• 제목/요약/키워드: Installation site

검색결과 652건 처리시간 0.027초

적층식 모듈러 공동주택 현장설치 단계의 생산성 분석 (Productivity Analysis of the Site Installation Stage of Laminated Modular Multi-Family Housing)

  • 박문선;김석
    • 한국산업융합학회 논문집
    • /
    • 제22권5호
    • /
    • pp.519-527
    • /
    • 2019
  • This study was conducted to present useful information on the utilization and productivity analysis of laminated modular multi-family housing. To this end, the process of site installation was investigated and analyzed through a prior study, and the monitoring survey was conducted through the site installation case of an stacked multi-family housing. Based on the above, the results of productivity analysis using the web-cyclone technique were also presented. However, the site installation process has limitations on generalisation because the process is not the same for each construction company, and also limits that require verification through application in the actual site of the web-cyclone model presented in this study.

이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획 (KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site)

  • 송인호;오종석
    • 전력전자학회논문지
    • /
    • 제27권5호
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

IEC 60364 기반의 한국형 저압전기설비 통합 실증단지 모델링 및 차단기와 케이블의 선정 방안 고찰 (Study of Selection Plan of Circuit breakers, Cables and Modeling of Korean Low Voltage Electrical Installation integration Test Site based on IEC 60364)

  • 김두웅;류규상;김한수;신대성;류기환;김철환
    • 조명전기설비학회논문지
    • /
    • 제29권9호
    • /
    • pp.59-64
    • /
    • 2015
  • IEC is an international standards which are used in many countries with Europe as the center. IEC standard is introduced in Korea according to WTO/TBT agreements, however until now there are no buildings in Korea which are designed applying IEC standard. Therefore, KEA(Korea Electric Association) is scheduled to construct Korean low voltage electrical installation integration test site which is designed applying IEC standard. In this paper, before being under construction of Korean low voltage electrical installation integration test site, power substation is modeled based on real design parameters and method to select circuit breakers and cables is presented applying IEC standard in the modeled power substation. EMTP(ElctroMagnetic Transient Program) is used for simulation program. EMTP which is power system analysis program is easy to model power system and power substation.

케이슨식 교량기초 제작 및 거치 시공사례 -울산 신항 방파제현장 시공 사례를 중심으로- (A Case Study of Caisson Typed Bridge-Foundation Fabrication and Installation in Ul-san Newport Breakwater Project)

  • 장병수;신성권;김덕호
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2004년도 학술대회지
    • /
    • pp.45-50
    • /
    • 2004
  • The method of caisson typed bridge-foundation fabrication and installation applied in Ul-san newport breakwater project is throughly carried out to compact QRR mound vibro-hammer step by step to minimize settlement through stability check. Floating Dock was mobilized for caisson fabrication due to limited site area. fabricated caisson on the Floating Dock was towed to the deeper area of 8m water depth to be launched, and Floating Crane assisted launching and installation work of the caisson. finally water filling was done followed by surveying work to permanent installation.

  • PDF

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제9권1호
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.

해저케이블 비용 모델을 이용한 HVAC 해상변전소 적정 위치 선정에 관한 연구 (A Study on Siting of HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model)

  • 원종남;문원식;허재선;김재철
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.451-456
    • /
    • 2013
  • Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.

수치표면모형 기반의 방음벽일체형 태양광 시스템 설치 적지분석 (Digital Surface Model based Proper Installation Site Analysis for Soundproof Wall Integrated Phtovoltaic System)

  • 윤준희
    • 한국산학기술학회논문지
    • /
    • 제21권3호
    • /
    • pp.556-563
    • /
    • 2020
  • 대부분의 건물일체형 태양광 발전 시스템(BIPVS; Building Integrated Photovoltaic System)은 건물의 옥상이나 벽면에 설치된다. 따라서 BIVPS의 설치 위치 선정 시 고려해야할 가장 중요한 요소는 주변 건물에 의한 그림자 영향이다. 그러나 지면 위에 있는 방음벽에 태양광 시스템을 설치할 경우, 그림자는 주변 건물은 물론 가로수에 의해서도 생성된다. 따라서 방음벽 일체형 태양광 발전 시스템(SIPVS; Soundproof wall Integrated Photovoltaic System)의 설치 적합지를 선정하기 위해서는 BIPVS의 경우와 다른 데이터 모델 및 알고리즘이 필요하다. 본 논문에서는 수치표면모형 기반의 방음벽 일체형 태양광 시스템의 설치 적지 분석을 다룬다. 첫째, 설치 후보지(태양광 패널)의 연간 태양 입사각과 고도각을 계산한다. 둘째, 설치 후보지의 시간대 별 그림자 생성 여부를 수치표면모형을 이용하여 결정한다. 셋째, 그림자가 생성되지 않은 시간대의 태양 입사각을 이용하여 일사량을 계산한다. 일사량의 연간 누적 비교를 통하여 일사량이 충분한 곳을 SIPVS의 설치 적합지로 결정할 수 있다. 제안된 알고리즘은 시작품 형태로 구현(Java Program)되었다. 실험 결과, 총 아홉 곳의 후보지에 대한 설치 적합도의 순서를 결정할 수 있었다. 제안된 알고리즘은 건물의 낮은 위치에 설치할 BIPVS의 적정 설치위치 및 기대 전력 생산량의 계산에도 활용될 수 있을 것이다.

