• Title/Summary/Keyword: Initial Cost

Search Result 1,562, Processing Time 0.027 seconds

A Study on the Maintenance Expenses of the Public Rental Rousing (공공임대주택 수선비 지출 실태에 관한 연구)

  • Kang, Hyun-Kyu;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.171-180
    • /
    • 2005
  • Public rental housing is constructed, owned, and managed by the public sector. The public institution for the public rental housing controls the whole building life cycle from the construction to the demolition. The construction company for the house built for sale is strongly interested in the cost for the initial investment, while the public institution is more focused on the maintenance cost for the preservation of the buildings Nevertheless, the maintenance cost of the public rental housing has been only managed as the accounting factor without the systemic research and analysis on the actual condition. This paper shows how expenses are related to the degree of obsolescence and presents the differences of the maintenance costs by the housing area and expenditure trends (vs time) of the maintenance costs, through analyzing time series data of public rental housing maintenance cost. Further, this paper helps understanding the causes of the differences of the maintenance costs by housing areas and characteristics of the expenditure trends. After all, this paper contributes to the improvement of the reliability and the practicality for the Life Cycle Cost modeling and the maintenance cost estimating.

A Comparative Study on the Life Cycle Cost of Wall Type Apartment and Beam-Column Structural Apartment (생애주기비용 분석을 통한 벽식 구조 공동주택과 장수명 공동주택의 경제성 비교 연구)

  • Lee, Jeehee;Kim, Kyuree;Son, JeongWook;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.35-43
    • /
    • 2014
  • Ministry of Land, Infrastructure and Transport (MOLIT) promote long-life housing to reduce social costs generated by poorly considered rebuilding and extend the life-span of housing. Long-life housing has advantages of durability, floor plan variability, efficient maintenance and ease of remodeling because it is a beam-column structure building. However, long-life housing requires somewhat higher initial construction cost than wall type apartments. It makes increase of long-life housing more difficult. In this study, we compare between wall-type apartment and beam-column structure apartment from Life-Cycle Cost's viewpoint. As a result of the study, long-life housing incurs 18% higher initial cost than wall type apartment, but is 7% more economical than wall type apartment in terms of Life Cycle Cost. Therefore, it is shown that long-life housing could be a beneficial alternative to traditional wall type apartments.

Analysis of Life Cycle Costs of Railway Track : A Case Study for Ballasted and Concrete Track for High-Speed Railway (철도 궤도의 수명주기비용 분석 : 고속철도 자갈궤도와 콘크리트궤도 사례 연구)

  • Jang, Seung Yup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.2
    • /
    • pp.110-121
    • /
    • 2016
  • In the decision-making, such as selection of structure, construction method, or time and scheme of maintenance, the evaluation of life-cycle cost(LCC) is of great importance. The maintenance cost occupy a large portion of the LCC of the railway track as well as the initial construction cost. Futhermore, the proportion of the maintenance cost is much higher in the ballasted track. Thus, the importance of the LCC evaluation is higher than in any other engineering structures. In this study, a LCC model that can consider various design parameters such as the type of track structure, annual traffic volume, axle load, train speed, and proportion of curve sections and engineering structures has been developed. Fundamental data for calculating costs also have been presented. Based on the model and data proposed, the trends in the variation of LCC according to the design parameters were examined and the most important design parameters in the LCC analysis of railway track were investigated. The results show that the proportion of renewal and operational costs is much higher in the ballasted track than in the concrete track, and the annual traffic volume and ballast taming period are most significant factors on the LCC of the ballasted track. On the contrary, it is revealed that the proportion of the initial construction costs in the concrete track is much higher, and the LCC of the concrete track is less sensitive to the traffic volume, train speed, and axle load.

