KSII Transactions on Internet and Information Systems (TIIS)
/
제18권4호
/
pp.1042-1058
/
2024
Terahertz (THz) communication is becoming a key technology for future 6G wireless networks because of its ultra-wide band. However, the implementation of THz communication systems confronts formidable challenges, notably beam splitting effects and high computational complexity associated with them. Our primary objective is to design a hybrid precoder that minimizes the Euclidean distance from the fully digital precoder. The analog precoding part adopts the delay-phase alternating minimization (DP-AltMin) algorithm, which divides the analog precoder into phase shifters and time delayers. This effectively addresses the beam splitting effects within THz communication by incorporating time delays. The traditional digital precoding solution, however, needs matrix inversion in THz massive multiple-input multiple-output (MIMO) communication systems, resulting in significant computational complexity and complicating the design of the analog precoder. To address this issue, we exploit the characteristics of THz massive MIMO communication systems and construct the digital precoder as a product of scale factors and semi-unitary matrices. We utilize Schatten norm and Hölder's inequality to create semi-unitary matrices after initializing the scale factors depending on the power allocation. Finally, the analog precoder and digital precoder are alternately optimized to obtain the ultimate hybrid precoding scheme. Extensive numerical simulations have demonstrated that our proposed algorithm outperforms existing methods in mitigating the beam splitting issue, improving system performance, and exhibiting lower complexity. Furthermore, our approach exhibits a more favorable alignment with practical application requirements, underlying its practicality and efficiency.
Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
Journal of Construction Engineering and Project Management
/
제5권2호
/
pp.11-15
/
2015
The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).
본 연구는 문화기반 마을공동체가 어떻게 고유의 공동체 문화를 형성하고, 지속가능한 성숙한 공동체가 되는지 파악하기 위해 정책대상자의 인식, 정서, 역량에 대해 살펴보았다. 공동체의 개념, 공동체 성장요인 및 성장단계, 문화활동, 그리고 정책 집행이론에 대한 선행연구를 살펴보고, 문화기반 마을공동체 사업에 적합한 정책집행 분석모형을 도출하였다. 연구방법은 질적사례연구방법을 채택하였고, 연구대상은 안산 사동 '감골주민회', 안산 대부동 '상동공동체', 안동 신세동 '그림애문화마을'로 문화기반 마을공동체의 성공사례를 선정하였다. 심층인터뷰와 문헌분석, 직접관찰을 통해 얻은 자료를 로버트 인(2009)이 제시한 패턴매칭, 사례통합 분석기법을 활용하여 분석하였다. 연구결과는 첫째, 정책대상자는 공동체 활동을 통해 신뢰와 정서적 친밀감, 소속감을 느끼는 정서적 변화를 겪으며, 지역에 대한 애착심이 향상되었다. 둘째, 정책대상자의 공동체 의식과 공동체 역량이 성장에 중요한 요인으로 나타났다. 공동체 활동을 통해 참여유도, 상호교류, 역량강화, 파트너쉽의 단계를 거치며 성장해나가고 있음을 알 수 있었다. 셋째, 다양한 창의적 문화활동을 통해 스스로를 표현하면서 자신을 재발견하고, 타인과 소통하면서 마을공동체의 공통적 고민과 사회적 문제를 해결하는 경험을 하는 것으로 나타났다. 본 연구는 문화기반 마을공동체에 대한 생태학적 접근 연구를 기반으로 정책집행 분석 모형을 도출하였고, 문화기반 마을공동체의 사례를 분석하여 공동체의 성장 방향성과 실천적 함의를 제시하였다.
최근에 전력계통의 안정 및 고품질화에 대한 요구가 증대되기 시작하였고, 이에 따라 향상된 전력변환기술과 대체에너지원을 이용한 계통연계형 시스템에 대한 연구가 활발히 진행되고 있다 이러한 시스템에서의 인버터의 효율은 매우 중요하다. 따라서 본 논문에서는 이러한 계통연계형 시스템을 고효율화 하기 위한 방법으로 소프트-스위칭 기법이 적용 가능한 전류제어형 인버터를 제안하였다. 또한, 소프트-스위칭 기법을 적용할 수 있는 전류제어 알고리즘과 ZVT 동작원리를 이론적으로 해석하였고 이의 유용성을 시뮬레이션과 실험을 통하여 입증하였다.
Currently, there is a great interest in the coupling between multiphase fluid flow and geomechanical effects in hydrocarbon reservoirs and surrounding rocks. The ideal solution for this coupled problem is to introduce the geomechanical effects through the stress analysis solution and implement an algorithm, which assures that the equations governing the flow and stress analyses are obeyed in each time step. This paper deals with the implementation of a program (FORTRAN90 interface code), which was developed to couple conventional reservoir (ECLIPSE) and geomechanical (ABAQUS) simulators, using a partial coupling algorithm. The explicit coupled hydro-mechanical behavior of Iranian field during depletion and $CO_2$ injection is studied using the soils consolidation procedure available in ABAQUS. Time dependent reservoir pressure fields obtained from three dimensional compositional reservoir models were transferred into finite element reservoir geomechanical models in ABAQUS as multi-phase flow in deforming reservoirs cannot be performed within ABAQUS. The FEM analysis of the reservoir showed no sign of plastic strain under production and $CO_2$ injection scenarios in any part of the reservoir and the stress paths do not show a critical behavior.
