• Title/Summary/Keyword: Induce settlement

Search Result 40, Processing Time 0.026 seconds

Consolidation settlement of soil foundations containing organic matters subjected to embankment load

  • Feng, Ruiling;Wang, Liyang;Wei, Kang;Zhao, Jiacheng
    • Geomechanics and Engineering
    • /
    • v.24 no.1
    • /
    • pp.43-55
    • /
    • 2021
  • Peatland is distributed in China widely, and organic matters in soil frequently induce problems in the construction and maintenance of highway engineering due to the high permeability and compressibility. In this paper, a selected site of Dali-Lijiang expressway was surveyed in China. A numerical model was built to predict the settlement of the foundation of the selected section employing the soft soil creep (SSC) model in PLAXIS 8.2. The model was subsequently verified by the result of field observance. Consequently, the parameters of 17 types of soils from different regions in China with organic contents varying from 1.1-74.9% were assigned to the numerical model to study the settlement characteristics. The calculated results showed that the duration of primary consolidation and proportion of primary settlement in the total settlement decreased with increasing organic content. Two empirical equations, for total consolidation settlement and secondary settlement, were proposed using multiple linear regression based on the calculated results from the numerical models. The analysis results of the significances of certain soil parameters demonstrated that the natural compression index, secondary compression index, cohesion and friction angle have significant linear relevance with both the total settlement and secondary settlement, while the initial coefficient of permeability exerts significant influence on the secondary settlement only.

Effect of a 4-week Theraband Exercise with PNF Pattern on Improving Mobility, Balance and Fear of Fall in Community-Dwelling Elderly

  • Candace, Wong YH;Kennis, Cheung KW;Evelyn, Ko YC;Jeffrey, Tse HC;Margaret, Law YL;Hwang, Seong-Soo;Shirley, Ngai PC
    • Journal of the Korean Society of Physical Medicine
    • /
    • v.12 no.4
    • /
    • pp.73-82
    • /
    • 2017
  • PURPOSE: Proprioceptive Neuromuscular Facilitation (PNF) has been shown to improve body function and activity/participation in people with functional dysfunctions. This study evaluates if active exercise using theraband in PNF pattern may induce similar benefits as exercise using manual PNF pattern performed by physiotherapists on promoting mobility, balance and fear of fall in community-dwelling elderly. METHODS: Twenty-three community-dwelling elderly with independent activities of daily living were recruited and randomly allocated into either PNF group - exercise in PNF pattern by trained physiotherapists or Theraband-PNF (T-PNF) group - exercise using theraband in PNF pattern, for an hour, twice weekly for 4 weeks. Functional outcomes such as Timed Up and Go test, Elderly Mobility Scale, Berg balance scale, functional reach and subjective measures including fear of fall (FOF) scale, bodily pain in visual analogue scale were measured pre and post-program. RESULTS: Twenty-one participants completed the program. PNF group demonstrated significant within-group improvements in all subjective measures and objective measures. Similar within-group improvements were demonstrated in all outcome measures except FOFS in T-PNF group. However, no between-group differences were found in any of the outcome measures. CONCLUSION: Comparable improvements in functional outcomes in community dwelling elderly were demonstrated in both groups. As manual PNF exercise traditionally need clinicians' contact and feedback on patient which limit the training to be carried out extensively in community setting. The current findings suggest that exercise using theraband in PNF pattern is feasible to be adopted as self-practice exercise for community-dwelling elderly to induce beneficial effects on functional outcomes.

The Settlement Behavior of Dynamically Compacted High Rock Embankment (고성토 암버력 동다짐 지반의 침하거동)

  • Jie, Hong-Keun;Bae, Kyung-Tae;Noh, Jeong-Huyn;You, Kwang-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.4
    • /
    • pp.61-69
    • /
    • 2012
  • A high rock embankment by means of phased dynamic compaction has hardly carried out in Korea. Settlement of each layer is measured in order to verify the settlement behavior of dynamically compacted high rock embankment. A high rock embankment is generally constructed by dividing into several sub-embankments. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements. And second creep settlement is predicted using pre-loading test.