Evaluation of Performance and Maintenance Cost for Roadside's Particulate Matter Reduction Devices Using Smart Green Infrastructure Technology (스마트 그린인프라 기술을 활용한 도로변 미세먼지 저감장치의 성능 및 유지·관리 비용 평가)

  • Song, Kyu-Sung;Seok, Young-Sun;Yim, Hyo-Sook;Chon, Jin-Hyung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.25 no.4
    • /
    • pp.15-31
    • /
    • 2022
  • The Green Purification Unit System (GPUS) is a green infrastructure facility applicable to the roadside to reduce particulate matter from road traffic. This study introduces two types of GPUS (type1 and type2) and assesses the performance and maintenance costs of each of them. The GPUS's performance analysis used the data collected in November 2021 after the installation of the GPUS type1 and type2 at the study site in Suwon. The changes in the particulate matter concentration near the GPUS were measured. The maintenance cost of GPUS type1 and type2 was assessed by calculating the initial installation cost and the management and repair cost after installation. The results of the performance analysis showed that the GPUS type1, which was manufactured by combining plants and electric dust collectors, had a superior particulate matter reduction performance. In particular, type1 produced a greater effect of particulate matter reduction in the time with a high concentration (50㎍/m3 or higher) of particulate matter due to the operation of electric dust collectors. GPUS type2, which was designed in the form of a plant wall without applying an electric dust collector, showed lower reduction performance than type1 but showed sufficiently improved performance compared to the existing band green area. Meanwhile, the GPUS type1 had three times higher costs for the initial installation than GPUS type2. In terms of costs for managing and repairing, it was evaluated that type1 would be slightly more costly than type2. Finally, this study discussed the applicability of two types of GPUS based on the result of the analysis of their particulate matter performance and maintenance cost at the same time. Since GPUS type2 has a cheaper cost than type1, it could be more economical. However, in the area suffering a high concentration of particulate matter, GPUS type1 would be more effective than type2. Therefore, the choice of GPUS types should rely on the status of particulate matter concentration in the area where GPUS is being installed.

Fast CU Decision Algorithm using the Initial CU Size Estimation and PU modes' RD Cost (초기 CU 크기 예측과 PU 모드 예측 비용을 이용한 고속 CU 결정 알고리즘)

  • Yoo, Hyang-Mi;Shin, Soo-Yeon;Suh, Jae-Won
    • Journal of Broadcast Engineering
    • /
    • v.19 no.3
    • /
    • pp.405-414
    • /
    • 2014
  • High Efficiency Video Coding(HEVC) obtains high compression ratio by applying recursive quad-tree structured coding unit(CU). However, this recursive quad-tree structure brings very high computational complexity to HEVC encoder. In this paper, we present fast CU decision algorithm in recursive quad-tree structure. The proposed algorithm estimates initial CU size before CTU encoding and checks the proposed condition using Coded Block Flag(CBF) and Rate-distortion cost to achieve the fast encoding time saving. And, intra mode estimation is also possible to be skipped using the CBF values acquired during the inter PU mode estimations. Experiment results shows that the proposed algorithm saved about 49.91% and 37.97% of encoding time according to the weighting condition.

Search-Oriented Deployment Strategies using GIS for Wireless Sensor Networks (무선센서 네트워크 성능 향상을 위한 지리정보시스템 기반 탐색 지향적 센서배치 기법)

  • Kim, June-Kyoung;O, Nam-Geol;Kim, Jae-Joon;Lee, Young-Moo;Kim, Hoon;Jung, Bang-Chul
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.10B
    • /
    • pp.973-980
    • /
    • 2009
  • Many studies which have been done for efficient installation and management of wireless sensor networks (WSN) include energy savings, key managements and sensor deployments. Sensor deployment problem is one of the most important and fundamental issues among them in that the topic is directly related with the system cost and performance. In this paper, we suggest a sensor deployment scheme that reduces the system cost of WSN while satisfying the fundamental system requirements of connectivity between sensor nodes and sensing coverage. Using graphical information system(GIS) which contains region-dependent information related with connectivity condition, the initial positions of sensors in the procedure simulated annealing (SA) are determined. The GIS information helps in reducing system cost reduction not only at the initial deployment of SA but also at the final deployment of SA which is shown by computer simulations.

