Kim, Byungsung;Lim, Seokhwa;Lee, Sangjin;Baek, Jongseok;Kim, Jaemoon
Journal of Korean Society on Water Environment
/
v.36
no.2
/
pp.109-115
/
2020
Recently, since impervious areas have increased due to urban development, the water cycle system of urban watersheds has been destructed. Hence, researches on LID (Low Impact Development) technique have been conducted to solve such problems environmentally. In order to verify suitability with the scale and arrangement of LID technique, the runoff reduction effect of the LID technique should be analyzed per small watershed unit. In this study, pre-post difference of the runoff by applying the LID was estimated using the rational method and rainwater treatment capacity equation. As a result, the runoff before and after the application of LID were estimated as 22,533.5 ㎥ and 14,992.1 ㎥, respectively. In addition, rainfall-runoff simulations were carried out using SWMM to evaluate the efficiency of the LID technique. The SWMM simulation results showed that the runoff before and after the application of LID were 21,174 ㎥ and 15,664 ㎥, respectively. Based on the results of the two methods, the scale and arrangement of the LID technique were revised in order to maximize the effect of the water cycle improvement. Rainfall-runoff simulations were carried out using the SWMM with the revised LID techniques. As a result, despite 34.8 % reduction of pervious pavement area, the rate of runoff reduction increased by 2.1 %. These results indicate that designing the scale and arrangement of LID technique, while considering the total amount of inflow entering into each LID techniques, is essential to effectively achieve the goals of runoff reduction in urban development.
In this study, the RDII impact on sewer designing in the upstream monitoring area (A site) was considered. Based on the long-term (1/1/2011~12/31/2011) rainfall and flow data consisting of 10-min interval sampling in the nearby design area (B site), the maximum RDII/DWF ratio was selected. The sewer network system at B site was evaluated by the Manning equation. Scenario 1 considering the hourly maximum flow with respect to the flow velocity showed that none of the sewer pipes satisfied the minimum flow velocity condition (0.6 m/s), and 40 pipes did not achieve half of the velocity condition. In scenario 2 considering I/I, 1 the pipes satisfied 0.6 m/s, and 35 pipes showed 0.3 m/s. Scenario 3 reflected the effect of RDII. Velocities in 26 pipes were less than 0.3 m/s, and 4 pipes satisfied the velocity condition. With respect to the allowance rate, 17 pipes were shown to have more than 99%, and none of the pipes satisfied less than 95% of the allowance rate in scenario 1. In scenario 2, 17 Ed: Per the Table pipes showed more than 99% and one pipe showed less than 95%. In scenario 3, 16 pipes showed more than 99% of the allowance rate, and 19 pipes showed less than 95%. Based on these results, it is predicted that deposition would occur due to the slow flow velocity; however, capacity would not be a problem.
Lee, Jeong-Young;Kang, Chang-Guk;Gorme, Joan B.;Kim, Soon-Seok;Kim, Lee-Hyung
Journal of Wetlands Research
/
v.13
no.2
/
pp.199-208
/
2011
Scarcity of water worldwide, increasing greenhouse gas emissions, increased energy consumption due to the Earth is threatened. Existing in the process of urban planning and development of forests, rivers and other natural ecosystems have been destroyed and that there was increased impervious pavement. Impervious pavement increase water circulation system to destroy the natural and urban water retention, infiltration and decreased evaporation. Nonpoint source pollution(NPS) occurs when rainfall impervious pavement and appeal directly to the river water inflow is adversely impacts of the situation. In this study, rainfall occurs impervious pavement NPS pollution reduction and temperature increase due to the increase in urban areas, and to solve heat island phenomenon is to develop small HSSF constructed wetland technology. The small HSSF constructed wetland sedimentation, filtration, adsorption, absorption by vegetation, including such mechanisms. Techniques for verification of the pilot-scale test was conducted. In the future domestic urban heat island phenomenon and restore the natural water cycle for the facilities will be used as a basis to develop.
