Proceedings of the Korean Institute of Building Construction Conference
/
2018.11a
/
pp.69-70
/
2018
With increased interest in the Fourth Industrial Revolution, there is also a growing interest in the innovation of college education. In this regard, this study aims to develop a learning model for building construction to nurture architectural engineers needed in the era of the Fourth Industrial Revolution. To this end, it analyzed the previous studies on the recent innovations in engineering education. Among the educational innovation methods presented in the previous research, a new learning model was derived by using the most suitable method for the building construction eduction. The derived learning model is a building construction learning model applying team-based learning and flipped learning. The learning model proposed in this study was developed as a learning method to nurture engineers needed in the future. Therefore, it is expected that this model can be utilized in the eduction of architectural engineering at universities in Korea.
International conference on construction engineering and project management
/
2005.10a
/
pp.429-436
/
2005
This paper reflects on the ergonomical criteria for a humane working atmosphere in industrial buildings while respecting and paying close attention to the physical, mental, and stressful demands of the work environment. It describes effective construction codes and standards of practice and their importance in ensuring a safe environment for working people. Also addressed are the objectives for a productive work environment and its organization. The paper considers the significance of a proper working environment, the use of dangerous working materials, the use of proper ventilation, climate, and lighting to ensure that the productivity of the enterprise is met with common goals shared between employer and employee. The connection between the legal foundation and the design of industrial construction is the focus of this paper. It shows that the planning and executive persons are obliged to observe the relevant construction laws and regulations including standards and codes of practice. Additionally discussed are the possible solutions and consequences for development in the productional, constructional, and ergonomical fields of design.
International conference on construction engineering and project management
/
2017.10a
/
pp.332-336
/
2017
The field of construction and transportation R&D has been increased and improved wih the integration into the ICT. With the rapid trend changes like the Fourth Industrial Revolution, new direction and solution of R&D policy is being explored to prepare for the convergence era with other diverse research areas. In order to present new direction, it is necessary to analyze the external environment influencing construction and transportation field. In this regard, this study analyzes the science and technology policy plan and goal in Korea. In conclusion, through the policy analysis, this study suggests new direction of construction and transportation R&D in Korea.
Journal of Korean Society of Industrial and Systems Engineering
/
v.45
no.2
/
pp.37-47
/
2022
The Act on the Punishment of Serious Accidents to Prevent Large-scale Disasters, including Ferry Sewol and Taean Thermal Power Plant, passed the National Assembly on January 8, 2021, and has been in effect since January 27, 2022. However, the law, in which the representative of the headquarters is unlimitedly responsible for each worker's accident, is somewhat unreasonable at a time when a company owns dozens to hundreds of construction sites due to the nature of the construction industry. I agree with the purpose of enacting the law to reduce chronic serious accidents at construction sites, but it is necessary to carefully reconsider the implementation of the law in that punishment alone cannot achieve industrial safety. Previous studies focused on revising the Occupational Safety and Health Act, but there are few studies on the impact on the construction industry after the implementation of the Serious Accident Act. Therefore, this study attempts to derive problems related to the application of the Serious Accident Act and present improvement measures. To this end, after analyzing previous studies, SWOT analysis was performed by applying the Delphi method to derive strengths, weaknesses, opportunities, and threats. In addition, the results of two surveys of safety experts such as public institutions, academia, and companies were reflected, and its countermeasures were presented as follows. S/O strategy: establishing on-site execution capabilities of health and safety management system; W/O strategy: expanding legal and system execution checks; S/T strategy: establishing a risk response system; W/T strategy: expanding consulting by external specialized institutions
Kim, Dae Ji;Chung, Jintai;Lee, Ho Yeon;Lee, Chang Sun;Song, Chang Heon
Journal of Drive and Control
/
v.19
no.4
/
pp.77-84
/
2022
The aims of this study was to estimate transfer force delivered to cone crusher housing and contribution of force transmission. The rock crushing condition caused vibrations in the cone crusher housing, which were experimentally measured, and frequency response functions (FRF) were also found through modal impact tests. Vibration data and frequency response functions were applied to the transfer path analysis (TPA) model. Next, transfer forces delivered to the cone crusher housing were quantified via the TPA method. Contribution of force transfer was also analyzed based on force estimation results. Finally, this study describes basic concepts and components of the TPA method and reviews its applicability to rotating machinery that experiences impact vibrations and forces.
