• 제목/요약/키워드: Installation Cost

검색결과 1,176건 처리시간 0.025초

냉방기기별 경제성 평가 (Economic Evaluation of Various Cooling Systems)

  • 김영일;조금남
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.214-219
    • /
    • 2008
  • In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of $1,200\;m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, equipment, construction, installation, electric facility, financial subsidy and tax cut are considered. Basic electricity, energy(electricity and gas), space charge, labor, insurance and repair are considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP. However, different outcome may result if different assumptions are made. This study is useful for performing an economic evaluation of various air-conditioning systems.

  • PDF

동적계획법을 이용한 다계층 VOD 망의 저장량 결정 (Storage Allocation in Multi-level VOD Network Using Dynamic Programming)

  • 김여근;조명래;김재윤
    • 산업공학
    • /
    • 제9권3호
    • /
    • pp.202-213
    • /
    • 1996
  • Video-on-demand is an interactive service that provides programs (movie, home shopping, etc.) to users connected to a network. This service will require high bandwidth network and video servers with a large amount of storage capacity. From the viewpoint of system analysis, there are optimization problems to be solved. In this paper, we present a dynamic programming method for allocating the storage for programs being served in a multi-level video-on-demand network. In the optimization of the network resource, we consider the three kinds of costs: installation cost for video servers, program storage cost, and transmission (or communication) cost. The factors related to the costs are investigated. An example is shown to illustrate the proposed method.

  • PDF

휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정 (Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy)

  • 최남진;김병섭;신중린
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권11호
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

LNG 운반선을 위한 BOG 재액화시스템 최적 설계 (Optimal Process Design of Onboard BOG Re-liquefaction System for LNG Carrier)

  • 황철민;임영섭
    • 한국해양공학회지
    • /
    • 제32권5호
    • /
    • pp.372-379
    • /
    • 2018
  • High-pressure gas injection engines (HPGI) took center stage in LNG carrier propulsion systems after their advent. The HPGI engine system can be easily modified to include a re-liquefaction system by adding several devices, which can significantly increase the economic feasibility of the total system. This paper suggests the optimal operating conditions and capacity for a re-liquefaction system for an LNG carrier, which can minimize increases in the total annualized cost. The installation of a re-liquefaction system can save 0.23 million USD per year when the cost of LNG is 5 USD/Mscf. A sensitivity analysis with different LNG costs showed that the re-liquefaction system is profitable when the LNG cost is higher than 3.5 USD/Mscf.

Optimal Transmission Expansion Planning Considering the Uncertainties of the Power Market

  • Bae, In-Su;Son, Min-Kyun;Kim, Jin-O
    • Journal of Electrical Engineering and Technology
    • /
    • 제5권2호
    • /
    • pp.239-245
    • /
    • 2010
  • Today, as power trades between generators and loads are liberalized, the uncertainty level of power systems is rapidly increasing. Therefore, transmission operators are required to incorporate these uncertainties when establishing an investment plan for effective operation of transmission facilities. This paper proposes the methodology for an optimal solution of transmission expansion plans for the long-term in a deregulated power system. The proposed model uses the probabilistic cost of transmission congestion for various scenarios and the annual increasing rates of loads. The locations and the installation times of expanded transmissions lines with minimum cost are acquired by the model. To minimize the investment risk, the Mean-Variance Markowitz portfolio theory is applied to the model. In a case study, the optimal solution of a transmission expansion plan is obtained considering the uncertain power market.

차지상간 통합전송시스템의 무선 대역폭 및 시스템에 관한 연구 (A study on wireless bandwidth and system of unified data transmission in a subway and railway)

  • 정상국;최갑봉;안태기;김백현;양동석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1145-1150
    • /
    • 2008
  • In this paper, We studied efficient design of wireless transmission system for unified data transmission in a subway and railway. It is increased that need of broadband multimedia service to make useful environment for user and to support the operation of railway system. High bandwidth is better if we need more services. But, high bandwidth requires more cost at tunnel of subway. More bandwidth make receive sensitivity to bad. So it need more wireless Station. We deduced best bandwidth of subway wireless transmission system reflecting the cost of installation and efficiency of system. Consequently, we decide efficient service model of broadband wireless system at a subway. Subway broadband wireless transmission system is tested in this year, and it is to be extended to province subway. Cost of subway broadband wireless transmission system is saved, because the system can be efficiently designed. Therefore, the effectiveness is expected to be very big.

