• Title/Summary/Keyword: Installation equipment

Search Result 930, Processing Time 0.027 seconds

Program Development for Vibration Performance Evaluation of Powder Transfer Equipment

  • Lee, Hyoung-Woo;Ryu, Jeong-Hyeon;Park, Noh-Gill
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.7 no.2
    • /
    • pp.60-65
    • /
    • 2006
  • A vibrational model of powder transfer equipment based on the lumped parameter method was developed, in which the operating motion consists of surging, bouncing, and pitching. After decoupling the equation of motion, the vibrational excitation source of the pitching motion was removed. So the designers are able to plan the optimum design to adjust the motion trajectory of the powder transfer equipment. That is, a procedure to adjust the motion trajectory of powder transfer equipment by changing design specifications such as the installation position, the direction of the motor, the driving speed, the mass unbalance, the stiffness coefficient, and the installation position of the support spring, is presented in this paper. The powder transfer equipment manufactured according to the results of this study did not suffer fatigue destruction, since the maximum stress on the basket structure was sufficiently small.

Power Distribution System Equipment Failure Rate Analysis for Reliability Estimation (신뢰도 평가를 위한 배전계통 설비기기 고장률 분석)

  • Lee, Hee-Tae;Kim, Jae-Chul;Moon, Jong-Fil;Park, Chang-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.370-373
    • /
    • 2004
  • The inside and outside of the country utilities considered that they focused energy and economic aspect for short-term in new environment change of restructure. but it need service reliability preservation and improvement countermeasure, that is no to use existent estimation method for reliability preservation. therefore, analyze the equipment failure rate for suitable reliability preservation through equipment failure rate analysis of power distribution r system and evaluated equipment that is composing power distribution system by the failure rate. This paper estimated failure causes and the TVFR(Time Varying Failure Rate) for main equipment that is composing power distribution system using Weibull distribution.

  • PDF

Diagnosis of a trouble existence and development of prediction method for electrical equipment inside a building (건축물 내 전기설비 이상 유무 진단 및 예측기법 개발)

  • Kim, Young-Dal;Kim, Hyo-Jin;Kim, Dae-Sik;Kim, Jae-Hoon;Han, Sang-Ok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07e
    • /
    • pp.31-33
    • /
    • 2005
  • The accelerating of industrial development causes electricity demand to increase. By that power equipments need high power, multi function and intelligence. Also consumers demand for guarantee power supplying of good quality and reasonable operating equipment. Also they require for reliance and stabilization of power facility. Therefore preventive maintenance of electric installation must be developed and improvement of domestic technical level is needed in the maintenance management of equipment. The diagnosis of trouble existence is technique that compares steady state with unusual condition, whereas the prediction technique makes a diagnosis of remaining equipments life. It is difficult for us to diagnose trouble existence of electric installation and to develop prediction method in building because of a wide scope for electric installation in building. And in this paper we will investigate diagnosis and prediction method for only switch part of electric installation in building.

  • PDF

A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work (지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구)

  • Shim, Hak-Bo;Jeon, Hyun-Soo;Seok, Won-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

Analysis of Vehicle Fire Accident Caused by Defect of Optionally Established Equipment (부가적으로 설치된 장치 결함으로 인한 차량화재 사고사례 분석)

  • Park, Nam-Kyu;Kim, Jin-Pyo;Nam, Jung-Woo;Song, Jae-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.40-46
    • /
    • 2014
  • This paper deal with due to the additional equipment established on the vehicle fire accident cases. Recently, vehicle was recognized as other living spaces and it was increasing installation of additional devices such as a black box, multivision, additional battery and so on. However, these additional devices were established on the vehicle by non-specialists such as the general public user or manufacturing and distributors of additional devices since the vehicle factory. Resulting from the additional equipments due to installation errors in these additional equipments connected to the electrical wiring insulation damage or electrical breakdown occurs, and finally leading to a fire caused by the additional equipments. Therefore, additional equipment established on the vehicle due to a fire in order to prevent accidents during the manufacturing process of these devices are installed. If not installed unless the manufacturing process, the installation of additional equipments established by professional who knows the vehicle structure that will be able to prevent the fire.

A Study on The Improvement of Weapon System Test and Evaluation - Focusing on the weapon system in the research development stage - (연구개발무기체계 시험평가 발전방안에 관한 연구)

  • Lee, Kang-Un;Boo, Joon-Hyo
    • Journal of National Security and Military Science
    • /
    • s.8
    • /
    • pp.383-420
    • /
    • 2010
  • This article is focusing on the improvement of weapon system test & evaluation, aimed at the weapon system in the research development stage. This article suggests improvement directions in three aspects(organization and system, skilled manpower and technology, test facilities of weapon system test & evaluation) as follows. 1) Weapon system test & evaluation organization and system a. Establishment of comprehensive test & evaluation system b. Making regulation for comprehensive test infrastructure management. c. Standardization of test & evaluation process, which can be used in special subject to army, navy and air force. 2) Skilled manpower and technology of weapon system test & evaluation a. Training & education, management of test & evaluation experts. b. Establishment of skill management system of test & evaluation. 3) Test facilities of weapon system test & evaluation a. Establishment of comprehensive improvement direction of test & evaluation installation and equipment. b. Consideration of counter measures to prevent overlapping investment, and to use the test & evaluation resources efficiently. c. Establishment of organic network for the effective use of test & evaluation installation and equipment. d. Establishment of detailed cooperation plan for the commonage of test & evaluation facility and equipment.

  • PDF

Experimental Examinations on Protective Effects of SPDs Associated with the Protective Distance and Type of Load (보호거리와 부하 유형에 따른 SPD의 보호효과에 대한 실험적 고찰)

  • Lee, Bok-Hee;Kim, You-Ha;Ahn, Chang-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.81-88
    • /
    • 2012
  • Surge protective devices(SPDs) are widely used as a most effective means protecting the electrical and electronic equipment against overvoltages such as lightning and switching surges. When installing SPDs, it is essential that the voltage protection level provided by SPDs should be lower than the withstand voltage of the equipment being protected. But even the proper selection of SPDs are achieved, the voltage at the equipment terminal may be higher than the residual voltage of SPD due to the reflection and oscillation phenomena. This paper was focused on the investigations of the conditions for which the equipment is protected by an SPD taking into account the influences of the protective distance and type of load. The protective effects of SPD with voltage-limiting component were analyzed as functions of types of load and protective distance between the SPD and load. As a result, in the cases of long protective distances, capacitive loads and loads with high resistance, the voltage at the load terminal was significantly higher than the residual voltage of SPD. It was found that the proper installation of SPDs should be carried out by taking into account the protective distance and type of load to achieve reliable protection of electronic equipments against surges.