in Multi-Family House Projects (공동주택 건축공사의 효율적인 PMIS 운용을 위한 통합WBS 개발)

  • Park, Ji-Hyun;Shin, Joo-Yong;Kim, Hae-Gon;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.801-804
    • /
    • 2007
  • Development of construction project management information system is accelerated because information management system has become more important by recent complicated and large-sized construction industry. There are many problems to operate PMIS efficiently because no standardized WBS exist in current. This study has identified the problems of WBS in building construction of multi-family house projects with 4 public and private organizations by interviews and compared each WBS. From those facts, this research presents the integrated WBS and the improved application form in PMIS.

  • PDF

Accuracy Analysis of Earthwork Volume Estimating for Photogrammetry, TLS, MMS (토공사 계측 방식(Photogrammetry, TLS, MMS)별 토공량 산정 정밀도 분석)

  • Park, Jae-Woo;Yeom, Dong-Jun;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.4_2
    • /
    • pp.453-465
    • /
    • 2021
  • Recently, photogrammetry, TLS(Terrestrial Laser Scanner), MMS(Mobile Mapping System)-based techniques have been applied to estimate earthwork volume for construction management. The primary objective of this study is to analyze the accuracy of earthwork volume estimating between photogrammetry and TLS, MMS that improves the traditional surveying method in convenience, estimating accuracy. For this, the following research works are conducted sequentially; 1) literature review, 2) core algorithm analysis, 3) surveying data acquisition using photogrammetry, TLS, MMS, 4) estimated earthwork volume comparison according to surveying method. As a result of the experiment, it was analyzed that there were earthwork volume errors of 1,207.5m3 (14.03%) of UAV-based digital map, 391.5m3(4.55%) of UAV, TLS integrated digital map, and 294.9m3(3.43%) of UAV, MMS integrated digital map. It is expected that the result of this study will be enormous due to the availability of the analyzed data.

Exploring Integrated Design Strategies for the Optimal Use of BIM

  • Park, Hyoung-June;Lee, Ji-Hyun
    • Architectural research
    • /
    • v.12 no.2
    • /
    • pp.9-14
    • /
    • 2010
  • This paper introduces an experimental design studio that explores the optimal use of current digital technologies in order to employ Building Information Modeling at the early phase of design process. Based upon the outcomes from the aforementioned studio, the paper discusses the integrated design strategies for BIM in the design process. In this paper, BIM is proposed as a design tool that increases an overal design productivity more effectively and efficiently compared to BIM as a construction tool with encouraging a design communication among different partakers in the design process.

Political consideration issues for the exclusive possession protection and localization of TETRA system in Korea (TETRA시스템의 국산화율 제고를 위한 정책적 접근방안)

  • Moon, Hun-Il;Hong, Wan-Pyo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.3 no.4
    • /
    • pp.221-227
    • /
    • 2008
  • The integrated command radio network construction with the business which differs makes the business of the regional BCP responsible agencies which are being scattered and the emergency rescue agencies control effectively. The namely specific authorizations are quick, the decision-making and the solar radiation which are accurate the possibility the rescue work which is disordered becoming accomplished in order to be, integrated command network construction are demanded from misfortune site. Foe the maintenance and an efficient management of the function which is case different meaning permanent and continuous will construct the integrated command network the upgrade which system is continuous necessary, becomes.

  • PDF

ENHANCING UTILIZATION OF BUILDINGS THROUGH INTEGRATED ANALYSIS OF SPACE, USER, AND USER ACTIVITY

  • Tae Wan Kim;Martin Fischer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.570-575
    • /
    • 2013
  • Enhancing utilization of buildings is gaining in importance in response to a challenging economy; thus, there is a need for a method that analyzes space, user, and user activity in an integrated way to provide project stakeholders with utilization information to support their decision-making about buildings. Conventional methods, such as architectural programming and post-occupancy evaluation, lack a formal relationship between user activity and other information, and therefore, are coarse-grained. This relationship has been formalized by two relatively new methods that provide fine-grained utilization information: workplace planning and space-use analysis. We characterize these two methods with focuses on their usage in different phases (i.e., planning, design, occupancy), required information that needs to be gathered, and the achievement and limitations in terms of three criteria, i.e., consistency, efficiency, and transparency. This characterization would not only help project stakeholders select and use a method that best meets their purposes for enhancing utilization of their buildings, but also provide researchers with promising research topics regarding enhancing utilization of buildings.

  • PDF

Application of Construction Management techniques in Small Construction Projects (소규모 프로젝트의 효율적인 공사관리방안)

  • Lee, Sang-Beom;Lee, Dong-Un
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.95-102
    • /
    • 2003
  • A construction project's period is limited by the order manufacture. And a construction project is requested a specific place, and has the characteristic to be irregular. Today, construction is to be representative high-cost and low-efficiency. This kind of problems appears in small construction projects more often than large construction projects. According to this facts, we recognized necessity of making practical application in methods of construction management. Also, we suggest application and establishment of integrated responsibility management department, PMIS(Project Management Information System) and Data Base. From now on, methods of construction management could be good opportunities for small construction projects and local construction companies. Therefore, small and local construction companies should try to improve their abilities. Likewise, the countries systematize to constitute the relation laws.

An Exploratory Analysis of IT Implementation: A Case Study of Construction Companies (건설기업 정보화 추진 방안: 대형 건설사 사례를 중심으로)

  • Han, Jeong-Sook;Kim, Young-Shin;Lee, Seung-Chan
    • Information Systems Review
    • /
    • v.6 no.2
    • /
    • pp.209-225
    • /
    • 2004
  • This study shows the field of construction which was less developed in the aspect of information system in comparison to other areas needs to introduce construction information system and suggests it can make more value linked with company performance through the system. For the first step, it emphasizes the integrated enterprise approach not optimization of each sector in a company. This paper extracts the current issues of construction information from the core process of construction area and implies a driving plan and the future development plan for construction information. Antecedent studies for this drew the information structure model and the construction information-driving model of a construction company. Hence, case studies with management companies that implemented the construction information system successfully tested validity. This research brings the cases of PMS, the integrated finance system, and CRM system as successful ones.

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

A study of IDEF modelling on the construction project (건설사업에 IDEF 모형화에 관한 연구)

  • 권오룡;염준근
    • Proceedings of the CALSEC Conference
    • /
    • 1997.11a
    • /
    • pp.269-286
    • /
    • 1997
  • This paper presents the results of analysis for the Flexible Computer Integrated construction(FCIC) system to adapt CALS on the construction industry- Acquisition and supply process of the system are represented by IDEF0 function models and FCIC information systems are briefly described in this paper. The model presented here used as a reference for the development of CALS system.

  • PDF