  • PDF

재생열에너지 경제성 분석: 균등화열생산비용(LCOH) (Economic Analysis of Renewable Heat Energy: Levelized Cost of Heat (LCOH))

  • 이재석;조일현
    • 신재생에너지
    • /
    • 제20권1호
    • /
    • pp.52-60
    • /
    • 2024
  • This study conducted an economic analysis of renewable heat energy by estimating the levelized cost of heat production (LCOH) of ST and GSHP and comparing it with the cost of alternative fuels. The LCOH of ST ranged from 396.8 KRW/kWh to 578.7 KRW/kWh (small-scale), 270.3 KRW/kWh to 393.3 KRW/kWh (large-scale), and 156.3 KRW/kWh to 220.7 KRW/kWh for GSHP. The economic feasibility of ST and GSHP was analyzed by comparing the calculated LCOH and the fuel costs such as gas and kerosene prices. Moreover, scenario analyses were conducted for installation subsidies under the current system to examine the changes in the economics of renewable thermal energy.

라그랑지안 기반의 휴리스틱 기법을 이용한 셀룰러 모바일 네트워크의 설계 (Designing Cellular Mobile Network Using Lagrangian Based Heuristic)

  • 홍정만;이종협
    • 대한산업공학회지
    • /
    • 제37권1호
    • /
    • pp.19-29
    • /
    • 2011
  • Cellular network is comprised of several base stations which serve cellular shaped service area and each base station (BS) is connected to the mobile switching center (MSC). In this paper, the configuration modeling and algorithm of a cellular mobile network with the aim of minimizing the overall cost of operation (handover) and network installation cost (cabling cost and installing cost of mobile switching center) are considered. Handover and cabling cost is one of the key considerations in designing cellular telecommunication networks. For real-world applications, this configuration study covers in an integrated framework for two major decisions: locating MSC and assigning BS to MSC. The problem is expressed in an integer programming model and a heuristic algorithm based on Lagrangian relaxation is proposed to resolve the problem. Searching for the optimum solution through exact algorithm to this problem appears to be unrealistic considering the large scale nature and NP-Completeness of the problem. The suggested algorithm computes both the bound for the objective value of the problem and the feasible solution for the problem. A Lagrangian heuristics is developed to find the feasible solution. Numerical tests are performed for the effectiveness and efficiency of the proposed heuristic algorithm. Computational experiments show that the performance of the proposed heuristics is satisfactory in the quality of the generated solution.

시스템 다이내믹스를 이용한 농업용수 재이용시스템 경제성 분석 (Economic Analysis of Wastewater Reuse Systems for Agricultural Irrigation using a System Dynamics Approach)

  • 정한석;서교;장태일;성충현;김학관;박승우
    • 한국농공학회논문집
    • /
    • 제55권2호
    • /
    • pp.9-20
    • /
    • 2013
  • Many studies have reported additional treatment is needed to use wastewater for agricultural purpose. Economic considerations should be taken into account to establish infrastructure for agricultural reuse because of a large amount of water use in irrigation and relatively low water quality requirement. The objective of this study was to conduct economic analysis of wastewater reclamation and reuse systems for agriculture. A system dynamics approach considering complexity and dynamics in the wastewater reuse systems was used for the economic analysis, which are related with social, environmental, and economic problems. Sensitivity and benefit cost analysis for wastewater reuse systems was conducted through the established economic assessment model. The result of sensitivity analysis showed that water resources development and installation cost were the most sensitive for total benefits and costs, respectively. The scenario-based test of the organized economic assessment model shows marginal cost ranges and enables decision-makers to decide reasonable cost for the wastewater reuse systems for agriculture.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • 한국건축시공학회지
    • /
    • 제12권4호
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.