Design and Implementation of Smart Library System for Multi-tenant Environment Using Software on-demand (소프트웨어 온-디멘드 방식의 멀티테넌트 환경을 지원하는 스마트 도서관시스템 설계 및 구현)

  • Min, Byung-won
    • Journal of Convergence Society for SMB
    • /
    • v.6 no.4
    • /
    • pp.131-136
    • /
    • 2016
  • By providing Asp or Client/Server method, most library system service proposal has a problem that is hard to manage and high cost across the software like high cost of hardware and software license, installation and distribution, purchasing cost, upgrade, customization, problem management etc. As proposed in order to solve this problem, smart library system that supporting multi-tenant environment realized on-demand mode that is a simple and little initial investment costs and possible for low cost IT service.

A Study on Economic Analysis and Performance Appraisal of Compact Type Variable Air Volume (컴팩트형 VAV 공조기의 성능평가와 경제성 분석에 관한 연구)

  • Kim, Dong-Cheol;Chung, Kwang-Seop;Kim, Young Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.1
    • /
    • pp.44-49
    • /
    • 2015
  • Ceiling cooling and heating system that consider load arrangement and space in the ceiling needs to be developed. Therefore, experimental and economic changes were done to verify the performance of compact type VAV. The test results were as follow. 1) Noise test result, measuring approximately 50.4 dB~56.6 dB (before ceiling in landfill), had a better ceiling deadline than the current measure, about a 10 dB noise reduction, so that the office baseline (40~50 dB) noise was judged to be less than test. 2) For the static pressure test result, taking out an outside hydrostatic 25 mmAq, 24.8 mmAq was measured, respectively, at the point. 3) For the life-cycle cost analysis result, the initial investment cost, maintenance replacement costs, and maintenance costs increased 0.2%, but the energy savings ratio was 19.5% while the whole life cycle savings of 40 years LCC was reduced 11.9%.

Life cycle cost analysis and smart operation mode of ground source heat pump system

  • Yoon, Seok;Lee, Seung-Rae
    • Smart Structures and Systems
    • /
    • v.16 no.4
    • /
    • pp.743-758
    • /
    • 2015
  • This paper presents an advanced life cycle cost (LCC) analysis of a ground source heat pump (GSHP) system and suggests a smart operation mode with a thermal performance test (TPT) and an energy pile system constructed on the site of the Incheon International Airport (IIA). First, an economic analysis of the GSHP system was conducted for the second passenger terminal of the IIA considering actual influencing factors such as government support and the residual value of the equipment. The analysis results showed that the economic efficiency of the GSHP system could be increased owing to several influential factors. Second, a multiple regression analysis was conducted using different independent variables in order to analyze the influence indices with regard to the LCC results. Every independent index, in this case the initial construction cost, lifespan of the equipment, discount rate and the amount of price inflation can affect the LCC results. Third, a GSHP system using an energy pile was installed on the site of the construction laboratory institute of the IIA. TPTs of W-shape and spiral-coil-type GHEs were conducted in continuous and intermittent operation modes, respectively, prior to system operation of the energy pile. A cooling GSHP system in the energy pile was operated in both the continuous and intermittent modes, and the LCC was calculated. Furthermore, the smart operation mode and LCC were analyzed considering the application of a thermal storage tank.

Energy Saving Design Method with the Consideration of the Initial Cost for Apartment Houses (저에너지 공동주택 구현을 위한 요소기술 선정 기법에 관한 연구)

  • Son, Won-Tug;Lee, Jong-Il;Yoon, Dae-Won;Lee, Keon-Ho;Song, Doosam
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.2
    • /
    • pp.24-31
    • /
    • 2014
  • So many energy saving strategies to realize the low energy house are proposed in these days. Even if the energy saving performances are similar between the strategies, the costs are in abroad ranges. Therefore, the application of the energy saving strategies should be based upon two considerations; one is energy saving performance and the other is the cost. In this study, the decision making method for application of the passive design technologies in the design stage of the low energy apartment house are suggested. By utilizing the result of this study, practitioners can make an effective design alternatives which solve the conflicted values; energy saving and cost.