• 제목/요약/키워드: Installation schedule

검색결과 61건 처리시간 0.024초

재해율의 예측에 의한 강구조공사의 중대재해 예방에 관한 연구 (A Study on Prevention of Major Accidents Through Utilization of Fall-Preventing Safety Installations)

  • 손기상;정경운
    • 한국안전학회지
    • /
    • 제13권4호
    • /
    • pp.221-229
    • /
    • 1998
  • This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.

  • PDF

핵연료 노내조사시험설비의 시공 현황 (The Construction Status of Fuel Test Loop Facility)

  • 박국남;이정영;김학노;유현재;유성연
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2007년도 동계학술발표대회 논문집
    • /
    • pp.305-309
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

대형병원에서 마이크로터빈 이용한 열병합시스템 에너지성능 및 경제성 분석 (The Energy Performance & Economy Efficiency Evaluation of Microturbine Installed in Hospital buildings)

  • 김병수;길영욱;홍원표
    • 조명전기설비학회논문지
    • /
    • 제23권12호
    • /
    • pp.176-183
    • /
    • 2009
  • 대형병원의 에너지 소비패턴을 분석한 후 마이크로가스터빈을 적용할 경우 기존 시스템 대비 냉난방에너지 절감량 및 전기에너지 절감량과 경제성분석을 통해 대형병원의 에너지 소비량을 절감하기 위한 에너지성능평가 모의연구를 수행하였다. 0.5[MW]급 마이크로 가스터빈을 설치한 후 에너지 성능분석을 한 결과 터빈에서의 발전효율은 30[%]이며, 전기는 건물에서 사용되는 조명에너지 뿐만 아니라 전체 전기에너지의 40[%]을 절감할 수 있는 것으로 분석되었다. 또한 터빈에서 발전되는 전기량과 배열을 냉난방에너지원으로 이용할 경우 전체 시스템효율은 70[%]로 상승할 뿐만 아니라 난방에너지의 56[%], 냉방에너지의 67[%]를 절감할 수 있는 것으로 분석되었으며 현가등가법에 의한 시스템 투자회수 기간이 약 9년으로 분석되었다.

학교주변 어린이보호구역 안전실태 사례조사 연구 (A Case Study on the Safety of School Zones)

  • 김은주
    • 한국학교ㆍ지역보건교육학회지
    • /
    • 제9권1호
    • /
    • pp.115-126
    • /
    • 2008
  • Backgrounds: The objective of school zones was to define protective areas and to keep children vulnerable to traffic accidents from the risk. The current "Rules on the Designation and Management of School Zones" included provisions on the installation of traffic safety facilities and road facilities, but they were not sufficient for children's traffic safety and there were many difficulties in applying standards to the fields. Purposes: With these problems to be solved, the present study surveyed the current state of safety facilities in school footpaths and school zones around elementary schools and suggested plans to improve them. This study studied various factors like the physical environment and the safety facilities in the school zone. Methods: The present researcher visited four elementary schools selected for this study, and surveyed safety facilities in the school zones around the elementary schools using a schedule prepared by the researcher. Results: According to the results of the case study, all of the four schools were designated as school zones, but the designation appeared nominal without sufficient safety facilities that can ensure children's safety. Based on the results of the survey, suggestions were made to improve traffic facilities in school zones and school footpaths as well as safety guidance.

  • PDF

성견에서 Titanium Plasma Sprayed IMZ 임플란트에 가해진 조기 기능하중의 골유착 및 골형성에 미치는 영향 (EFFECTS OF EARLY FUNCTIONAL LOADING ON BONE FORMATION AROUND TITANIUM PLASMA SPRAYED IMZ IMPLANTS IN DOGS)

  • 전영식;한동후
    • 대한치과보철학회지
    • /
    • 제33권3호
    • /
    • pp.550-568
    • /
    • 1995
  • The purpose of this study was to observe the effects of early functional on bone formation around titanium plsama sprayed IMZ implants. 15 IMZ implants were inserted on the mandibular premolar areaa in 5 mondgrel dogs. The inplants were divided into 4 groups according to it’s loading schedule : Temporary abutments were connected for functional loading 6weeks, 9weeks, and 12weeks after implants installation in group I, II, and III, respectively. Abutments were not connected in the control group. After polyfluorochrome sequential labeling, all animals were sacrificed and bone sections includig implants and the 1st. molar were removed and processed for histologic evaluation. From light and fluorescence microscopic evaluation as well as histomorphometric and EPMA analysis, following results were obtained : 1. Light microscopically, the osteoid tissues were observed much in the compact bone of unloaded group, and cancellous bone formation observed more in early loaded group. 2. Calcification and remodeling of bone took place faster in loaded group, especially in 6 weeks group. 3. Moderate to severe marginal bone resorption was observed in 6 weeks group, mainly on buccal crest. 4. There was no difference in the percentages of bone-to-metal contact among the experimental groups. 5. In quantitative analysis using EPMA, there was no difference in the content of calcium and phosphorus among the experimental groups, regardless of distance.