공사장 방음시설 설치기준 개선방안에 관한 연구 (A study on the improvement for installation guide of soundproofing facilities in construction site)

  • 박영민;김경민
    • 환경영향평가
    • /
    • 제22권4호
    • /
    • pp.361-367
    • /
    • 2013
  • Noise and vibration occurs during construction intermittently, but with the most arise complaints. There is a need to efficiently manage the construction noise and vibration problems because in case a residential facility that requires calmness around the construction site adversely affects the living conditions of nearby residents. The ministry of environment has mandating the installation of soundproofing facilities for the management of construction noise. In order to enforce a particular construction, the mandatory install with soundproofing facilities before the start of construction, and after construction. However, Installation guide of soundproofing facilities for construction sites were not considered affected areas by noise and there is no provision of performance evaluation for soundproofing facilities. In this study, investigated the status and problems of the installation guide for soundproofing facilities in construction sites, we propose an efficient installation guide of soundproofing facilities for the reduction construction noise.

토공현장 적용성 검증을 위한 MMS 정밀도 분석 (MMS Accuracy Analysis for Earthwork Site Application)

  • 박재우;김석
    • 한국산업융합학회 논문집
    • /
    • 제22권2호
    • /
    • pp.183-189
    • /
    • 2019
  • Researches utilizing the fourth industrial revolution technology are being conducted as a breakthrough for improving the earthworker productivity. In order to make the earthwork site smarter, it is necessary to digitize the construction site topography at first. For this purpose, photogrammetry using drones and LiDAR on MMS have been recently used. The purpose of this study is to analyze the accuracy of LiDAR by installation angles for verifying the application of MMS in the construction site. As a result of comparing the coordinates measured by the total station and the LiDAR, a small error of about 1-2 centimeters was shown. It is confirmed that MMS could be well applied to the earthwork site. In addition, there was no significant difference in the accuracy of the acquired coordinates according to the installation angle of the LiDAR, but the shape of the point clouds was different. The larger the installation angle, the better the shape of the site terrain is measured.

멀티사이트 기반 클라우드 환경의 구성 자동화를 위한 SmartX 프로비저닝 프레임워크 (SmartX Provisioning Framework for Automated Installation/Configuration of Multi-site based Cloud Infrastructure)

  • 신준식;김종원
    • 정보과학회 컴퓨팅의 실제 논문지
    • /
    • 제22권11호
    • /
    • pp.547-558
    • /
    • 2016
  • 다양한 ICT 인프라 기술들을 종합적으로 활용하는 클라우드의 대표적인 오픈소스 프로젝트인 오픈스택을 활용하여 멀티사이트 기반의 클라우드 인프라 구축 시 설치 복잡성 및 지리적인 제약으로 인한 인적, 시간적인 비효율성을 내포한다. 이러한 비효율성을 해소하기 위해 멀티사이트 환경의 오픈스택 실증 테스트베드인 OF@KOREN SmartX 놀이터 (Playground)를 대상으로 리눅스 및 오픈스택을 설치/설정을 자동화하는 도구를 데브옵스 (DevOps) 개발 방법론에 따라 점진적으로 개발해왔다. 하지만 이전 개발도구들이 고정된 형태의 프로비저닝만을 제공한다는 한계를 해결하고자 본 논문에서는 소프트웨어 정의 인프라의 자원관리 구도에 따라 자동 설치/설정도구를 엮어 Playground 수준의 프로비저닝을 수행하는 SmartX 프로비저닝 프레임워크의 프로토타입을 설계, 개발한다. 그리고 멀티사이트 오픈스택 클라우드를 자동으로 구축하는 과정을 제시함으로써 프레임워크의 효율적인 놀이터 프로비저닝 기능에 대해 검증한다.