• Title/Summary/Keyword: Impact assessment

Search Result 4,090, Processing Time 0.033 seconds

An Analysis of Potential Environmental Impact Reduction for Combined Sewer Overflow Project using a LCA Methodology (LCA 기법을 활용한 합류식 하수도 월류수 사업의 잠재적 환경영향 저감효과 분석)

  • Jo, Hyun-Jung;Song, Jang-Hwan;Hwang, Yong-Woo;Park, Ji-Hyoung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.6
    • /
    • pp.885-892
    • /
    • 2011
  • In this study, LCA(Life Cycle Assessment) on 'