• Title/Summary/Keyword: Industrialization Construction

Search Result 169, Processing Time 0.035 seconds

Research on the Urban Ecological Space Changes under Modern Passive Industrialization Case Study of Zhengzhou City in China

  • Yang, Juntao;Baek, Seungman
    • Architectural research
    • /
    • v.23 no.2
    • /
    • pp.29-37
    • /
    • 2021
  • Early in the communist era, many cities in modern China experienced a special period of passive industrialization during which the construction of urban spaces laid the spatial urban foundation. During this period, the city construction was carried out rapidly under the administrative intervention of the government. The passive industrialization caused by taking economic construction as the center made the city construction deviate from the correct track and resulted in a variety of problems. Focusing on ecological space change, this paper selects Zhengzhou as an example of many similar cities in China, and analyzes the impact of passive industrialization on urban ecological spaces from the perspectives of city scale, city layout and city construction management system. The analysis results reveal that the construction of urban ecological space under the influence of passive industrialization induced a lagging characteristic, led to insufficient integrity of urban ecological space, and placed great pressure on the urban environment. Finally, the paper puts forward some methods to optimize the urban ecological space.

Analysis on Tower Crane Selection in Precast Concretes Structures and its Connection with Precast Rate

  • Guo, Jingjing;Fu, Yan;Wang, Kang;Peng, Zhenyu
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.192-200
    • /
    • 2017
  • With the acceleration of construction industrialization, the buildings that China has adopted the construction of industrialization technology are increasing day by day, and Precast Concrete (PC) Structure technology is one of the main technologies of construction industrialization. Compared with the traditional cast-in-place concrete structure, PC structure is more conducive to shorten the construction period, reduce the number of construction workers and the site construction waste. Nevertheless, PC structure improves the requirements of hoisting machinery in the construction site, and the lay-out and selection of hoisting machinery become an important factor influencing the construction cost. The paper regards the typical tower crane in China as the research object, and establishes the time optimization model for the lifting scheme. The influence of the different precast rate on the selection of the tower crane is analyzed. This paper obtains the time variation of the tower crane under different precast rate, provides a theoretical basis for the design of precast concrete structures under the influence of assembly construction, and lays the foundation for the selection of tower crane under the precast rate.

  • PDF

A Study on Ken Ichiura's Research Activities of 'Dwellings' - Focused on 1930 to 1945 (시포건의 "주택" 분야 연구활동에 관한 연구 - 1930년부터 1945년까지를 중심으로 -)

  • Kim Jin-Mo
    • Journal of the Korean housing association
    • /
    • v.17 no.1
    • /
    • pp.9-17
    • /
    • 2006
  • In the modem society of Japan, specially before and after the World War II, one of the most important problem is socially to build housing of working classes. In those days, Ken Ichiura had been led the dwelling of modem Japanese architecture. He had worked in wide spheres of action like private residence, public housing, collective housing area and urban planning for about fifty years. But until now, because studies on public housing of Japan has been discussed only aspect of architectural design, there was almost no study about Ken Ichiura who acted in practical affairs. So this study aims to consider about the Ken Ichiura's research on dwelling and the relation with the then social circumstance. It was summarized as four details of Ken Ichiura's activities on Dwellings before the end of World War II. First, he proposed half-government-supervised system by economic reason on provision of dwellings. Second, he proposed dry construction system by material and structural reason on economic and stability supply. Third, he proposed standardization and industrialization by economic reason on industrialization form material to construction of industry. And the last, he also proposed standard plan and standard design by economical and mass production supply dwellings during the war.

Considerations about protection of traditional clinical technologies and industrialization plans (전통임상기술의 지적재산권 보호와 산업화 방안에 대한 고찰 -WIPO의 전통지식, 유전자원의 지적재산권 보호 논의에 대한 대응 전략-)

  • Ahn, Sang-Woo;Kim, Hong-Jun;Choi, Hwan-Soo
    • Korean Journal of Oriental Medicine
    • /
    • v.9 no.2
    • /
    • pp.33-43
    • /
    • 2003
  • The international government committee is progressing their agreements about intellectual property protection of traditional knowledge(TK), gene resource(GR), folklore(FL) in WIPO. It is in the course of selection with precedence of TK, GR, FL in WIPO, focused on discussions about listing of TK documents, standardization of DB construction, sharing and profit distribution of GR. We made some plans to deal with agreements in WIPO. These plans consist of 5 subjects which are investigation about intellectual property related laws and systems, study of examination and finding, construction of DB information, development of value evaluation system, development of industrialization system with TK, GR, We suggest preceding details about 5 subjects respectively. It is the character of this plan that patent information DB system of TK, GR is the axis. It is the most important thing in these plans to succeed that we have to have connections with expert groups in order parts and government officials, taking whole supports of government because our traditional medical related study basis is weak.

  • PDF

Construction Process Analysis of Han-Ok for BIM Based Modern Han-Ok Construction Simulation (BIM 기반의 현대식 한옥 시공시뮬레이션 구현을 위한 한옥 공정분석 연구)

  • Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.3-10
    • /
    • 2011
  • Currently, technologies for industrialization and dissemination for Han-Ok are developed actively. Also BIM technologies are actively developed. However, it is difficult to find the research and study cases for construction method and process for Han-Ok. BIM is the technology for managing information with element as a unit for building design, construction and management, and it is closely related to Han-Ok using assembling method for building construction. We analyzed the basic construction processes for IK-Gong and MinDoRi house, typical types of Han-Ok. Also we developed the Work Breakdown Structure of construction process for Han-Ok and suggested the method for construction simulation using BIM. Simple BIM model of Han-Ok which is Ik-Gong type is used for case study. It was possible to link automatically between 3D elements objects and construction activities about 95% in the case study. More studies of construction method for various type of Han-Ok and rules for link between elements and construction activities are required for Industrialization and dissemination of Han-Ok.

