• 제목/요약/키워드: Implementation plan

검색결과 1,285건 처리시간 0.032초

농촌지역 기후변화 취약성 평가에 관한 연구 - 서천군을 대상으로 - (Climate Change Vulnerability Assessment in Rural Areas - Case study in Seocheon -)

  • 이경진;차정우
    • 농촌계획
    • /
    • 제20권4호
    • /
    • pp.145-155
    • /
    • 2014
  • Since greenhouse gas emissions increase continuously, the authorities have needed climate change countermeasure for adapting the acceleration of climate change damages. According to "Framework Act on Low Carbon, Green Growth", Korean local governments should have established the implementation plan of climate change adaptation. These guidelines which is the implementation plan of climate change adaptation should be established countermeasure in 7 fields such as Health, Digester/Catastrophe, Agriculture, Forest, Ecosystem, Water Management and Marine/Fisheries. Basically the Korean local governments expose vulnerable financial condition, therefore the authorities might be assessed the vulnerability by local regions and fields, in order to establish an efficient implementation plan of climate change adaptation. Based on this concepts, this research used 3 methods which are LCCGIS, questionnaire survey analysis and analysis of existing data for the multiphasic vulnerable assessment. This study was verified the correlation among 7 elements of climate change vulnerability by 3 analysis methods, in order to respond climate change vulnerability in rural areas, Seocheon-gun. If the regions were evaluated as a vulnerable area by two or more evaluation methods in the results of 3 methods' comparison and evaluation, those areas were selected by vulnerable area. As a result, the vulnerable area of heavy rain and flood was Janghang-eup and Maseo-myeon, the vulnerable area of typhoon was Janghang-eup, Masan-myeon and Seo-myeon. 3 regions (i.e. Janghang-eup, Biin-myeon, Seo-myeon) were vulnerable to coastal flooding, moreover Masan-myeon, Pangyo-myeon and Biin-myeon exposed to vulnerability of landslide. In addition, Pangyo-myeon, Biin-myeon and Masan-myeon was evaluated vulnerable to forest fire, as well as the 3 sites; Masan-myeon, Masan-myeon and Pangyo-myeon was identified vulnerable to ecosystem. Lastly, 3 regions (i.e. Janghang-eup, Masan-myeon and Masan-myeon) showed vulnerable to flood control, additionally Janghang-eup and Seo-myeon was vulnerable to water supply. However, all region was evaluated vulnerable to water quality separately. In a nutshell this paper aims at deriving regions which expose climate change vulnerabilities by multiphasic vulnerable assessment of climate change, and comparing-evaluating the assessments.

유보통합 실행계획안에 따른 0~5세 영유아교육과정 운영 및 0~5세 영유아 교원 양성 타당성 (Feasibility of operating a curriculum for young children aged 0 to 5 years old and training teachers for young children aged 0 to 5 years old according to the early childhood education and care integration implementation plan)

  • 박지희;김대욱
    • 문화기술의 융합
    • /
    • 제10권5호
    • /
    • pp.601-608
    • /
    • 2024
  • 유보통합이 진행중이다. 이에 따라, 0~5세 영유아교육과정 개발이 필요하다. 2024년 6월 유보통합 실행계획안이 발표되었다. 0~5세 영유아교육과정 운영이 제시되었다. 0~2세와 3~5세 교육과정이 내용에서 비슷하며 동일한 기준으로 개발되었기 때문에 합쳐지는 것이 자연스럽다. 교육과정을 합칠 때 교육과정의 내용, 교원 자격, 재정을 함께 고민할 필요가 있다. 0~5세 영유아교육과정이 개발됨에 따라 교원자격도 0~5세 영유아교사로 설정되어야 한다. 연구의 결론은, 먼저, 교육과정을 0~5세 영유아교육과정으로 일원화한다. 다음으로, 0~5세 영유아교육과정을 가르칠 교사들은 0~5세 영유아교사로 양성해야 한다.

유조선의 부두 하역 작업시 접지 안전성 연구와 적용

  • 백명기;조원철;이태식
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.771-774
    • /
    • 2008
  • 본 논문에서는 유조선의 부두 하역 작업시 일반적으로 사용하고 있는 접지의 위험성에 대해 고찰해 보고, 유조선박 작업시 접지 위험성에 대한 안전 대책을 수립한다. 또한, 안전 대책에 따른 실 적용 방법을 보여줌으로써, 현업 적용을 돕고자 한다.

