• 제목/요약/키워드: Installation sequence

검색결과 72건 처리시간 0.028초

Determination and application of installation sequence of piping systems in cramped spaces of ships and offshore structures considering geometric relationship of pipe elements

  • Jang, MiSeon;Nam, Jong-Ho
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제12권1호
    • /
    • pp.60-70
    • /
    • 2020
  • The outfitting design of ships and offshore structures is mainly undertaken in a restricted space. Pipes occupying a large portion of outfitting design are normally manufactured outside the shipyard. This complicated manufacturing process results in frequent delivery delays. Inevitable design modifications and material changes have also resulted in inefficient pipe installation works. In this study, an algorithm is proposed to systematically determine the pipe installation sequence. An accurate and fast algorithm to identify the geometric relationship of piping materials is presented. To improve the calculation efficiency, the interference is gradually examined from simplified to complicated shapes. It is demonstrated that the calculation efficiency is significantly improved with successive geometric operations such as back-face culling and use of bounding boxes. After the final installation sequence is determined, the entire installation process is visualized in a virtual reality environment so that the process can be rendered and understood for a full-scale model.

의장재 설치 순서 결정을 위한 알고리즘 개발 연구 (A Study on the Development of Algorithm for Defining the Installation Sequence of Outfitting)

  • 최재호;김지혜;우종훈
    • 대한조선학회논문집
    • /
    • 제54권5호
    • /
    • pp.368-377
    • /
    • 2017
  • Outfittings of offshore plants and high value-added vessels, such as FPSO, drillship, are much more than outfittings of general ships. So the complexity of the outfittings is increased and the importance of outfittings has also increased. But, there is no clear method to define the installation sequence of outfittings, yet. In this study, we developed the algorithm to define the installation sequence of outfittings by applying variables and constraints related to outfitting, such as process parameters, weighting coefficients, installation constraints. Also, we developed the application that applied the algorithm and compared cases by changing the weighting coefficients of process parameters. We verified the practicality of the algorithm by developing the application. The results of this study are that the accuracy of the outfitting planning is improved and efficient lead time can be predicted by defining the installation sequence of outfittings.

SFC로 설계된 공정제어에서 선택시퀀스의 메모리효율향상 (Improvement of Memory Efficiency for Alternative Sequence in Process Control System Described by SFC)

  • 유정봉
    • 조명전기설비학회논문지
    • /
    • 제24권5호
    • /
    • pp.55-61
    • /
    • 2010
  • PLC 제어 시스템은 SFC 언어를 사용하여 설계할 경우, SFC 언어를 사용하면 제어의 흐름을 이해하기 쉽고, 유지보수가 용이하며 프로그램의 기술성이 뛰어나다. SFC 언어는 단일 시퀀스, 선택 시퀀스, 병렬 시퀀스로 나누어지며, 선택 시퀀스로 프로그래밍 하면 단일 시퀀스로 프로그램할 때보다 메모리의 크기가 커져야 한다. 본 논문에서는 선택 시퀀스의 기능을 단일 시퀀스로 구현하여 메모리의 크기를 줄여서 메모리의 효율을 향상시키는 방법을 제시하고, 실례를 통해 타당성을 확인하였다.

345[kV] 주변압기 3차측 영상전압 발생원인 분석 및 대책에 관한 연구 (A Study on the Occurrence Cause of the Zero Sequence Voltage at Tertiary Side of 345[kV] Main Transformer)

  • 우정욱;권동진
    • 조명전기설비학회논문지
    • /
    • 제24권9호
    • /
    • pp.150-158
    • /
    • 2010
  • We had experienced the several system failures which were concerned about zero sequence voltages at the tertiary side of 345[kV] transformers. In this paper, we had considered the zero sequence voltage and its reduction methods at the 345[kV] auto-transformer tertiary. For analysis, we used EMTP(Electro-Magnetic Transients Program). The calculation results by EMTP were compared with the measured data of the field tests. From the calculation and the field tests, we had verified that it is due to pre-saturation characteristics of the potential transformer. So, we had improved its saturation characteristics and applied it at real site. After improvements, we could reduce the zero sequence voltage below the setting level of the relay.

지중송전선로의 대칭분 임피던스 모델링에 관한 연구 (A Study on the Sequence Impedance Modeling of Underground Transmission Systems)

  • 황영록;김경철
    • 조명전기설비학회논문지
    • /
    • 제28권6호
    • /
    • pp.60-67
    • /
    • 2014
  • Power system fault analysis is commonly based on well-known symmetrical component method, which describes power system elements by positive, negative and zero sequence impedance. The majority of fault in transmission lines is unbalanced fault, such as line-to-ground faults, so that both positive and zero sequence impedance is required for fault analysis. When unbalanced fault occurs, zero sequence current flows through earth and ground wires in overhead transmission systems and through cable sheaths and earth in underground transmission systems. Since zero sequence current distribution between cable sheath and earth is dependent on both sheath bondings and grounding configurations, care must be taken to calculate zero sequence impedance of underground cable transmission lines. In this paper, EMTP-based sequence impedance calculation method was described and applied to 345kV cable transmission systems. Calculation results showed that detailed circuit analysis is desirable to avoid possible errors of sequence impedance calculation resulted from various configuration of cable sheath bonding and grounding in underground cable transmission systems.