A Study on the Eco-City in the center of the city -focused on YongJeonDong in Daejeon City (도심지에서의 생태도시화 방안에 대한 연구 대전광역시 동구 용전동을 중심으로)

  • Cho Young-Jun;Kim Hyun-Ju;Nam Kwan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.177-181
    • /
    • 2005
  • The concept of Eco-city is to protect the city against development, trash, and industrialization. But the sprawl phenomenon of urbanization and industrialization are accompanied by the environment destruction. Therefore the importance and definition of eco-city were suggested. And to restore the urban ecological network, the prototype direction of eco-city at YongJeonDong in DaejeonCity were suggested in this study. It is believed that how to create an eco-city is an artificially developed $\square\square$Yong-Jun Dong$\square\square$ is a pending issue we are faced with situation. Herein lies the necessity of natural environment restoration and creation based on the so-called the Third Ecology

  • PDF

Application of Tilt-Up Construction Method for Building Single-Family house (단독주택의 구조체 공사에 있어 Tilt-up 공법의 현장적용)

  • Jeon, Se Mi;KIm, Myeong Gil;An, Youn-soo;Sho, Kwang-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.136-137
    • /
    • 2015
  • Tilt-up construction is the method that the wall structures are fabricated horizontally on site and placed at specified location using heavy lifting equipment. Tilt-up method generally has several advantages, such as of productivity improvement, labor savings, shortened the construction period the and cost savings. In this study, Tilt-up method is used for wall construction of detached house. Result shores the substantial improvement on construction period. The use of Tilt-up method led construction period reduction of 20%.

  • PDF

Particulate Matter Monitoring System Based on IoT for Construction Sites (IoT 기반의 건설현장 미세먼지 모니터링 시스템 개발에 관한 연구)

  • Kim, Hyunsik;Tae, Sungho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.40-41
    • /
    • 2021
  • Recently, particulate matter(PM) caused by internal factors such as industrialization and urbanization as well as external factors such as Asian dust is a serious problem in Korea. In particular, while the emission due to construction appears to be very serious among the internal factors, it is necessary to manage PM in consideration of the characteristics of construction sites. Accordingly, in this study, a PM management system suitable for construction sites was developed to reduce civil complaints caused by PM and to minimize damage to field workers and nearby residents by supporting the fine dust management system of the state and local governments. The factors to be considered when measuring PM due to the specificity of construction sites were considered, and the system components were developed based on the considerations. As a result, an IoT based construction site PM monitoring system (CPMS) that integrates each component was established.

  • PDF

Feasibility Study on the Construction of a Wood Industrialization Services Center for a Wood Industry Cluster Establishment in Jeollanam-do (전라남도 지역의 목재산업 클러스터 구축을 위한 목재산업화지원센터 설립의 타당성 검토를 위한 연구)

  • An, Ki-Wan;Park, Kyung-Seok;Ahn, Young Sang
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.4
    • /
    • pp.506-514
    • /
    • 2013
  • This study examined the feasibility on the construction of a wood industrialization service center for a wood industry cluster establishment in Jeollanam-do. Construction of the wood industrialization service center is based on a discount rate of 3.5%, an investment period of 4 years, a business operations period of 16 years and an investment cost of 24600 million won; the total amount of the net present value, the cost-benefit ratio and the internal rate of return were assumed to be 2.579 million won, 2.51%, and 10.1%, respectively. In addition, the production inducement coefficient, the induced production effect, the income-induced coefficient, the income inducement effect, the employment inducement coefficient, and the employment inducement effect were estimated 1.4345, 35287 million won, 0.1655, 4000.7 million won, and 0.4665, 1,145 people, in the effects of the wood related industries using the multi-regional input-output model, respectively. Financial independence of operating income to cover its own costs incurred in accordance with the operating project might be practicable.

A Study on the Automatic Design of Unit Modular House Using Component and Unit DB (부품 및 유닛 DB를 이용한 유닛 모듈라 주택의 설계자동화 연구)

  • Lim Seok-Ho;Kim Soo-Am;Hwang Eun-Kyung
    • Journal of the Korean housing association
    • /
    • v.17 no.3
    • /
    • pp.41-49
    • /
    • 2006
  • Precast concrete apartments were main stream of domestic industrialized housing around 90's, and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel stud and unit box have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the open system basis. In this study, the design standard for unit house will be established coping with the established preparing standard for design specifications defined by architectural law and promotion law of housing construction. That is for design standard of industrialized private housing on the open system basis. This study attempts to propose the design automation, with the method of unit construction of which the rate of pre-fabrication is the biggest, that can cope with the demand of user on the basis of open-system. Ticky-tacky is the biggest technical problem in suppling industrialization housing. Therefore, we will suggest a basic plan for design automation of unit modular housing which can raise the productivity of industrialization housing by applying open system, utilized by DB of component and unit, and solve the problem concerned about ticky-tacky.