  • PDF

GSI(Global Single Instance)기반의 Global ERP 구축 방법론 및 적용 사례 (A Methodology for Global ERP Implementation Based on GSI(Global Single Instance) and Its Application)

  • 이재광;조민호
    • 한국IT서비스학회지
    • /
    • 제7권3호
    • /
    • pp.97-114
    • /
    • 2008
  • Many companies have implemented ERP systems to enhance their process competitiveness. Since most ERP systems down to date are implemented and managed on each separated business-unit or company level, such systems run short of the consideration about global business processes and global system managements. In order to integrate a successful global ERP, it is essential to apply the well-systematic implementation methodology which considers global standardization and global IT requirements. It is, however, the actual circumstance that such well-structured methodologies for global ERP implementation are hardly shown not only from domestic site but from foreign one. This paper indicates the global ERP implementation guideline with integrated approach including; the standard process design for efficient execution of global business; the ERP implementation method considering global IT requirements; and, the management method for global system operation. GSI ERP methodology is composed of 3 Phase:Global Strategy Planning, Global Template Construction and Global Roll-Out. Phase1; Global Strategy Planning contains Environment Analysis, GSI direction and Implementation Plan. Phase2; Global Template Construction contains Business blueprint, GSI operation design and Global template implementation. Phase3; Global Roll-out contains local business analysis, local ERP implementation and Global ERP Operation.

주택성능등급표시제도의 개선을 위한 인정 단지의 사업계획변경 현황에 대한 실태조사 연구 (A Study on the Business Plan Changes of Housing Complex evaluated by the "Housing Performance Grading Indication System")

  • 이성옥;배철학
    • KIEAE Journal
    • /
    • 제11권6호
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze on the change status in the project plan of the housing complex as evaluated through the Housing Performance Grading Indication System. This a a system for assessing quantitatively the comprehensive, unified performance of housing by an objective standard from the design stage since January 9, 2006. As housing is a composite with various performances, it is required necessary to objectively assess the various performances from the design stage for building better housing. Thus, this study analyzed the change status and objectively described objectively it centering on the construction and structure drawings for 12 items posted in the Facility Management System_(FMS) out of examples recognized by 2011 since the implementation of the system. The changes were analyzed though observing each performance item-specific characteristics and confirming the books approved for use. In various parts, such as the site area, landscape plan, plane plan for unit, supplementary welfare facility plan, finishing materials, window size and location, the project plan was changed. These changes may result in a grading change in of the performance items of the system. This study purpose is for it to be used as a basic resource required for future system development by supplementing the limitation of the design phase and then through playing a basic role for the assessment after completion.

수질오염총량관리제 시행에 있어서 중앙정부와 지방자치단체 간 역할정립 (Establishment of Role Between Central and Local Government for Implementation of Total Maximum Daily Load)

  • 이상진
    • 대한환경공학회지
    • /
    • 제33권5호
    • /
    • pp.378-383
    • /
    • 2011
  • 수질오염총량관리제는 유역에 설정된 오염물질 항목별 목표수질을 만족할 수 있도록 배출부하량을 총량적으로 관리하기 위해서 도입되었다. 그 동안 4대강 수계를 대상으로 수질오염총량관리제를 시행하면서 여러 가지 문제점이 발생되었다. 이러한 문제점들이 일부 보완되었지만, 아직도 중앙정부와 지방자치단체간의 역할에 대한 부분은 명확하게 정립되어 있지않다. 따라서 본 연구는 수질오염총량관리제의 효율적인 시행을 위한 중앙정부와 지방자치단체간의 역할을 제시하였다. 먼저, 중앙정부는 국가하천의 주요지점에 수질기준 및 대상항목을 포함하는 환경기준을 설정하고, 지방자치단체는 해당유역에서 대상항목의 목표수질을 설정해야 한다. 또한, 지방자치단체는 지류하천의 수질개선정도를 파악하기 위하여 하천의 수질 및 유량모니터링을 지속적으로 시행하여야 한다. 특히, 중앙정부의 유역환경청은 전체 수계를 대상으로 수질오염총량관리 기본계획을 수립하여야 하며, 지방자치단체는 목표수질을 초과하는 단위유역을 대상으로 시행계획을 수립하여야 한다. 수질 오염총량관리 이행평가는 기초자치단체에서 지류하천의 수질 및 유량을 모니터링을 통하여 매년마다 단위유역의 목표수질 만족여부 만을 평가해야 한다. 수질오염총량관리 이행평가보고서는 단위유역의 목표수질 초과에 대한 원인분석을 포함하여 계획기간 최종년도에 유역환경청에 제출하여야 한다.

