• Title/Summary/Keyword: Installation site

Search Result 652, Processing Time 0.04 seconds

A Study on the Detecting Method of Intercept Violation Vehicles Using an Image Detection Techniques (영상검지기법을 활용한 끼어들기 위반차량 검지 방법에 관한 연구)

  • Kim, Wan-Ki;Ryu, Boo-Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.6
    • /
    • pp.164-170
    • /
    • 2008
  • This research was verified detection way of intercept vehicles and performance evaluation after system installation using image detector as detection way of ground installation. By image recognition algorithm was on the trace of moving orbit of violation vehicles for detection way of intercept vehicles. When moving orbit is located special site, utilized geometric image calibration and DC-notch filter. These are cognitive system of license plate by making signal. Then, Bright Evidence Detection and Dark Evidence Detection were applied to after mixing. It is applied to way of Backward tracking for detection way of intercept vehicles. After the field evaluation of developed system, it should be analyzed the more high than recognition rate of minimum standards 80%. It should rise in the estimation of the site applicability is highly from now.

On site monitoring during nearby drilling operations toward a geothermal power system installation

  • Bortoluzzi, Daniele;Casciati, Sara;Faravelli, Lucia;Francolini, Matteo
    • Smart Structures and Systems
    • /
    • v.30 no.3
    • /
    • pp.317-325
    • /
    • 2022
  • Among the approaches to the production of "green" energy, geothermal power systems are becoming quite popular in Europe. Their installation in existing buildings requires an extended, external pipes appendix and its laying operation needs a drilling activities nearby structural skeletons often designed to support static loads only, especially when ancient buildings are targeted. This contribution reports and discusses the experimental results achieved within a specific case study within the European project GEOFIT. In particular, standard accelerometric measurements in and nearby a single-story reinforced concrete building are collected and analysed in the absence of drilling (pre-drilling) and during drilling activities (drilling phase) to monitor the structure response to the external source of vibrations related to the excavations phase. The target is to outline automatic guidelines toward installations preventing from any sort of structural damage.

Development of Inundation Flooding Simulation Program for Selecting Optimum Installation Site for Rainwater Infiltration Detention Block (빗물침투저류블록의 설치 최적지 선정을 위한 침수범람 시뮬레이션 프로그램의 개발)

  • Kim, Seongpyo;Lee, Taegyo;Ryu, Jungrim;Park seonmee;Choi, Heeyong;Choi, Hyeonggil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.129-130
    • /
    • 2023
  • This study proposes rainwater infiltration retention blocks as a solution to the flooding problems caused by recent climate change and developed a flood prediction simulation program to select the optimal site for installing rainwater infiltration retention blocks that can minimize damage from floods. By applying the existing 2D flood analysis model G2D and adding a reservoir function, the volume of water before and after installation can be determined through simulation results.

  • PDF

An Analysis of Influence Factors on Insitu-production and Installation Schedule of Composite Precast Concrete Members (합성 PC 부재의 현장생산 및 설치 공정계획의 영향요소 분석)

  • Lim, Chaeyeon;Kim, Sun Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.176-177
    • /
    • 2013
  • The composite PC rahmen structure, called Green Frame, allows the main structural members such as PC column and beam to be produced on the site, resulting in a reduction of PC member transportation cost and the margin of PC plant (operation cost and profit), making it more economic than the bearing wall structure. To apply the Green Frame to practice, not only installation but also insitu-production process should be considered. Therefore, this study analyse the influence factors on insitu-production and installation schedule of composite precast concrete members. The results shall be used as basic criteria on the planning of insitu-production and installation of Green Frame.

  • PDF

EMTDC Model Development for Control & Protection Analysis of Co-Generation System based on On-site Characteristic Tests (현장 측정에 근거한 열병합 발전 시스템의 제어, 보호 해석용 EMTDC 모델 수립)

  • Kim, Hak-Man;Shin, Myong-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.5
    • /
    • pp.85-91
    • /
    • 2006
  • Co-generation systems have been spreading rapidly over the past 10 years in Korea and most of these systems are interconnected with electric power systems. However, better control and protection models are still needed for analysis of these systems to ensure stable operation with the grid. This paper proposes improved EMTDC models for control fad protection analysis of grid-connected co-generation systems. Through on-site characteristic testing, the models were developed and the model parameters were determined. The models were applied to a field co-generation system, and analysis of control and protection was performed showing a good match to the simulation results.

