• Title/Summary/Keyword: Installation Point

Search Result 721, Processing Time 0.023 seconds

Real Maximum power point tracking for loss compensation of PV array under partially shaded condition (태양전지 어레이 음영 변화에 따른 손실 보상을 위한 최대전력점 추종 기법)

  • Jung, Hoon-Young;Ji, Young-Hyok;Jung, Doo-Yong;Lee, Su-Won;Won, Chung-Yuen
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.317-320
    • /
    • 2009
  • Under partial shading condition, the multiple local maxima can be existed on the output characteristics of PV array. In case of the conventional MPPTs (i.e P&O or IncCond), the failure of maximum power point tracking could be occurred under partial shading condition(PSC). The problems are deduced by the analysis of conventional MPPTs. In this paper, a real maximum power point tracking for PV array under partially shaded condition is proposed. And proposed MPPT is analyzed by case study. It is confirmed by simulation results that the proposed MPPT can track the real MPP under partial shading condition.

  • PDF

Transient impedance characteristics of counterpoise according to the current injection position (전류인가위치에 따른 매설지선의 과도접지임피던스 특성)

  • Lee, Bok-Hee;Li, Feng;Lee, Song-Zhu;Yoo, Jae-Duk;Cho, Sung-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.328-331
    • /
    • 2009
  • This paper presents the behaviors of transient and conventional grounding impedances of a 30m counterpoise according to the injection point of lightning impulse currents. As a result, the trend of the conventional grounding impedances measured as a function of risetime of impulse current is similar to the transient grounding impedance of counterpoise. The injection point of impulse current greatly influences on the transient grounding impedance characteristics of counterpoise. The transient grounding impedances strongly depend on the injection point and the rising time of impulse current and the soil characteristics.

  • PDF

The Site Installation Test of Single-Phase MJ81 Switch Point Machine Localization (단상 MJ81 전기선로전환기 국산품의 현장설치시험)

  • Baek, Jong-Hyen;Kim, Yong-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.12
    • /
    • pp.3632-3637
    • /
    • 2009
  • In this paper, we describe the performance results of the field installation test which is required to practicalize the single-phase MJ81 Switch Point Machine. This product has passed the certified test through performance improvement of driving parts in order to use 3 phase MJ81 Switch Point Machine, which is localized by taking over technology from Alstom and Cogifer when constructing Seoul-Busan rapid-transit railway, without change of the electrical equipment at track-side in domestic existing lines which single-phase 220V is used. KRRI and Samsung SDS have localized the single-phase MJ81 Switch Point Machine to improve the speed and safety of the conventional lines through the existing railway technology development project. For practicalization of this, we should, however, verify the performance through not only field installation test in real lines but also interface test with the interlocking. In this paper we verify the practicality of the domestic single-phase MJ81 Switch Point Machine through analysis on the performance result of the field installation test as well as the research contents for this test. Thereby, in Feb 2009 we have received an order from the Korea Rail Network Authority and are currently installing the single-phase MJ81 Switch Point Machine.

Optimal location of Batcher Plant using Modified Steiner point (수정된 Steiner Point를 이용한 Batcher Plant의 최적 위치 선정)

  • Ha, Kwon-Yeol;Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.10
    • /
    • pp.39-46
    • /
    • 2015
  • REMICON(Ready Mixed Concrete), the most essential material of construction work, is produced from facility called "Batcher plant." In order to produce Remicon, Batcher Plant needs to be supplied with basic raw material such as ballast, sand, cement, admixture and water. In remicon industry, overland transport vehicles are used during the whole manufacturing process from producing to infilling at the construction site. Thus, the transportation cost sums up be to 20 percent of whole manufacturing cost and transport capacity and distance travelled have direct and major effect on manufacturing costs. This paper suggests a method to find optimal location of batcher plant using modified Steiner point, suggesting the most effective and flexible connection through among construction site, aggregate, cement and remicon producing plant. This paper also proposes reducing of transport cost at maximum 60% by calculation through optimized plant location. The modified Steiner point theory proposed in this paper also can be applied to optimal location of a $2^{ry}$ substation or MCC panel for minimizing of power loss, voltage drop, line distance and etc.

Study of the Effect of the Point-to-Point Speed Enforcement System Using a Comparison-Group Method (비교그룹방법을 이용한 무인구간속도위반단속시스템 설치 효과 분석)

  • Yun, Il-Soo;Park, Sung-Ho;Oh, Bong-Sik;Oh, Young-Tae
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.177-185
    • /
    • 2011
  • In order to reduce traffic accidents at long road sections involving high risks of traffic accidents, including tunnels, bridges or curves, the National Police Agency have decided a tentative installation and operation of an automated point-to-point speed enforcement system based on cameras at January, 2007. The first system was established at the direction to Kangreung of Dunnae Tunnel at December, 2007. Currently, the automated point-to-point speed enforcement system operates at 11 sections including eight sections on expressways and three sections on national highways. However, there have been few researches on the effects of the system upon the reduction of traffic accidents in a scientific way. To this end, this research effort was initiated to evaluate the effect of the automated point-to-point speed enforcement system on traffic safety by comparing the number of traffic accidents before and after the installation of the system using a comparison-group(C-G) method. Three-year-long traffic accident data for the expressways were collected in order to evaluate the system. As a result, the installation of the system was found to reduce traffic accidents by 49.97% in average.

