• Title/Summary/Keyword: Infrastructure Projects

Search Result 604, Processing Time 0.023 seconds

A Feasibility Study to Adopt BIM-based Infrastructure Management System (BIM기반 사회기반 시설물 유지관리 도입을 위한 경제적 타당성 분석)

  • Kim, Jeonghwan;Ji, Seung-Gu;Jeong, Taehyung;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.285-292
    • /
    • 2014
  • BIM (Building Information Modeling) is a new paradigm that includes construction life-cycle, and BIM has become mandatory regulation according to the Public Procurement Service since 2016, which accelerates its application. BIM is now expand from architectural field to infrastructure industry. Through pilot projects, BIM has been challenged with verification process. This trend has affected to maintenance and operation (M&O) phase of construction life-cycle. Advanced country has already published their research and result with feasibility study and guidelines. In this paper, we conduct the feasibility study to adopt BIM-based infrastructure management system. Bridges and tunnels were selected as application target, and benefit/cost ratio were used. The result shows that BIM-based infrastructure management system is feasible when the level of detail is more than "Medium" in bridge, and "High" in tunnel.

Development of a Verification and Certification Method of Green Infrastructure and Low Impact Development Technologies (그린인프라 및 저영향개발 기술의 검증 및 인증 기법 개발)

  • Shin, Hyun Suk;Park, Jong Bin;Lee, Jae Hyuk
    • Ecology and Resilient Infrastructure
    • /
    • v.3 no.2
    • /
    • pp.92-99
    • /
    • 2016
  • This study developed a verification and certification method of technologies of green infrastructure (GI) and low impact development (LID) that gained interest recently. The outdoor testbed used in this study consisted of a building type, a road type, a parking lot type, a rain garden type and a bioretention type. Indoor test facilities were ready for testing using hydrology efficient analysis, pavement and soil analysis and water environment analysis. The development of outdoor and indoor test facilities were used to certify the efficiency of GI & LID technologies, and this was expected to contribute to the activation of the related projects by providing reliable data for the application of GI & LID techniques.

Novel System Modeling and Design by using Eclectic Vehicle Charging Infrastructure based on Data-centric Analysis (전기차 충전인프라 및 데이터 연계 분석에 의한 시스템 모델링 및 실증 설계)

  • Kim, Hangsub;Park, Homin;Jeong, Taikyeong;Lee, Woongjae
    • Journal of Internet Computing and Services
    • /
    • v.20 no.2
    • /
    • pp.51-59
    • /
    • 2019
  • In this paper, we analyzed the relationship between charging operation system and electricity charges connected with charging infrastructure among data of many demonstration projects focused on electric vehicles recently. At this point in time, due to the rapid increase in demand for the electric charging infrastructure that will take place in the future, we can prepare for an upcoming era in the sense of forecasting the demand value. At the same time, demonstrating and modeling optimized system modeling centering on sites is a prerequisite. The modeling based on the existing small - scale simulation and the design of the operating system are based on the data linkage analysis. In this paper, we implemented a new optimized system modeling and introduced it as a standard format to analyze time - dependent time - divisional data for each vehicle and user in each point and node. In order to verify the efficiency of the optimization based on the data linkage analysis for the actual implemented electric car charging infrastructure and operation system.

Policy assessment of Agricultural Infrastructure Improvement Project for Preliminary Feasibility Study - Multipurpose Rural Water Development Project in Pangyo District - (농업생산기반정비사업의 예비타당성조사 정책효과 분석 - 판교지구 다목적 농촌용수개발사업을 중심으로 -)

  • Kim, Soo-Jin;Bae, Seung-Jong;Yoo, Seunghwan;Kim, Yoonhyung;Yoon, Sungeun;Kim, Jeonghoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.1
    • /
    • pp.21-28
    • /
    • 2021
  • Since 2001, the Pangyo district multipurpose rural water development project has been promoted as a new target project for stable supply of agricultural water and improvement of the living environment of rural areas in Seocheon-gun. Detailed data analysis and logic must be reinforced, focusing on the items reorganized by the reorganization of the preliminary feasibility study. The purpose of this study is to promote the smooth promotion of projects by conducting a policy effect assessment following the reorganization of the preliminary feasibility study system. This study conducted a policy assessment of agricultural infrastructure improvement project for preliminary feasibility study. The policy assessment is divided into three parts: project implementation conditions, policy effects and special assessments. The newly established policy effect is to assess the job effects, living conditions impact, environmental evaluation, and safety evaluation that contribute to the quality of life. Sixteen policy assessment items were selected and evaluated quantitatively and qualitatively. The results of the study are expected to provide basic data for the comprehensive judgment of the preliminary feasibility study of agricultural infrastructure improvement project in the future.