Choi, Duk-Gun;Kim, Min-Hyuk;Jeong, Jin-Hee;Jung, Ji-Won;Bae, Jong-Tae;Choi, Seok-Soon;Yun, Young
ETRI Journal
/
제29권3호
/
pp.363-370
/
2007
In this paper, we propose a flexible turbo decoding algorithm for a high order modulation scheme that uses a standard half-rate turbo decoder designed for binary quadrature phase-shift keying (B/QPSK) modulation. A transformation applied to the incoming I-channel and Q-channel symbols allows the use of an off-the-shelf B/QPSK turbo decoder without any modifications. Iterative codes such as turbo codes process the received symbols recursively to improve performance. As the number of iterations increases, the execution time and power consumption also increase. The proposed algorithm reduces the latency and power consumption by combination of the radix-4, dual-path processing, parallel decoding, and early-stop algorithms. We implement the proposed scheme on a field-programmable gate array and compare its decoding speed with that of a conventional decoder. The results show that the proposed flexible decoding algorithm is 6.4 times faster than the conventional scheme.
This paper describes design and implementation of the 5.5 GHz VCO with parallel-branch inductors using 0.8${\mu}m$ SiGe HBT process technology. The proposed parallel-branch inductor shows $12 \%$ improvement in quality factor in comparison with the conventional inductor. A phase noise of -93 dBc/Hz is measured at 100 kHz offset frequency, and the harmonics in the VCO are suppressed less than -23 dBc. The single-sided output power of the VCO is -6.5$\pm$1.5 dBm. The manufactured VCO consumes 15.0 mA with 2.5 V supply voltage. Its chip areas are 1.8mm ${\times}$ 1.2mm.
This paper presents a design and parallel control strategy of 1.8 kW low-voltage DC-DC converter (LDC) for mild hybrid electric vehicles to improve their power density, system efficiency, and operation stability. Topology and control scheme are important on the LDC for mild hybrid electric vehicles to achieve high system efficiency and power density because of their very low voltage and large current in input and output terminals. Therefore, the optimal topological structure and control algorithm are examined, and a detailed design methodology for the power and control stages is presented. A working sample of 1.8 kW LDC is designed and implemented by applying the adopted topology and control strategy. Experimental results indicate 92.45% of the maximum efficiency and 560 W/l of power density.
This paper presents a user programmable computational/control platform developed to conduct real-time hybrid simulation (RTHS). The architecture of this platform is based on the integration of a real-time controller and a field programmable gate array (FPGA).This not only enables the user to apply user-defined control laws to control the experimental substructures, but also provides ample computational resources to run the integration algorithm and analytical substructure state determination in real-time. In this platform the need for SCRAMNet as the communication device between real-time and servo-control workstations has been eliminated which was a critical component in several former RTHS platforms. The accuracy of the servo-hydraulic actuator displacement control, where the control tasks get executed on the FPGA was verified using single-degree-of-freedom (SDOF) and 2 degrees-of-freedom (2DOF) experimental substructures. Finally, the functionality of the proposed system as a robust and reliable RTHS platform for performance evaluation of structural systems was validated by conducting real-time hybrid simulation of a three story nonlinear structure with SDOF and 2DOF experimental substructures. Also, tracking indicators were employed to assess the accuracy of the results.
The purpose of this study is to conduct researches on the aspects of reconstruction and remodeling of low-rise, dilapidated apartment buildings in the provinces, using comparative methodologies, consequently coming up with the findings in the following. 1) Unlike the rebuilding projects in which the movement process tends to be made in a bulk (in a simultaneous manner), it turns out that when it comes to remodeling, it would be advisable to attempt moving the inhabitants as a group either by the size of their residence or by the building. 2) Given the peculiarities of the construction management mechanism, remodeling projects might seem disadvantageous on the part of the management on account of inadequate accumulation of information and experience. Hence, based on the impeccable assessment of the current status of the subject buildings from the phase of planning, its imperative to closely look into and take into consideration a variety of direct and/or indirect factors in advance of the implementation. 3) A series of comparative researches from the perspective of economical efficiency that remodeling projects appear profitable considering the overall costs including financial expenses, varied taxes, and so on that will be eventually brought forth during the reconstruction period, and all the more so when allowing for the consequential effects which they ought to have upon the natural and human resources, environmental and ecological condition, business potentials, etc. Amelioration to be desired on the basis of the findings above.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.