• Title/Summary/Keyword: Information Lead Time

Search Result 790, Processing Time 0.032 seconds

Energy-aware Management in Wireless Body Area Network System

  • Zhang, Xu;Xia, Ying;Luo, Shiyan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.5
    • /
    • pp.949-966
    • /
    • 2013
  • Recently, Wireless Body Area Network (WBAN) has promise to revolutionize human daily life. The need for multiple sensors and constant monitoring lead these systems to be energy hungry and expensive with short operating lifetimes. In this paper, we offer a review of existing work of WBAN and focus on energy-aware management in it. We emphasize that nodes computation, wireless communication, topology deployment and energy scavenging are main domains for making a long-lived WBAN. We study the popular power management technique Dynamic Voltage and Frequency Scaling (DVFS) and identify the impact of slack time in Dynamic Power Management (DPM), and finally propose an enhanced dynamic power management method to schedule scaled jobs at slack time with the goal of saving energy and keeping system reliability. Theoretical and experimental evaluations exhibit the effectiveness and efficiency of the proposed method.

Blood Lead Concentration and Hypertension in Korean Adults Aged 40 and Over According to KNHANES IV (2008) (40세 이상의 한국성인의 혈중 납 농도와 고혈압 - 2008년 국민건강영양조사를 바탕으로 -)

  • Kim, Sun-Young;Lee, Duk-Hee
    • Journal of Environmental Health Sciences
    • /
    • v.37 no.6
    • /
    • pp.418-428
    • /
    • 2011
  • Objectives: The purpose of this study was to examine the cross-sectional relationship between low blood lead levels and increasing blood pressure among Korean adults using a nationally representative sample of the Korean population: the Korea National Health and Nutrition Examination Survey (KNHANES) 2008. Methods: A total of 918 subjects aged 40 and older and not currently being treated for hypertension participated in this study. Information about age, gender, smoking status, alcohol consumption, education level, and the use of anti-hypertensive medication was collected. The blood pressure was defined as the mean of the second and the third measurements after three time measurements. Lead levels were determined by an analysis of blood samples. Multiple linear and logistic regression analyses were implemented after adjusting for covariates including age, gender, educational level, smoking status, alcohol consumption, and BMI. Results: This study showed that the average differences in systolic and diastolic blood pressure comparing the lowest to highest quintile of blood lead were 4.33 mmHg (95% CI, 0.66-8.00; p for trend = 0.027) and 2.66 mmHg (95% CI, 0.26-5.06; p for trend = 0.021), respectively. After multivariate adjustment for covariates, the prevalence odds ratio (POR) of subjects in the highest quintile was associated with a 1.70-fold increase in the risks of hypertension (95% CI, 0.83-3.49; p for trend test = 0.112) over those in the lowest quintile of blood lead concentration, However, it was not statistically significant. Conclusions: This study provided evidence for an association between low- levels of blood lead and elevations in blood pressure and risk for hypertension in the general population of Korea.

Discovery of Association Rules Base on Data of Time Series and Quantitative Attribute (시간적 관계와 수량적 가중치 따른 연관규칙 발견)

  • 양신모;정광호;김진수;이정현
    • Proceedings of the IEEK Conference
    • /
    • 2003.11b
    • /
    • pp.207-210
    • /
    • 2003
  • In this paper, we explore a new data mining capability that is based on Quantitative Attribute and Time Series. Our solution procedure consists of two steps. First, We derive an algorithm to contain the Quantitative Attribute into a set of candidate item. Second, We redefine the concepts of confidence and support for composite association rules. It is shown that proposed methode is very advantageous and can lead to prominent performance improvement.

  • PDF

A Generalized MLE of the Process Change Point

  • Lee Jaeheon;Park Changsoon
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.436-441
    • /
    • 2004
  • Knowing the time of the process change could lead to quicker identification of the responsible special cause and less process down time, and it could help to reduce the probability of incorrectly identifying the special cause. In this paper, we propose a generalized maximum likelihood estimate. (MLE) of the process change point when a control chart with variable sample size (VSS) scheme signals a change in the process mean, and evaluate the performance of this estimator when it mi used with a VSS EWMA chart.

  • PDF

A Study on the Delivery Policy of Internet Bookstores (인터넷 서점의 배송정책에 관한 연구)

  • Kim, Ji-Pyo;Hong, Soon-Hyuk
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.33-38
    • /
    • 2003
  • In this paper we study the delivery policy of internet bookstores and recommend the improved policy to increase customer satisfaction and sales revenue. We classify customers into two, the price-sensitive and the delivery time-sensitive, and develop a new shipping method, the unhurried shipping, for the price-sensitive who are reluctant to pay shipping fee for the small purchase but willing to wait extra time for the ordered goods. The customers could get discount on shipping fee by the unhurried shipping but have to accept the longer delivery lead-time. We investigate the possible ways to reduce costs with the prolonged delivery time and show that some costs regarding shipmentand inventory could be saved in order to make up for additional shipping costs for the price-sensitive.