Jang, Young Su;Kim, Mi Eun;Baek, Jong Seok;Shin, Hyun Suk
Journal of Korea Water Resources Association
/
v.47
no.6
/
pp.513-522
/
2014
Climate change and urbanization have affected a increase of peak discharge and water pollution etc. In a view of these aspects, the LID(Low Impact Development) technology has been highlighted as one of adjustable control measures to mimic predevelopment hydrologic condition. Many LID technologies have developed, but there is a lack of studies with verification of LID technology efficiency. Therefore this study developed a rainfall-runoff simulator could be possible to verify LID technology efficiency. Using this simulator, this study has experimented the rainfall verification through the rainfall distribution experiment and the experiment to show the relation between inflow and effective rainfall in order to sprinkle the equal rainfall in each unit bed. As a result, the study defined the relation between allowable discharge range and RPM by nozzle types and verified the hydrologic cycle such as the relation between infiltration rate, surface runoff and subsurface runoff at pervious area and impervious area through the rainfall-runoff experiment.
Proceedings of the Korean Geotechical Society Conference
/
2008.10a
/
pp.1559-1570
/
2008
A new grouting material named 3S is developed that can be used effectively for reinforcing cut surface of weathered rock in processing of tunneling. The new material is composed of mostly micro slag cement and general Portland cement, but the material is foundered again upto $8,000\;cm^2/g$ of specific area so that it can be easily infiltrated in to the ground. For verifying technical and engineering quality of the material several laboratory tests with specially designed test apparatus were performed including compression tests, infiltration tests and resonant column tests. It was verified that the newly developed grouting material at early age of 1 or 3 days generates 200~1500% higher compressive strength and 400~560% larger elastic modulus than those of the LW(LW-1) or micro-cement(LW-2) grouting materials in the market. In addition, the new 3S grouting material could be so easily infiltrated into the model ground in the lab tests that it produces 4 times larger grouted roots in average compared to the usual water glass type grouting material(LW-1). Thus, it can be said that the newly developed grouting material can effectively prevent inflow water into tunnel compared to LW grouting materials.
Stormwater runoff containing considerable amounts of pollutants such as particulates, organics, nutrients, and heavy metals contaminate natural bodies of water. At present, best management practices (BMP) intended to reduce the volume and treat pollutants from stormwater runoff were devised to serve as cost-effective measures of stormwater management. However, improper design and lack of proper maintenance can lead to degradation of the facility, making it unable to perform its intended function. This study evaluated an infiltration trench (IT) that went through a series of maintenance operations. 41 monitored rainfall events from 2009 to 2016 were used to evaluate the pollutant removal capabilities of the IT. Assessment of the water quality and hydrological data revealed that the inflow volume was the most relative factor affecting the unit pollutant loads (UPL) entering the facility. Seasonal variations also affected the pollutant removal capabilities of the IT. During the summer season, the increased rainfall depths and runoff volumes diminished the pollutant removal efficiency (RE) of the facility due to increased volumes that washed off larger pollutant loads and caused the IT to overflow. Moreover, the system also exhibited reduced pollutant RE for the winter season due to frozen media layers and chemical-related mechanisms impacted by the low winter temperature. Maintenance operations also posed considerable effects of the performance of the IT. During the first two years of operation, the IT exhibited a decrease in pollutant RE due to aging and lack of proper maintenance. However, some events also showed reduced pollutant RE succeeding the maintenance as a result of disturbed sediments that were not removed from the geotextile. Ultimately, the presented effects of maintenance operations in relation to the pollutant RE of the system may lead to the optimization of maintenance schedules and procedures for BMP of same structure.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.5
/
pp.119-128
/
2008
Sewer rehabilitation is performed to improve the problem for urban drainage sewer system recently. However the data for the sewer system is not stored enough so that the sewer system is difficult to be managed systematically. In this study, a maintenance management system for urban drainage system is developed to store the data efficiently and manage the system systematically. In the developed system, a hydraulic and hydrologic analysis module is included to test the carrying capacity of a sewer pipe and estimate the amount of combined sewer overflows. The I/I and superannuation evaluation module is included in this system. The module distribute the total inflow/infiltration observed at the several sampling points in a drainage area to the individual pipes of the entire sewer system. Then the superannuation of a sewer pipe is evaluated according to the amount of I/I of the pipe. And in the developed system, the optimal rehabilitation priority module is included to determine the optimal priority and support the decision making for the sewer rehabilitation. The maintenance management system which is developed in this study is constructed by the association with the developed modules and the system is formed as graphical user interface system.
