• Title/Summary/Keyword: Information System Project

Search Result 2,486, Processing Time 0.031 seconds

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

C-PLM: Design and Implementation of a PLM System for Effective Management of Civil Projects (C-PLM: 토목 프로젝트 관리를 위한 PLM 시스템 설계 및 구축)

  • Kang, Hyoung-Seok;Lee, Sang-Seok;Noh, Sang-Do;Lee, Kwang-Myoung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.2
    • /
    • pp.124-135
    • /
    • 2010
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of constructions to design C-PLM system which is a PLM system for effective management of civil project and engineering activities. Also, we implement C-PLM system based on commercial PDM system, and applied it to civil project as case studies.

Toward the Application of a Critical-Chain-Project-Management-based Framework on Max-plus Linear Systems

  • Takahashi, Hirotaka;Goto, Hiroyuki;Kasahara, Munenori
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.3
    • /
    • pp.155-161
    • /
    • 2009
  • We focus on discrete event systems with a structure of parallel processing, synchronization, and no-concurrency. We use max-plus algebra, which is an effective approach for controller design for this type of system, for modeling and formulation. Since a typical feature of this type of system is that the initial schedule is frequently changed due to unpredictable disturbances, we use a simple model and numerical examples to examine the possibility of applying the concepts of the feeding buffer and the project buffer of critical chain project management (CCPM) on max-plus linear discrete event systems in order to control the occurrence of an undesirable state change. The application of a CCPM-based framework on a max-plus linear discrete event system was proven to be effective.

A Design and Implementation of the Web-based Project Learning System (웹 기반의 프로젝트 학습을 위한 시스템 설계 및 구현)

  • Kim, Eun-Jeong;Park, Phan-Woo
    • Journal of The Korean Association of Information Education
    • /
    • v.6 no.1
    • /
    • pp.53-63
    • /
    • 2002
  • The purpose of this thesis is to design and implement an efficient Web- based Project Learning System(WPLS) in particular for the interactive of an elementary school children. The WPLS in this paper has four main parts ; user interface, learner module, administrator module and database. This system was implemented in accordance with the project themes solving learning processes. So the learner module consists of five steps ; project theme proposal, project plan, project execution, web-publishing, and project test. WPLS can improve student`s ICT using ability and academic achievement.

  • PDF

A Study on the Establishment of Reference Linking System for National R&D Information (국가 R&D정보 참조연계서비스 시스템 구축에 관한 연구)

  • Kwon, Lee-Nam;Kim, Jae-Soo
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.172-177
    • /
    • 2007
  • Reference linking based on a identification system is being widely used both domestically and overseas. National R&D information contains all information related to the R&D programs such as the output and equipment information resulting from the participant and project information. The reference linking service enables the user to freely look up output of a certain program, participant of a project, equipment information from the project or participant and all other information that originates from a R&D project without having to search for it. The reference linking service in the area of national R&D will enable the linking of heterogeneous information produced at different sources.

  • PDF

A Methodology for Estimating Optimum Hardware Capacity E-learning System Development (E-러닝시스템 구축 프로젝트의 적정 하드웨어 산정방법론 연구)

  • Jung, Ji-Young;Baek, Dong-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.49-56
    • /
    • 2011
  • Estimating optimum hardware capacity of an e-learning system is very important process to grasp reasonable size of designing technique architecture and budget during step of ISP(information strategic planning) and development. It hugely influences cost and quality of the whole project. While investment on information system hardware has been continuously increased, there was no certified hardware capacity estimating method in e-learning system development. A guideline for hardware sizing of information systems was established by Telecommunication Technology Association in 2008. However, the guideline is not appropriate for estimating optimum hardware capacity of an e-learning system because it was designed to provide general standards for estimating hardware capacity of various types of projects. The purpose of this paper is to provide a methodology for estimating optimum hardware capacity in e-learning system development. To develop the methodology, this study, first of all, analyzes two e-learning development projects, in which the guideline was applied to estimate optimum hardware capacity. Then, this study finds out several key factors influencing on hardware capacity. Finally, this study suggests a methodology for estimating optimum hardware capacity of an e-learning system, in which weights for the factors are determined through AHP analysis.

The Development of Business Information System based on BPS for Urban Regeneration Projects (BPS기반의 도시재생사업 업무정보 시스템 구축)

  • Kim, Il-Woo;Seo, Jae-Pil;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.3-13
    • /
    • 2012
  • Urban area has caused decline of commercial function and infrastructure because of unorganized urban development, and urban regeneration projects have appeared since 2000s in order to solve urban problems. Because urban regeneration projects have a complexation of various use, the complicated business process and unsystematic conduction work, project stakeholders are suffering from problem in conducting project. Therefore, this study suggested the necessity of business system for urban regeneration projects with analyzing situations and stakeholders. Also, this study classified business information through development of BPS in order to make information system of business process in the urban regeneration project and evaluated it after realization for information system based on BPS of urban regeneration projects. Project stakeholders will be systematically provided information about urban regeneration projects through this system and it is expected to accomplish urban regeneration projects effectively.

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

A Study on the Stratege for Intergrating National Geographic Information System and National Very High-speed Communication Network (국가지리정보시스템과 초고속 정보통신망의 연계전략에 관한 연구)

  • 유근배;황철수;구자용;오충원
    • Spatial Information Research
    • /
    • v.5 no.1
    • /
    • pp.61-75
    • /
    • 1997
  • National Geographic Information System(NGIS) should be designed on the assumption that geographic data collected by each national organization should be integrated into geographic database systemically. To achieve this object, NGIS database would be better connected to National Very High-Speed Communication Network. In the process of research, some problems related to Korean NGIS are found. These are standardization, compatibility, extension, issue of making and opening digital map, and issue related to land information. So, it is required that pilot project apply National Geographic Information System in terms of National Very High-Speed computer network project. This project is to contain two main theme building of physical network and special management of network which is related with NGIS.

  • PDF

The Effect of Project Complexity, Team Members' Structure, and Process Index on Efficiency of System Integration Projects

  • Hong, Han-Kuk;Park, Chul-Jae;Leem, Byung-Hak
    • Journal of information and communication convergence engineering
    • /
    • v.6 no.3
    • /
    • pp.323-326
    • /
    • 2008
  • Data Envelopment Analysis (DEA) is a theoretically sound framework for performance analysis that offers many advantages over traditional methods such as performance ratios and regression analysis. Largely the result of multidisciplinary research during the last three decades in economics, engineering and management, DEA is best described as an effective new way of visualizing and analyzing performance data. Besides, overseas information technology companies have aggressively tried to enter the domestic market. In the age of globalization and high competition, it is imperative that the system integration (SI) companies need to introduce the performance evaluation models of SI projects, including Capability Maturity Model and Software Process Improvement and Capability Determination, to gain a competitive advantage. Therefore, it makes our research regarding evaluation of SI projects very opportune. The purpose of the study is not only to evaluate efficiency of each project by DEA but also to gain insight into various factors such as project complexity, team members' man-months structure, and process index(project management index) that link to the projects performance.