Journal of the Korea Institute of Building Construction
/
v.13
no.3
/
pp.291-305
/
2013
This paper presents the continuous hoop reinforcement method as a means to overcome the difficulty of rebar construction due to the seismic detail of lateral reinforcement. Because the continuous hoop has no seismic hook, and there is less interference during the rebar work, rebar quantities and construction time can be reduced. Since the details of column and beam continuous hoops are different from those of conventional lateral reinforcements, the construction method should be developed through mock-up tests. The length of the beam mock-up is 8m and the section size is $500mm{\times}700mm$, the height of the column mock-up is 2.8m and 4m, and the section size is $800{\times}800mm$. The length and the size are determined based on the elements that are generally used in reinforced concrete basement parking lots and office buildings. The results of the mock-up test showed that the quantities of rebar could be reduced by 20% and the time could be reduced by up to 40% compared with conventional lateral reinforcements.
Paul Wrigley;Paul Wood;Daniel Robertson;Jason Joannou;Sam O'Neill;Richard Hall
Nuclear Engineering and Technology
/
v.56
no.1
/
pp.222-232
/
2024
New modular factory-built methodologies implemented in the construction and industrial plant industries may bring down costs for modular reactors. A factory-built environment brings about benefits such as; improved equipment, tools, quality, shift patterns, training, continuous improvement learning, environmental control, standardisation, parallel working, the use of commercial off shelf equipment and much of the commissioning can be completed before leaving the factory. All these benefits combine to reduce build schedules, increase certainty, reduce risk and make financing easier and cheaper.Currently, the construction and industrial chemical plant industries have implemented successful modular design and construction techniques. Therefore, the objectives of this paper are to understand and analyse the state of the art research in these industries through a systematic literature review. The research can then be assessed and applied to modular reactors.The literature review highlighted analysis methods that may prove to be useful. These include; modularisation decision tools, stakeholder analysis, schedule, supply chain, logistics, module design tools and construction site planning. Applicable research was highlighted for further work exploration for designers to assess, develop and efficiently design their modular reactors.
Journal of the Korean Applied Science and Technology
/
v.28
no.4
/
pp.418-430
/
2011
This study was conducted to provide an improving direction of K-EIP(Korean Eco-Industrial Park) construction project by company's voluntary participation. For this purpose, we investigated and analyzed the status of domestic eco-industrial park projects from various literatures, foreign EIP cases and FGI(Focus Group Interview). The key issues to construct a voluntary K-EIP are the lack of experts, the difficulties of commercialization financing, and so on. In this study, therefore, the programs to resolve these problems in K-EIP construction project were suggested at the level of government and corporation.
Since most of the industries have adopted automation system, the industrial disaster has been declined sharply. Also automation system has offered many benefits such as productivity and assured quality. However, the construction industry is still relying on man power and because of this there are many victims occurring due to the industrial disaster. Construction industry has to overcome uncertainty of incidents and changing natural surroundings to actualize automation. Therefore, the efficient working plan and intelligent decision making process are needed to run more developed techniques and automations. Specially to decline the rate of industrial accidents occurred in basic construction in earth work, the automation via excavator is necessary and also the development of planning process system is too. This research is to establish Task Planning System to prevent disaster which is used for planning automated earth work.
Journal of Korean Society of Industrial and Systems Engineering
/
v.40
no.4
/
pp.230-236
/
2017
The recent domestic construction market is in a difficult situation due to reduction of the government's SOC budget and new orders from public-sector, and the deterioration of housing supply situation in the private sector etc. In addition, the number of disasters in the construction industry has increased in recent years with 26,570 people (up 5.7% from the previous year) in 2016, unlike other industries that are in a declining trend. As such, the construction industry has unique characteristics and problems such as high industrial accidents rate, abnormal subcontracting structure, excessive working hours and work intensity. As a result, the construction workers have a lot of job stresses. Job stress has been recognized as one of the major causes of industrial accidents and many researches have been conducted on that. However, most of the researches were about the factors that induce job stress and how these factors affect disaster occurrence, job satisfaction, job performance, turnover intentions, and job exhaustion. The purpose of this study is to investigate the effect of positive psychological capital on job stress, which is emerging as a new human resources development paradigm useful in corporate management in order to find ways to reduce job stress. To do this, 347 data collected from construction workers in Daejeon, Sejong, and Chungcheong provinces were analyzed using statistical package(IBM SPSS 22) for basic statistical analysis, reliability analysis, and regression analysis. As a result, positive psychological capital has shown an alleviate effect on job stress. In particular, the higher the optimism, hope, and resiliency of positive psychological capital, the lower the job stress. However, the higher the self - efficacy, the higher the job stress.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.