• Title/Summary/Keyword: Installation site

Search Result 651, Processing Time 0.033 seconds

Productivity Analysis of the Site Installation Stage of Laminated Modular Multi-Family Housing (적층식 모듈러 공동주택 현장설치 단계의 생산성 분석)

  • Park, Moon-Sun;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.519-527
    • /
    • 2019
  • This study was conducted to present useful information on the utilization and productivity analysis of laminated modular multi-family housing. To this end, the process of site installation was investigated and analyzed through a prior study, and the monitoring survey was conducted through the site installation case of an stacked multi-family housing. Based on the above, the results of productivity analysis using the web-cyclone technique were also presented. However, the site installation process has limitations on generalisation because the process is not the same for each construction company, and also limits that require verification through application in the actual site of the web-cyclone model presented in this study.

KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site (이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획)

  • Song, Inho;Oh, Jong-Seok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

Study of Selection Plan of Circuit breakers, Cables and Modeling of Korean Low Voltage Electrical Installation integration Test Site based on IEC 60364 (IEC 60364 기반의 한국형 저압전기설비 통합 실증단지 모델링 및 차단기와 케이블의 선정 방안 고찰)

  • Kim, Doo-Ung;Ryu, Kyu-Sang;Kim, Han-Soo;Shin, Dae-Sung;Ryu, Ki-Hwan;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.9
    • /
    • pp.59-64
    • /
    • 2015
  • IEC is an international standards which are used in many countries with Europe as the center. IEC standard is introduced in Korea according to WTO/TBT agreements, however until now there are no buildings in Korea which are designed applying IEC standard. Therefore, KEA(Korea Electric Association) is scheduled to construct Korean low voltage electrical installation integration test site which is designed applying IEC standard. In this paper, before being under construction of Korean low voltage electrical installation integration test site, power substation is modeled based on real design parameters and method to select circuit breakers and cables is presented applying IEC standard in the modeled power substation. EMTP(ElctroMagnetic Transient Program) is used for simulation program. EMTP which is power system analysis program is easy to model power system and power substation.

A Case Study of Caisson Typed Bridge-Foundation Fabrication and Installation in Ul-san Newport Breakwater Project (케이슨식 교량기초 제작 및 거치 시공사례 -울산 신항 방파제현장 시공 사례를 중심으로-)

  • JANG BYUNG-SOO;SIN SUNG-GWEN;KIM DUCK-HO
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.45-50
    • /
    • 2004
  • The method of caisson typed bridge-foundation fabrication and installation applied in Ul-san newport breakwater project is throughly carried out to compact QRR mound vibro-hammer step by step to minimize settlement through stability check. Floating Dock was mobilized for caisson fabrication due to limited site area. fabricated caisson on the Floating Dock was towed to the deeper area of 8m water depth to be launched, and Floating Crane assisted launching and installation work of the caisson. finally water filling was done followed by surveying work to permanent installation.

  • PDF

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.1
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.

A Study on Siting of HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model (해저케이블 비용 모델을 이용한 HVAC 해상변전소 적정 위치 선정에 관한 연구)

  • Won, Jong-Nam;Moon, Won-Sik;Huh, Jae-Sun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.451-456
    • /
    • 2013
  • Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.

Digital Surface Model based Proper Installation Site Analysis for Soundproof Wall Integrated Phtovoltaic System (수치표면모형 기반의 방음벽일체형 태양광 시스템 설치 적지분석)

  • Youn, Junhee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.556-563
    • /
    • 2020
  • Most of a BIPVS (Building Integrated Photovoltaic System) is installed on the rooftop or wall of a building. Therefore, the main factor to consider for selecting the installation site is the shadow effects produced by the surrounding buildings. On the other hand, when the photovoltaic was installed on soundproof walls, shadow effects were produced by not only surrounding buildings but also the surrounding trees. Therefore, a different data model and algorithm with the BIPVS case are essential for proper installation sites selection of a SIPVS (Soundproof wall Integrated Photovoltaic System). This paper deals with the DSM (Digital Surface Model)-based proper installation site analysis for SIPVS. First, the solar incident and altitude angles of the installation candidate sites (solar panel) during the year were calculated. Second, the shadow effects (shadowed or unshadowed) were determined for the candidate sites at each time with the DSM. Third, the amount of solar radiation was calculated with the incident angle for the candidate sites at an unshadowed period. The proper installation site of the SIPVS could then be selected by comparing the accumulated annual solar radiation for each candidate. The proposed algorithm was implemented as a prototype (Java program). From the experiment, the order of the installation suitability was determined among the nine candidates. The proposed algorithm could be used for proper BIPVS installation site analysis aimed at the lower part of a building and calculation of the expected power production.

A study on the improvement for installation guide of soundproofing facilities in construction site (공사장 방음시설 설치기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.361-367
    • /
    • 2013
  • Noise and vibration occurs during construction intermittently, but with the most arise complaints. There is a need to efficiently manage the construction noise and vibration problems because in case a residential facility that requires calmness around the construction site adversely affects the living conditions of nearby residents. The ministry of environment has mandating the installation of soundproofing facilities for the management of construction noise. In order to enforce a particular construction, the mandatory install with soundproofing facilities before the start of construction, and after construction. However, Installation guide of soundproofing facilities for construction sites were not considered affected areas by noise and there is no provision of performance evaluation for soundproofing facilities. In this study, investigated the status and problems of the installation guide for soundproofing facilities in construction sites, we propose an efficient installation guide of soundproofing facilities for the reduction construction noise.

MMS Accuracy Analysis for Earthwork Site Application (토공현장 적용성 검증을 위한 MMS 정밀도 분석)

  • Park, Jae-woo;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.2
    • /
    • pp.183-189
    • /
    • 2019
  • Researches utilizing the fourth industrial revolution technology are being conducted as a breakthrough for improving the earthworker productivity. In order to make the earthwork site smarter, it is necessary to digitize the construction site topography at first. For this purpose, photogrammetry using drones and LiDAR on MMS have been recently used. The purpose of this study is to analyze the accuracy of LiDAR by installation angles for verifying the application of MMS in the construction site. As a result of comparing the coordinates measured by the total station and the LiDAR, a small error of about 1-2 centimeters was shown. It is confirmed that MMS could be well applied to the earthwork site. In addition, there was no significant difference in the accuracy of the acquired coordinates according to the installation angle of the LiDAR, but the shape of the point clouds was different. The larger the installation angle, the better the shape of the site terrain is measured.

SmartX Provisioning Framework for Automated Installation/Configuration of Multi-site based Cloud Infrastructure (멀티사이트 기반 클라우드 환경의 구성 자동화를 위한 SmartX 프로비저닝 프레임워크)

  • Shin, Jun-Sik;Kim, JongWon
    • KIISE Transactions on Computing Practices
    • /
    • v.22 no.11
    • /
    • pp.547-558
    • /
    • 2016
  • Construction of multi-site Cloud Infrastructure with OpenStack, the most popular cloud open source project with various ICT infrastructure technologies, has operational inefficiency due to installation complexity and geographical limitation. To address this inefficiency, we gradually developed automated installation/configuration tools to automate installation/configuration of Linux and OpenStack by complying with DevOps methodology over a multi-site OpenStack testbed called OF@KOREN SmartX Playground. However, the pre-developed installation tools can be used only for limited cases. Therefore, we designed and developed a prototype of SmartX Provisioning Framework which could conducts Playground-wide provisioning flexibly by following three steps of resource management in Software-defined Infrastructure. We verified the efficiency of the provisioning functionality of the framework by demonstrating an example of automated multi-site cloud construction.