The environmental assessment on the open dumping landfill of small scale which was situated in local small city was carried out to reuse the landfill site as the residental, commercial and other purposes through the analysis of the leachate of landfill, extracted solution from landfill waste. The waste was landfilled at 5.5~8m depth and the covered layer so poor as 20~50cm thickness. The biodegradable organic matters were almost degraded and the result of the leachate of landfill showed that the BOD/COD ratio were measured as 0.079, pH 7.2~7.6, SS 47736mg/L, COD 6193.8mg/L, T-N 596mg/L, and T-P 123.9mg/L respectively. These results were higher than those of extracted solution of landfill waste as the COD and BOD were measured as low values and T-N 7.77mg/L and T-P as 0.20mg/L lower concentrations the landfill appears the maturation phase. As the result of the assessment on the open dumping landfill of small scale, if appears that this landfill is maturation phase and the formation leachate is reduced. If the treatment facility of leachate from landfill and the layer which protects the inflow/infiltration is prepared, it can be safely used as this landfill site.
Journal of Korean Society of Environmental Engineers
/
v.27
no.9
/
pp.911-916
/
2005
In this study, variations of water quality, sediment size and contaminant substances are analyzed at upstream and downstream in sewer systems in order to evaluate the characteristics of wastewater transformation by physico-chemical and biological reactions. The differences of DOC concentration between up and down stream showed the range of $-5.8{\sim}18.6$ from the result of continuous measurement at up and down stream. About 8.4% of DOC concentration was reduced and reduction rate was 2.3 mg/L/km. SS reduction rate was measured by 5.5 mg/L/km, 0.22 mg/L/min from upstream to downstream, which was twice than DOC reduction rate. When pollution load reduction was evaluated considering infiltration/inflow effect, DOC load was eliminated from 1,230 ka/d to 1,167 kg/d by physi-chemical and biological reaction in a sewer and 7.8% of the SS in upstream station was reduced under dry weather condition. The results showed that the characteristics of transformation process of wastewater in sewer should be considered for design and operation of wastewater treatment plant.
Journal of the Korean Society of Hazard Mitigation
/
v.6
no.4
s.23
/
pp.37-47
/
2006
Urban development results in increased runoff volume and flowrates and shortening in time of concentration, which may cause frequent flooding downstream. Flow retardation structures to limit adverse downstream effects of urban storm runoff are used. There are various types of flow retardation measures include detention basins, retention basins, and infiltration basins. In basic planning phase, a number of planning models of detention ponds which decide storage volume by putting main variables were used to design detention ponds. The characteristics of hydrological parameters $\alpha,\;\gamma$ which are used in planning models of detention pond were analyzed. In this study, detention ponds data of Disaster Impact Assessment report at 22 sites were analyzed in order to investigate correlation between characteristic of urban drainage basin parameter and characteristics of detention pond parameter due to urbanization effects. The results showed that storage volume was influenced by peak discharge ratio $\alpha$ more than runoff coefficient ratio $\beta$ and peak discharge ratio $\alpha$ was influenced by runoff coefficient ratio $\beta$ less than regional parameter n. Storage ratio was mainly influenced by duration of design rainfall in the case of trapezoidal inflow hydrograph such as Donahue et al. method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.