A Study on the Analysis and Limitations of the Same Phase Identification Under 3-Phase Unbalanced Constant Current Loads (3상 불평형 정전류 부하 조건에서의 동 위상 판별에 대한 분석 및 한계에 관한 연구)

  • Byun, Hee-Jung;Shon, Su-Goog
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.6
    • /
    • pp.38-46
    • /
    • 2012
  • In this paper, the necessity for the identification of the absolute phase value is introduced and analyzed for a particular conductor line of a 3-phase type distribution network and the recent methods are also introduced. For the determination of the exact phase value for a specific point in the line, as compared with the phase reference point, the measured phase value must be within a range of ${\pm}60[^{\circ}]$. However, the phase of a particular point can fluctuate depending on the line constant, transformer wiring method, line length, line amperage, etc. A theoretical formulation such as Simulink modeling and analysis for a distribution network are conducted for the identification of phase at a specific point in the line. In particular, through evaluating the effects of unbalanced current loads at the time of determination of the phase value, the limitations of the present method for the determination of phases is described.

A Study on Application of the Photo Detector for Electromagnetic Fuel Injection System of DI Diesel Engine (직분식 디젤기관 전자분사계의 광검출기 적용에 관한 연구)

  • Ra, Jin-Hong;Ahn, Soo-Kil
    • Journal of Ocean Engineering and Technology
    • /
    • v.13 no.3B
    • /
    • pp.38-46
    • /
    • 1999
  • Increasing stringent emissions legislation and requirement of more effective energy used for diesel engine demand the fine control of the fuel injection system. Recently, the electromagnetic fuel injection control system for diesel engine is tried to realize the optimum diesel combustion by the feel back sensing as optical signal of combustion flame. The photo detectors were made for the feed back signal of electromagnetic fuel injection control for small DI diesel engine. Their abilities to detect defining combustion events were examined. By evaluating test results, it was shown that the wider acceptable optical range design of optical probe window face, and selection of installation position and installation method of detector were important point for improving sensing ability. The detector was shown to detect start and end of diffused combustion and maximum point of flame intensity impossible for pressure sensor, and also shown that the maximum point of flame intensity was 75% of accumulated heat release point within the experimental conditions.

  • PDF

Numerical simulations of deep penetration problems using the material point method

  • Lorenzo, R.;da Cunha, Renato P.;Cordao Neto, Manoel P.;Nairn, John A.
    • Geomechanics and Engineering
    • /
    • v.11 no.1
    • /
    • pp.59-76
    • /
    • 2016
  • Penetration problems in geomechanics are common. Usually the soil is heavily disturbed around the penetrating bodies and large deformations and distortions can occur. The simulation of the installation of displacement piles is a good example of the interest of these types of problems for geomechanics. In this paper the Material Point Method is used to overcome the difficulties associated with the simulations of problems involving large deformation and full displacement type penetration. Recent modifications of the Material Point Method known as Generalized Interpolation Material Point and the Convected Particle Domain Interpolation are also used and evaluated in some of the examples. Herein a footing submitted to large settlements is presented and simulated, together with the processes associated to a driven pile under undrained conditions. The displacements of the soil surrounding the pile are compared with those obtained by the Small Strain Path Method. In addition, the Modified Cam Clay model is implemented in a code of MPM and used to simulate the process of driving a pile in dry sand. Good and rather encouraging agreement is found between compared data.

A Case Study on Collaborative Activities for Newly Installation of an Engine in a Helicopter (헬기 엔진의 신규장착을 위한 지원 사례 연구)

  • Ahn, Ieeki;Kim, Jae-Hwan;Sung, Oksuk
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.2
    • /
    • pp.27-32
    • /
    • 2014
  • From the flight safety and the performance point of views, a new engine installation impacts an helicopter development or upgrade program significantly. More than a close relationship between an aircraft manufacturer and an engine manufacturer is necessary for the best integration work from the program initiation phase. In this paper, technical cooperation between aircraft and engine companies, and technical supports by the engine manufacturer for the T700/701K engine during the Surion development program are summarized. The applications of official technical program documents, US Mil-spec, France airworthiness regulations as the standard of the engine installation work, and engineering activities at each phase such as contract, design and manufacturing, flight clearance, ground and flight tests are described. This paper would be a cornerstone for the future domestic helicopter development program.

An Effective Approach of Installation of Surge Protective Devices for AC Mains (전원선용 SPD의 효과적인 설치기법)

  • Lee, Dong-Moon;Jeong, Dong-Cheol;Lee, Seung-Chil;Lee, Bok-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2005.07c
    • /
    • pp.2229-2231
    • /
    • 2005
  • Recently, damages of electronic equipments due to lightning surges coming from AC power lines are increasing. In this work, to propose the effective installation methods of surge protective devices(SPDs), the protective performances of SPDs in actual-sized test circuits were experimentally investigated. In order to obtain the lowest limiting voltage and best protection, long leads of SPDs in installation practices are significantly undesirable. An effective installation method of SPDs for AC mains was proposed. The way of installing SPDs at every branch circuits is more effective than that of installing a SPD near the point of entry.

  • PDF