스톡홀름시의 혼잡통행료 징수 체계

  • 변완희;김희삼
    • 교통기술과정책
    • /
    • 제1권2호
    • /
    • pp.71-84
    • /
    • 2004
  • In Europe, London, Edinbergh, Copenhagen has adopted the traffic congestion charge system, and now the Stockholm City Council started the implementation of a similar system of its own. According to the Swedish National Road Administration, the system implementation starts in 2004 and will be completed by 2005, and so starting 2006, this charge system will be running as planned. Unlike the system of London, that of Stockholm charges the drivers differently depending on when to pass a control point, and not only that, the City Council has a plan to adopt the emerging RFID technology. Following is the summary of both technical and policy-wise considerations of the traffic congestion charge system in Stockholm, Sweden.

  • PDF

한국기업의 ERP관리 이슈에 관한 탐색적 연구 -A사의 사례를 중심으로- (A Study on the Determination of Key Issues in the ERP - enabled BPR Implementation in Korea)

  • 김효근;성종선;강소라
    • Journal of Information Technology Applications and Management
    • /
    • 제9권2호
    • /
    • pp.81-106
    • /
    • 2002
  • As more organizations undertake IT-enabled business process reengineering(BPR), IT-enabled BPR projects become a major concern. Especially, one of IT, Enterprise Resource Planning System (ERP) is recognized as a revolution solution. But the success cases of ERP project are rarely reported. In this study, ERP implementation is defined as a IS implementation project based on BPR concepts To explore the issues of implementing ERP systems, a company implementing ERP successfully in Korea is selected. The research framework consists of four components: 1) strategic plan dimension , 2) organizational environment dimension, 3) implementation process dimension, and 4) IT dimension. On this framework, to implement ERP systems successfully, the analysis of the results clearly suggests appropriate planning, top management support, change management, appropriate methodology , ERP specialist commitment, management of standard process and master data, and the extent of IT localization.

  • PDF

가로주택정비사업의 사업시행 지연요인에 관한 연구 - 인천광역시 사례를 중심으로 - (A Study on Implementation Delay Factors of the Block-unit Housing Renewal Project - Focused on the Incheon Metropolitan City -)

  • 한영훈;나인수
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.32-40
    • /
    • 2022
  • The block-unit housing renewal project was presented as an alternative method to overcome the side effects of large-scale renewal projects while improving poor residential conditions. However, projects implementation is prolonged and even the pace of projects, which was considered an various incentives, is being delayed for the most part. In this study, delay factors are drawn by eight; conflict among association members, contract delay of joint implementation, participation paucity of constructor, inadequate project guidelines, alteration of project plan, lack of renewal project professionals, stricter loan restriction of HUG, lack of capacity of project operator. We categorized those eight factors to three aspects such as implementation, participants and proposition and suggested improvement alternatives according to three aspects.

기후변화 대응계획 도시사례 비교연구: 창원시와 포틀랜드시를 대상으로 (Comparative Case Study on Urban Climate Change Plans)

  • 최준성;박천보
    • 한국산학기술학회논문지
    • /
    • 제15권1호
    • /
    • pp.539-546
    • /
    • 2014
  • 본 논문에서는 기후변화에 선도적으로 대처하고 있는 도시적 차원의 기후변화 대응사례를 연구하고 시사점을 도출하였다. 우리나라 창원시와 미국의 포틀랜드시를 선정하여 기후변화 대응계획을 대상으로 비교분석을 수행하였으며, 분석의 관점은 계획의 구성체계, 기후변화 대응의 방법, 정책의 이행의 측면에서 이루어졌다. 두 도시의 기후변화 대응사례를 분석 비교한 결과 다음과 같은 시사점을 발견하였다. 첫째, 목표부터 부문, 정책이나 사업 등에 이르기까지의 전체 구조와 추구하는 내용들이 보다 간단하고 명확해야 한다. 시민주도형으로 추진되는 정책들과 지자체부터 우선적으로 시행하는 사업을 확대할 필요가 있다. 둘째, 온실가스배출이 많은 부문들에 대해서는 집중적인 현황 및 원인분석 등을 토대로 보다 구체적이고 다양한 정책들을 마련할 필요가 있다. 적응대책의 수립 시 기후변화대응 취약지역과 부문에 대한 면밀한 준비계획을 세워야하며 이를 토대로 의료서비스와 재난관리를 위한 예산과 정책들을 마련할 필요가 있다. 셋째, 이행의 측면에서 정책의 보다 효율적인 진행을 위해서는 단기, 중기, 장기적인 목표와 계획체계를 수립하여야 하고 정책들의 이행여부를 지속적으로 관찰할 수 있는 평가체계를 구축할 필요가 있다.