A study on soft soil improvement method of Seoul-Busan high-speed railway 6-2nd construction (경부고속철도 제6-2공구 노반신설 공사 중 치환공법을 통한 연약지반 처리연구)

  • Jung, Jae-Min;Im, Chang-Bin;Choi, Sang-Hen;Lee, Gwang-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1764-1773
    • /
    • 2011
  • This study is about how to handle very soft grounds consisted of coal and household garbage(organic soil), clay, silt and so on, through examining Seoul-Busan High-Speed railway 6-2nd section. The soft soil might induce long term settlement and lead to structure's differential settlement eventually. So, we performed the boring test for characteristic of railway ground, laboratory test and field survey for mechanical property. And we also collected the engineering data of ground and the data for the establishment arrangement. These data were examined thoroughly considering residual settlement and strength by high-speed railway design standard. As a result of this study, we can say high-speed railway ground must have enough bearing capacity and be settled under allowable residual settlement(10cm). And also it needs to replace soft ground with high quality sand for the fundamental solution. With the application of replacement method on this study, we expect enough condition to construct stable high-speed railway.

  • PDF

Settlement Characteristics of Soft Ground Applying the Suction Drain Method (석션드레인공법을 적용한 연약지반의 침하 특성)

  • Han, Sang-Jae;Yoo, Han-Kyu;Kim, Byung-Il;Kim, Soo-Sam
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.3
    • /
    • pp.15-27
    • /
    • 2013
  • A vacuum pressure method has been developed to solve many problems in the conventional surcharge method such as embankments, and its application has increased in the country. Recently, to control target settlements in the field, there have been many studies on the comparison of settlements between vacuum pressure method and surcharge load method in the same conditions. In this study, the settlement characteristics of soil subjected to vacuum pressure and surcharge pressure are discussed. The results indicate that if vacuum pressure is applied to the improvement of soft ground, there will be inward lateral displacement and the vacuum pressure will induce generally less settlement than a surcharge load of the same magnitude. The range of settlement reduction ratio is 0.54~0.67 based on Hooke's law, 0.91 based on field cases, 0.81 based on laboratory oedometer tests, 0.75 based on the theory of elasticity and coefficient of volumetric compressibility and 0.77~0.93 in its recent applications to the thick soft ground.

A Study on the Equivalence Requirement of WTO Retaliation (WTO 보복조치의 동등요건에 관한 연구)

  • Kang, Soo-Mi
    • Journal of Arbitration Studies
    • /
    • v.23 no.2
    • /
    • pp.81-113
    • /
    • 2013
  • The World Trade Organization (WTO) offers remedies for non-compliance by the introduction of compensation or retaliation in the Dispute Settlement Understanding (DSU). There are no the provisions under the WTO DSU and it seems unclear what retaliation is attempting to achieve. Therefore, it is unclear whether the goal of WTO retaliation is to induce compliance or to restore the balance between the rights and the obligations of WTO members. It has been claimed the WTO has a strong dispute settlement system by providing retaliation when the recommendations and rulings of Dispute Settlement Body (DSB) are not complied with. But this seems to be inadequate to bring about effective and timely compliance. Especially there is a problem with free riding by a violating member because the level of retaliation is determined from the expiration of a reasonable period of time, providing an incentive to delay compliance. Also the level of the suspension of concessions or other obligations authorized by the DSB is equivalent to the level of nullification or impairment, according to DSU Article 22.4. However, if the member concerned objections to the level of the suspension proposed, the matter shall be referred to arbitration. The arbitrator shall not examine the nature of the suspension of concessions or other obligations to be suspended but shall determine whether the level of such suspension is equivalent to the nullification or impairment. The arbitrator makes an assessment standard of equivalence by comparing the suspension of concessions or other obligations and the nullification or impairment calculated in terms of the amount of trade. But it is necessary that other standards replace the quantitative standards when the level of the nullification or impairment cannot be quantified by concrete damages.

  • PDF

Field investigation and numerical study of ground movement due to pipe pile wall installation in reclaimed land