Study on the Treatment, Utilization and Control of the Acid Mine Drainage for Colliery - An on-site test on the Applicability of a Korean-type Prototype for Mine Drainage Purification- (석탄광의 산성갱내배수 처리.이용.제어에 관한 연구 -한국형 특수갱배수 정화장치 시작품 현지적용실험-)

  • 이춘택
    • Journal of the Korean Professional Engineers Association
    • /
    • v.19 no.4
    • /
    • pp.11-21
    • /
    • 1986
  • Mine drainage from coal mines is mostly acidic, polluted and/or contaminated, even if its quantity has increased substantially during recent days. This causes two kinds of problems arising at mining districts; one is the environmental disruption and the other is insufficient water supply for living, employee's bathing and industrial purposes. In order to mitigate the aforementioned problems, a specific equipment of Korea type for mine drainage purification has been developed and its prototype manufactured, followed by its applicability tests implemented at mine site. The results of the tests indicates that the new equipment developed is much lower than and economical compared to, other existing neutralization facilities at home and abroad in capital investment at installation stage, the consumption of neutralizing chemicals at operation stage and the requirements of installation site. Whangji area where the prototype water treatment equipment is installed has been sustaining a short supply of usable water, especially in dry seasons and supplementing about 40㎥ of water brought from a location farther than 4km in distance to meet water requirements. The prototype water treatment equipment is however considered capable of providing compressor cooling water in sufficient amount from winter season In the future.

  • PDF

A Study on Optimal Site Selection for the Artificial Recharge System Installation Using TOPSIS Algorithm

  • Lee, Jae One;Seo, Minho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.34 no.2
    • /
    • pp.161-169
    • /
    • 2016
  • This paper is intended to propose a novel approach to select an optimal site for a small-scaled artificial recharge system installation using TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) with geospatial data. TOPSIS is a MCDM (Multi-Criteria Decision Making) method to choose the preferred one of derived alternatives by calculating the relative closeness to an ideal solution. For applying TOPSIS, in the first, the topographic shape representing optimal recovery efficiency is defined based on a hydraulic model experiment, and then an appropriate surface slope is determined for the security of a self-purification capability with DEM (Digital Elevation Model). In the second phase, the candidate areas are extracted from an alluvial map through a morphology operation, because local alluvium with a lengthy and narrow shape could be satisfied with a primary condition for the optimal site. Thirdly, a shape file over all candidate areas was generated and criteria and their values were assigned according to hydrogeologic attributes. Finally, TOPSIS algorithm was applied to a shape file to place the order preference of candidate sites.

Measurements and Modeling of Neutral Harmonic Currents on the Education Office Building (교육용 건물의 중성선 고조파 전류 측정 및 모델링)

  • 김경철;강윤모;이일무
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • With the proliferation of nonlinear loads such as personal computers in an educational office building, high neutral harmonic currents have been observed. High neutral currents in three-phase four-wire distribution power systems can cause overloaded neutral conductors, overloaded transformers, voltage distortion, common mode noise, and malfuntion of protective equipment. On-site measurements of harmonic currents and voltages were made and the corresponding equivalent circuits was developed. The circuit model under study was simulated numerically and graphically through the use of the software MATLAB.

  • PDF

A Study on the Power Saving Fraction of Site Electrical Load depending on the installation area of PV system in Apartment Complex (공동주택 단지 배치유형별 PV시스템 최적 설치면적 및 전기부하 기여율 평가 연구)

  • Yoon, Jong-Ho;Park, Jae-Sung;Shin, U-Cheul
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.3
    • /
    • pp.60-66
    • /
    • 2008
  • This study is to investigate an optimal size and position of PV system for apartment complex through the electrical load matching analysis. The 4 types of arrangements of apartment buildings are considered as follows; ㅡtype, alternative ㅡtype, ㄱtype and ㅁtype. We assume that the studied site is composed of 9 buildings. Firstly, solar access evaluation of roof and facade in apartment buildings was performed with the hourly simulations of total received insolation on each surface considering the shading effect of buildings. Electrical load profile of typical Korean apartments were investigated for the load matching analysis. To calculate an annual total PV output, we used MERIT program which is a hourly based load matching tool developed by ESRD. TRY weather data of Daejeon are applied for this analysis. Result shows that approximately 11% of total electric load of the site can be supplied by the PV system in the case of full installation of PV system at the whole south-face roof area of 9 buildings in this stuided apartment complex. Depending on a various installation option of roof and facade area, the possible ratio of PV supply in total electrical load varies from 9% to 42%. Among the 4 arrangement types, the ㅡtype revealed the best option for the maximum output of PV system.

An Efficient Method for Selecting DVOR Installation Site (효율적인 DVOR 설치위치 선정기법)

  • Park, Hyeong-Taek;Hwang, Byong-Won
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.3A
    • /
    • pp.319-326
    • /
    • 2008
  • All over the world more than 2,000 VORs(VHF Omni-directional Ranges) including 39 in Korea are being operated for formulating air routes. But VOR reveals some difficulties in cost and time when relocating already an installed one due to its poor performance from the interference by its geometrically surrounding obstacles. DVOR(Doppler VOR) which is more popular than CVOR(Conventional VOR) has huge antennas and make it very difficult to assume a sufficient number of proper site candidates for permanent installation. This paper develops an efficient method for predicting proper site of DVOR installation by isolating transmitter from sideband antennas and counterpoise, making the transmitter easily moveable and verifying the performance of DVOR only with a transmitter and an antenna. The method was tested with a real flight measurement for DVOR performance around Gwangju Airport in Korea.