  • PDF

자동차 도장공장의 Color Rescheduling Storage 설치를 위한 시뮬레이션 분석 (A Simulation Analysis on the Validity of Color Rescheduling Storage in an Automobile Painting Shop)

  • 문덕희;김하석;송성;김경완
    • 산업공학
    • /
    • 제16권2호
    • /
    • pp.211-221
    • /
    • 2003
  • This paper introduces a simulation study regarding the design for the installation of Color Rescheduling Storage (CRS) in an automobile factory. In the painting shop the colors of vehicles are changed frequently according to the assembly schedule. When the color of a vehicle is changed from one to another, the cleaning process of painting-gun is necessary and it generates costs. Therefore many of the automobile manufacturers equip the CRS in front of the Top Coat Booth of the painting shop. The major objective of CRS is to reduce the change over cost in the painting process by grouping vehicles having same color. In this paper the configuration of CRS and the input/output algorithms are explained. The suggested system is verified using simulation models and experiments are conducted. Finally the best alternative is suggested by sensitivity analysis and evaluation of investment feasibility.

에너지절약형 주택에서의 단열차양 적용과 제어방법에 따른 냉난방부하 분석 (An Analysis of Heating and Cooling Loads by Insulated Shades and Control Method in an Energy Saving Apartment)

  • 박선효;권경우;손장열
    • 설비공학논문집
    • /
    • 제22권6호
    • /
    • pp.392-397
    • /
    • 2010
  • Energy loss from windows accounts for large scores of heating and cooling loads also in energy saving apartments that is reduced over 30% of total energy consumption. Movable reflective insulations, insulation shutters, blinds, insulated shades are used to reduce energy loads from windows. In this study, energy saving performance of insulated shades was simulated by control methods. According to installation of insulated shades, heating loads were decreased about 10.5~11.3%, and cooling loads are decreased about 29.1~38.3% on an energy saving apartment. The heating peak load was reduced about 9.5% by insulated shades and the cooling peak load was reduced about 25.7~31.5%. In the case of insulated shades with automatic control system, simple time schedule control system would be more efficient than outdoor detection control system that should use several sensors.

PCM을 활용한 가변형 몰드 제작 프로세스 (Flexible Mold Production Process for Using the PCM)

  • 김태구;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.272-273
    • /
    • 2014
  • Existing the free-form concrete segments (FCS) mold is produced by state of solid such as steel, wood, Styrofoam that can not be recycled. Using FCS mold result in delay on schedule and decrease of productivity because it consists of irregular curved variety and it requires more time than fixed mold. Thus, FCS mold should be developed which can reduce the costs and also it can be used as semipermanent. The aim of this study is to suggest of flexible mold production process for using the phase change materials(PCM). PCM is maintain that its solid state at low temperature but it changes phase to liquid state by heating. PCM is suitable material for flexible mold due to change of phase in relatively high temperature compare to other phase change materials such as water. Flexible mold is possible that reuse semi-permanently made by PCM. Thus, this study is proposed the process of flexible mold production for using the PCM. The study results will be used as the basic theory for studies on production and installation of FCS.

  • PDF

해양플랜트 의장품 조달관리를 위한 배관 공정 리드타임 예측 모델에 관한 연구 (A Study of Piping Leadtime Forecast in Offshore Plant’s Outfittings Procurement Management)

  • 함동균;백명기;박중구;우종훈
    • 대한조선학회논문집
    • /
    • 제53권1호
    • /
    • pp.29-36
    • /
    • 2016
  • In shipbuilding and offshore plant construction, pipe-stools of various types are installed. Moreover, these are many quantities but they must be installed in a successive manner. Due to these characteristics the pipe-stool installation processes easily tends to cause the schedule delays in the overall production processes. In order to reduce delay, the goal of this study is to predicts production’s lead time before manufacturing. Through this predictions it’s expected to reduce total production’s lead time by improving it's process. First of all, we made MLR(Multiple Linear Regression) and PLSR(Partial Least Square Regression) model to predict pipe-spool's lead time and then compared predictability of MLR and PLSR model. If a explanatory variable is added, it will be possible to predict results precisely.

발전소 전기설비의 생산성 향상을 위한 케이블 드럼 스케줄링 알고리즘 구현 (Implementation of Cable Drum Scheduling Algorithm for Productivity Enhancement of Power Plant Electrical Installations)

  • 이양선;박기홍;최효범;오지현
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2015년도 추계학술대회
    • /
    • pp.770-771
    • /
    • 2015
  • 본 논문에서는 발전소 전기설비 및 구축비용의 상당부분을 차지하는 케이블의 손실자원을 최소화하고, 효율적인 케이블 자재관리가 가능한 케이블 드럼 스케줄링 자동화를 제안하고 구현하였다. 구현된 케이블 드럼 스케줄링은 기존 수기방식의 케이블 드럼 계산에 소요되는 소비시간을 최소화하고, 종류별 케이블들을 케이블 드럼 총용량에 최적화함으로써 전기설비 생산성을 향상시킬 수 있다.

  • PDF