배전계통에서 유전적 알고리즘을 이용한 접속변경순서 결정방법 (A Re-Configuration Genetic Algorithm for Distribution Systems)

  • 최대섭
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2004년도 학술대회 논문집
    • /
    • pp.381-383
    • /
    • 2004
  • Recently, sectionalizing switches have been coming to be operated by remote control through the distribution SCADA system. However, the problem of determining the optimal switching sequence is a combinatorial optimization problem, and is quite difficult to solve. Hence, it is imperative to develop practically applicable solution algorithms create a new arbitral distribution system configuration from an initial configuration, and some of these algorithms do not show a load transfer sequence to reach the objective system.

  • PDF

배전계통에서 유전적 알고리즘을 이용한 접속변경순서결정방법 (A Re-Configuration Genetic Algorithm for Distribution Systems)

  • 최대섭
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2005년도 춘계학술대회논문집
    • /
    • pp.418-420
    • /
    • 2005
  • Recently, sectionalizing switches have been coming to be operated by remote control through the distribution SCADA system. However, the problem of determining the optimal switching sequence is a combinatorial optimization problem, and is quite difficult In solve. Hence, it is imperative to develop practically applicable solution algorithms create a new arbitral distribution system configuration from an initial configuration and some of these algorithms do not show a load transfer sequence to reach the objective system.

  • PDF

A DVR Control for Compensating Unbalanced Voltage Dips of a DFIG System using Zero Sequence Components

  • Thinh, Quach Ngoc;Ko, Ji-Han;Kim, Dong-Wan;Kim, Eel-Hwan
    • 조명전기설비학회논문지
    • /
    • 제27권2호
    • /
    • pp.62-68
    • /
    • 2013
  • The dynamic voltage restorer (DVR) is an effective protection device for wind turbine generators based on doubly-fed induction generator (DFIG) that is operated under unbalanced voltage dip conditions. The compensating voltages of the DVR depend on the voltage dips and on the influence of the zero sequence component. The zero sequence component results in high insulation costs and asymmetry in terminal voltages. This paper proposes the use of a proportional-resonant controller in stationary reference frames for controlling zero sequence components in the DVR to protect the DFIG during unbalanced voltage dips. To enhance the proposed control method, a comparison is carried out between two cases: with and without using the control of a zero sequence component. Simulation results are presented to verify the effectiveness of the proposed control method by using the Psim simulation program.

승강기의 비상 통화장치용 비상 전원장치의 충·방전 제어회로 (Control Scheme of Emergency Power Supply for Elevator Emergency Call System)

  • 박노식;이동희
    • 조명전기설비학회논문지
    • /
    • 제29권8호
    • /
    • pp.40-48
    • /
    • 2015
  • In this paper, battery charging and discharging circuit with a single voltage power supply is proposed. The proposed circuit has the separated current path and charging-monitoring sequence control scheme. In the charging sequence, the proposed 2-level comparator combined with control signal of the micro-processor can control the constant charging current to protect the over current of the battery. Furthermore, the proposed circuit uses a periodic main power switch control to detect the discharging characteristics to estimate the approximated battery life-time. In the experiments, the proposed emergency power supply for emergency call system has 89% efficiency with 98% power factor. And the proposed sequence control scheme is well operated in the designed emergency power system.

상업용 설비 부하의 중성선 영상전류 저감장치 분석 및 적용에 관한 연구 (A Study on the Analysis and Application of Neutral Line Zero Sequence Currents Reduction Device in Commercial Facility Loads)

  • 김경철;이일무;백승현
    • 조명전기설비학회논문지
    • /
    • 제18권5호
    • /
    • pp.54-60
    • /
    • 2004
  • 현대 사회 전반에 걸쳐 개인용 컴퓨터와 같은 비선형 부하가 증가하여, 중성선에는 많은 고조파 전류가 흐른다. 3상 4선식 배전계통을 채용하는 중성선에 과다한 고조파 전류가 흐르면 여러 가지 고조파 장해를 일으킨다. 중성선 고조파 저감 대책으로 지그재그 변압기를 이용하는 영상 필터가 널리 쓰이고 있다. 본 논문에서는 상용화된 중성선 영상 전류 저감장치를 분석하고, 고조파를 저감시키기 위해서 상업용 설비 부하에 적용하고자 한다. 실측한 값과 MATLAB으로 시뮬레이션 한 값을 수치와 그래프로 비교해 보았다.