A Strategy for Timely Long Running Transactions Management Extended from WS-Transaction (WS-트랜잭션의 확장된 적시적 장기수행 트랜잭션 관리 전략)

  • Qing, Lin;Nasridinov, Aziz;Byun, Jeong-Yong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.763-766
    • /
    • 2011
  • Timely management is an important activity in long running transactions. This can be seen in many Supply Chain scenarios where insufficient time management could lead to expensive compensations. Therefore, effective strategy for timely management in long running transactions is needed. In this paper, we propose our solution to detect and avoid violating deadline based on a comparison strategy of predicted complete time and required deadline. Three approaches are used. Firstly, we build Open Nested Transaction Model (ONTM) where deadline of top-level transactions are managed through a flexible time adjustment of lower level transactions. Secondly, workflow is introduced to WSTransaction framework which supports the algorithm to predict complete time and spot delaying activities. Thirdly, a rule-based coordinator is developed to decide the confirmation or cancelation of participants' ongoing activities. We also discuss a workflow example for implementation.

Discontinuity in GNSS Coordinate Time Series due to Equipment Replacement

  • Sohn, Dong-Hyo;Choi, Byung-Kyu;Kim, Hyunho;Yoon, Hasu;Park, Sul Gee;Park, Sang-Hyun
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.11 no.4
    • /
    • pp.287-295
    • /
    • 2022
  • The GNSS coordinate time series is used as important data for geophysical analysis such as terrestrial reference frame establishment, crustal deformation, Earth orientation parameter estimation, etc. However, various factors may cause discontinuity in the coordinate time series, which may lead to errors in the interpretation. In this paper, we describe the discontinuity in the coordinate time series due to the equipment replacement for domestic GNSS stations and discuss the change in movement magnitude and velocity vector difference in each direction before and after discontinuity correction. To do this, we used three years (2017-2019) of data from 40 GNSS stations. The average magnitude of the velocity vector in the north-south, east-west, and vertical directions before correction is -12.9±1.5, 28.0±1.9, and 4.2±7.6 mm/yr, respectively. After correction, the average moving speed in each direction was -13.0±1.0, 28.2±0.8, and 0.7±2.1 mm/yr, respectively. The average magnitudes of the horizontal GNSS velocity vectors before and after discontinuous correction was similar, but the deviation in movement size of stations decreased after correction. After equipment replacement, the change in the vertical movement occurred more than the horizontal movement variation. Moreover, the change in the magnitude of movement in each direction may also cause a change in the velocity vector, which may lead to errors in geophysical analysis.

The Effectiveness of Decision Support System for the Supplier Selection in e-Marketplace: A Case Study

  • Park Hae-Yeon;Lee Zoonky;Lim Sung-Il;Lee Sang-Goo
    • Management Science and Financial Engineering
    • /
    • v.11 no.3
    • /
    • pp.79-93
    • /
    • 2005
  • Despite the fact that the sourcing process in B2B e-Marketplaces is one of the most important tasks, the evaluation and selection process of suppliers have been ad-hoc based and mainly dependent on the experience of sourcing managers' subjective knowledge. To remedy the problem, we developed a decision support System (called Wise - I) that helps sourcing managers evaluate suppliers in a more systematic way. The system reflects company's strategy and know-how by adopting company enforced weighted scores for different factors and employing a more scientific method of considering factors other than price and on-time delivery rate, utilizing the AHP method. This paper reports the effectiveness of the system as well as the detailed description of the system. To investigate the effectiveness of the system, we collected information through interview and questionnaire survey. The information was also augmented through the firm key index system, which monitors average delivery lead time and on-time delivery rate. The result indicates that the system leads to the efficiency of purchasing section and the transparency of buying process, therefore reduces delivery time and cost.

A Study on secure authentication system using integrated authentication service

  • Lee, Hyung-Su
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.2
    • /
    • pp.59-63
    • /
    • 2017
  • Recently, Certificate has been loosed 100 times in a four years as Phising or hacking. The service that use certificate in financial services occurs practical and secure issues. Therefore, the Korea government abolished the mandatory system used in the certificate service. However, they did not provide a replacing method for a certificate. And is not to fill the gaps of the certificate with one time password or secure card. Therefore this paper is propose the alternative method with total authentication service, that is lead the more secure electronic commercial.

Statistical Interrelationships of Job Competition between Generations

  • Kim, Tae-Ho;Jung, Jae-Hwa
    • The Korean Journal of Applied Statistics
    • /
    • v.25 no.3
    • /
    • pp.377-387
    • /
    • 2012
  • Job competition among generations has become an important social issue that has yet to be studied from an academic viewpoint. This study performs statistical tests to investigate the interrelation of employment among generations using seasonally adjusted monthly time series data. Employment by generations is not found to be strongly interrelated, even if the employment of 30-year-olds appears to affect those of 40-yearolds in some tests.