Going Abroad for Urban Management Projects: A Case Study of Kuwait New Town (도시관리사업의 해외 진출방안 연구: 쿠웨이트 신도시를 대상으로)

  • Lee, Sangheon;Jeong, Yeun-Woo
    • Land and Housing Review
    • /
    • v.13 no.2
    • /
    • pp.1-15
    • /
    • 2022
  • This study reviews urban infrastructure and housing management in Kuwait to establish a strategy for going abroad in an urban management sector after the construction of the Kuwait New Town. This study reviews legal systems and governance related to urban infrastructure and housing management as well, offering implications that are collated from international and Korean case studies. By doing so, this paper proposes a governance structure for urban infrastructure and housing management along with key agendas for local institutional improvements. This study suggests that the establishment of a legal system equivalent to the Korean Multi-family Housing Management Act is a key to institutional improvements. The (tentatively entitled) 'Housing Management Act' is proposed to specify the scope and the ways of management in mandatory management subject to local conditions. The direction of going abroad, such as the management scope and the implementation system, discussed in this study can be used as a reference when expanding into other countries in the Middle East that have similar institutional environments to Kuwait in urban infrastructure and housing management.

A Study on Compute of Freezing Depth through Frost Damage Investigation in Gangwon Region (강원지역 동상 피해조사를 통한 동결심도 산정 연구)

  • Seungwoo Ahn;Beomsu Moon;Woocheol Jeong;Songhee Suk;Song Choi;Yongseong Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.97-107
    • /
    • 2023
  • This study analyzed the causes of frost damage and freezing depth for concrete ballast sites in the Gangwon mountainous area, which has a high freezing index, and considered the equation for freezing depth in concrete roadbeds. Comparing the freezing depth tendencies of concrete roadbeds in the Gangwon mountainous area and Gangwon area, it was found that the freezing depth of concrete roadbeds was higher than that of the Gangwon area when the freezing index was less than 400. However, in sections with a freezing index greater than 400, the freezing depth was higher in the Gangwon area than in the concrete roadbeds. This study proposed an equation for computing the freezing depth in the Gangwon area to provide basic data for establishing preventive measures against frost damage during railway and road construction projects in the Gangwon region.

A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City (스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로)

  • Sang-Ho Lee;Hee-Yeon Jo;Yun-Hong Min
    • The Journal of Bigdata
    • /
    • v.8 no.1
    • /
    • pp.83-97
    • /
    • 2023
  • Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.

Performance Indicator and its Application for Evaluation of Construction Infrastructure in North Korea (북한 건설 인프라의 적정 수준 평가를 위한 성능지표 개발 및 적용 연구)

  • Kim, Minju;Kim, Sangyup;Oh, Sangmin;Cho, Hunhee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.62-72
    • /
    • 2019
  • Future prospects for the North Korean construction market created by reunification of the Korean Peninsula has consistently been recognized as highly promising. Although rehabilitation projects of the deteriorating construction facilities in North Korea are expected to serve as new source of growth engine to South Korea in future, the status quo of each infrastructure in the North are described verbosely with signs of subjective translation. There has been limited approach on depicting the condition and performance of the North Korean facilities based on quantitative and systematic approach. Thus, this study has been conducted under a twofold purpose. First, this study proposes a performance indicator for identifying the status quo of the major construction facilities in North Korea based on a quantitative approach. Second, this study applies the developed indicator to visualize the results on the conditions of each facility in the form of a report card. This expected to serve as a basis on determining the appropriate level of the construction infrastructure in North Korea and estimating the range of rehabilitation projects along with the investment cost.

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.