• Title/Summary/Keyword: Industry Systematic Risk

Search Result 95, Processing Time 0.025 seconds

A Systematic Approach for Evaluating FMEA of a Service System under Considering the Dependences of Failure Modes (실패유형의 종속성을 고려한 서비스 시스템의 FMEA 평가모델)

  • Oh, Hyung Sool;Park, Roh Gook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.1
    • /
    • pp.177-186
    • /
    • 2014
  • Failure mode and effect analysis (FMEA) is a systematic approach for identifying potential failures before they occur, with the intent to minimize the risk associated with them. It has been widely used in the various manufacturing industries as a solution to reliability problems. As the importance of the service sector is increasing, however, it has been recently extended to some applications in services. Despite these attempts, FMEA cannot be directly applied to the reliability problems in a service industry. Due to the heterogeneity and customer participation in service process, we cannot perfectly prevent service failures. For this reason, we suggest a new risk priority number with three input parameters that consist of severity, probability of occurrence, and recoverability. In this paper, we propose an approach for assessing service risk and service reliability using the service-oriented risk priority number (S-RPN). An example regarding a hypermarket service process is used to demonstrate the proposed approach.

  • PDF

A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

A Development of Integrated Prototype Model for Risk Management of Construction Projects (건설공사의 리스크관리를 위한 통합전산모형 구축)

  • Kim, Chang-Hak;Park, Seo-Young;Kang, In-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.469-480
    • /
    • 2006
  • The results of the study include a computerized system and a systematic process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The methodology for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

Evidence-Based Benefit-Risk Assessment of Medication (근거에 기반한 의약품의 유익성-위해성 평가)

  • Lee, Eui-Kyung
    • The Journal of Health Technology Assessment
    • /
    • v.1 no.1
    • /
    • pp.22-26
    • /
    • 2013
  • Objectives: Balancing benefits and risks through the drug life cycle has been discussed for many decades. The objective of this study was to review the processes and tools currently proposed for benefit-risk assessment of medicinal drugs. It aimed to establish scientific and efficient drug safety management system based on the synthetic analysis of benefit-risk evidence. Methods: We conducted a review of exiting literatures published by regulatory agencies or initiatives. Not only quantitative methodologies but also qualitative method were compared to understand their key characteristics for the benefit and risk assessment of drugs. Results: Recently, benefit-risk assessments have more structured approaches to decision making as part of regulatory science. Regulatory agencies such as European Medicines Agency, FDA have prepared plans to apply benefit-risk assessment to regulatory decision making. Also many initiatives such as IMI (Innovative Medicine Initiative) have conducted research and published reports about benefit-risk assessment. For benefit-risk assessment, four kinds of methods are necessary. Frameworks such as BRAT (Benefit Risk Action Team) framework, PrOACT-URL provide guidance for the whole process of decision-making. Metrics are measurements of risk benefit. The estimation techniques are methods to synthesis and combine evidences from various sources. The utility survey techniques are necessary to explicit preferences of various outcome from stakeholders. Conclusion: There is the lack of widely accepted, validated model for benefit-risk assessment. Nor there is an agreement among academia, industry, and government on methods for the quantitative valuation. It is also limited by available evidence and underlying assumptions. Nevertheless, benefit-risk assessment is fundamental to improve transparency, consistency and predictability for decision making through the structured systematic approaches.

Evaluation on Probability and Intensity of Hazards Exposure by Construction Occupations (건설업 직종별 노출 가능 유해인자 및 노출강도에 관한 평가)

  • Hyunhee Park;Sedong Kim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.3
    • /
    • pp.317-331
    • /
    • 2023
  • Objectives: Construction workers are exposed to various hazardous substances simultaneously. However, little is known about the exposure hazards in construction industry. This study was aimed at identifying the risk of exposure hazards among construction workers. Methods: The expert survey (n=29) was conducted, including construction industry health managers (n=11) and work environment monitoring experts (n=18), on exposure probability, intensity and risk of hazardous substances by construction occupations Results: The exposure hazards of 30 construction occupations were identified and summarized through a literature review and expert survey. The most prevalent hazards were in order of noise, awkward posture, heat/cold, crystalline silica, cement/concrete dust, metal fumes, and volatile organic compounds. The hazards with highest risk score(over seven points) at construction occupations were noise(formwork carpenter, concrete finisher, rebar worker, demolition worker, driller/rock blaster), hazardous rays(welder), heat/cold (earthworks, formwork carpenter, rebar worker, concrete placer, scaffolder), awkward posture(bricklayer, caulker/tile setter, rebar worker) and heavy lifting(bricklayer, rebar worker). Among construction workers, the job types with the highest risk of exposure to carcinogens, and in which occupational cancer has been reported, were in order of stonemason, concrete finisher, rock blaster, welder, insulation installer, painter, scaffolder, plant worker and earthworks in order Conclusions: Systematic research and discussion on occupational disease among construction workers and its various hazardous factors are needed to establish job exposure matrix for facilitating standard for promptly processing the workers' compensation.