  • Hu Lu;Rui-Wang Yu;Chao Shi;Wei-Wei Pei
    • Geomechanics and Engineering
    • /
    • v.34 no.4
    • /
    • pp.397-408
    • /
    • 2023
  • Pipe pile walls are commonly used as retaining structures for excavation projects, particularly in densely populated coastal cities such as Hong Kong. Pipe pile walls are preferred in reclaimed land due to their cost-effectiveness and convenience for installation. However, the pre-bored piling techniques used to install pipe piles can cause significant ground disturbance, posing risks to nearby sensitive structures. This study reports a well-documented case history in a reclamation site, and it was found that pipe piling could induce ground settlement of up to 100 mm. Statutory design submissions in Hong Kong typically specify a ground settlement alarm level of 10 mm, which is significantly lower than the actual settlement observed in this study. In addition, lateral soil movement of approximately 70 mm was detected in the marine deposit. The lateral soil displacement in the marine deposit was found to be up to 3.4 and 3.1 times that of sand fill and CDG, respectively, mainly due to the relatively low stiffness of the marine deposit. Based on the monitoring data and site-investigation data, a 3D numerical analysis was established to back-analyze soil movements due to the installation of the pipe pile wall. The comparison between measured and computed results indicates that the equivalent ground loss ratio is 20%, 40%, and 20% for the fill, marine deposit and CDG, respectively. The maximum ground settlement increases with an increase in the ground loss ratio of the marine deposit, whereas the associated influence radius remains stationary at 1.2 times the pipe pile wall depth (H). The maximum ground settlement increases rapidly when the thickness of marine deposit is less than 0.32H, particularly for the ground loss ratio of larger than 40%. This study provides new insights into the pipe piling construction in reclamation sites.

The difference in the slope supported system when excavating twin tunnels: Model test and numerical simulation

  • Liu, Xinrong;Suliman, Lojain;Zhou, Xiaohan;Zhang, Jilu;Xu, Bin;Xiong, Fei;Elmageed, Ahmed Abd
    • Geomechanics and Engineering
    • /
    • v.31 no.1
    • /
    • pp.15-30
    • /
    • 2022
  • Slope stability during the excavation of twin road tunnels is considered crucial in terms of safety. In this research, physical model testing and numerical analysis were used to investigate the characteristics of the settlement (uz) and vertical stresses (σz) along the two tunnel sections. First, two model tests for a (fill-rock) slope were conducted to study the settlement and stresses in presence and absence of slope support (plate support system). The law and value of the result were then validated by using a numerical model (FEM) based on the physical model. In addition, a finite element model with a slope supported by piles (equivalent to the plate) was used for comparison purposes. In the physical model, several rows of plates have been added to demonstrate the capacity of these plates to sustain the slope by comparing excavating twin tunnels in supported and unsupported slope, the results show that this support was effective in the upper part of the slope, while in the middle and lower part the support was limited. Additionally, the plates appear to induce less settlement in several areas of the slope with differing settlement and stress distribution as compared to piles. Furthermore, as a results of the previous mentioned investigation, there are many factors influence the stress and settlement distribution, such as the slope's cover depth, movement during excavation, buried structures such as the tunnel lining, plates or piles, and the interaction between all of these components.

Numerical Evaluation of Settlement Reducing Effect by Partial Reinforcement of Rock Fill (수치해석을 통한 암성토 부분보강의 침하억제 효과 평가)

  • Lee, Su-Hyung;Choi, Yeong-Tae;Han, Jin-Gyu ;Gu, Kyo-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.23-31
    • /
    • 2023
  • The escalating settlements observed in concrete slab tracks pose a significant challenge in Korea, raising concerns about their adverse impact on the safe operation of high-speed railways and the substantial costs involved in restoration. A primary contributor to these settlements is identified as the utilization of rock materials sourced from tunnel construction, incorporated into the lower subgrade without the requisite soil mixing to achieve an appropriate particle size distribution. This study employs numerical analysis to evaluate the efficacy of partial reinforcement in reducing settlements in rock-filled lower subgrades. Column-shaped reinforcement areas strategically positioned at regular intervals in the lower subgrade induce soil arching in the upper subgrade, leading to a concentration of soil loads on the reinforced areas and consequent settlement reduction. The analysis employs finite element methods to investigate the influence of the size, stiffness, and spacing of the reinforced areas on settlement reduction in the lower subgrade. The numerical results guide the formulation of an optimal design approach, proposing a method to determine the minimum spacing required for reinforcements to effectively limit settlements within acceptable bounds. This research contributes valuable insights into addressing the challenges associated with settlement in concrete slab tracks, offering a basis for informed decision-making in railway infrastructure management.

Settlement Behavior Of High Rock Embankment With Construction Path (시공이력을 반영한 고성토 암버력 지반의 침하거동 분석)

  • Bae, Kyung-Tae;Kim, Tae-Hoon;Kang, In-Kyu;Lee, Won-Je;Yu, Nam-Jae;Lee, Kang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.956-962
    • /
    • 2009
  • A high embankment is generally constructed by dividing into several sub-embankments. Unlike any soil embankment, a rock embankment is constructed by means of dynamic compaction. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements and large plate loading tests.

  • PDF