Research on the Relationship Between the OHSAS 18000 System Implementation and Competitiveness in Taiwan's Industries

  • Chung, Yi-Chan;Chiu, Chung-Ching;Tsai, Chih-Hung;Hsu, Yau-Wen
    • International Journal of Quality Innovation
    • /
    • v.7 no.3
    • /
    • pp.24-45
    • /
    • 2006
  • In recent years, the labor consciousness is gradually valued. During the process of pursuing sustainable operation, the enterprises treat occupational hazard risk as the waste of cost. The purpose of OHSAS 18000 occupational security and health management system is to systematically establish the business managerial measures in terms of occupational security and calamity prevention. This research proceeded with questionnaire analysis with respect to the relationship between the OHSAS 18000 system implementation and competitiveness in Taiwan's industries. The research result revealed that there was significant relationship between Taiwan firms' execution of OHSAS 18000 system and industry competitiveness. Thus, the enterprises can decide the proper managerial plans according to the result of their own risk evaluation to prevent the happening of accidents and reduce the operational cost. They can thus completely control business occupational hazard risk through "systematic" management.

A Study on Risk Factor Identification by Specialty Construction Industry Sector through Construction Accident Cases : Focused on the Insurance Data of Specialty Construction Worker (건설재해사례 분석에 의한 전문건설업종별 위험요인 탐색 : 전문건설업 근로자 공제자료를 중심으로)

  • Lee, Young Jai;Kang, Seong Kyung;Yu, Hwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.24 no.1
    • /
    • pp.45-63
    • /
    • 2019
  • The number of domestic construction company is expanding every year while the construction workers' exposure to disaster risk is increasing due to technological advancements and popularity of high-rise buildings. In particular, the industry faces greater fatalities and severe large scale accidents because of construction industry characteristics including influx of foreign workers with different language and culture, large number of aged workers, outsourcing, high place work, heavy machine construction. The construction industry is labor-intensive, which is to be completed under given timeline and consists of unique working environment with a lot of night shifts. In addition, when a fixed construction budget is not secured, there is less investment in safety management resulting in poor risk management at the construction site. Taking account that the construction industry has higher accident risk rate and fatality rate, risky and unique working environment, and various labor pool from foreign to aged workers, preemptive safety management through risk factor identification is a mandatory requirement for the construction industry and site. The study analyzes about 8,500 cases of construction accidents that occurred over the past 10 years and identified risk factor by construction industry sector to secure a systematic insight for risk management. Based on interrelation analysis between accident types, work types, original cause materials and assailing materials, there is correlation between each analysis factor and work industry. Especially for work types, there is great correlation between work tasks and industry type. For reinforced concrete and earthwork are among the most frequent types of accidents, and they are not only high in frequency of accidents, but also have a high risk in categories of occurrence.

A Study on the Corporate Portfolio Risk Management for Multinational Construction Company (대형건설업체의 해외건설공사 포트폴리오 리스크 관리에 관한 연구)

  • Han Seung-Heon;Lee Young;Kim Hyung-Jin;Ock Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.68-80
    • /
    • 2001
  • While opportunities for international construction firms have been growing with globalization, the risk of international construction projects is significantly increasing in severity and complexity. However, the traditional risk management approach in the construction industry has maintained a profit focus. In addition, this approach has not considered the overall risk at the corporate level, but rather has focused only on the risk of individuals at the project level. Corporate risk management should be implemented from the initial stages of new project selection. This paper suggests the Multi-criteria Integrated Systematic Analysis as a strategic decision-making tool for international construction contractors. The model integrates the multi-criteria of risk, return, and efficiency to choose the optimal set of new portfolios at the corporate level. This model also introduces the Value at Risk (VaR) concept to the international construction industry to present the total risk at the corporate level. To validate this model, this paper tested an experimental case study using the historical data of a global general contractor.

  • PDF

Allocation of Safety Integrity Level for Railway Platform Screen Door System considering Semi-Quantitative Risk Reduction Factor (반 정량적 리스크 저감 요소를 고려한 철도 승강장 스크린 도어시스템의 안전 무결성 수준 할당)

  • Song, Ki Tae;Lee, Sung Ill
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.156-163
    • /
    • 2016
  • There exists required safety integrity level (SIL) to assure safety in accordance with international standards for every electrical / electronics / control equipment or systems with safety related functions. The SIL is allocated from lowest level (level 0) to highest level (level 4). In order to guarantee certain safety level that is internationally acceptable, application of methodology for SIL allocation and demonstration based on related international standards is required. However, the theoretical and practical study for safety integrity level is barely under way in the domestic railway industry. This research studied not only the global process of SIL allocation to guarantee safety in accordance with international standards for safety related equipment and system, but the quantitative methodology based on international standard and the semi-quantitative methodology as alternative way for SIL allocation. Specifically, the systematic SIL allocation for platform screen door system of railway is studied applying the semi-quantitative methodology in order to save much time and effort compared to quantitative method.

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • Cha Hee Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.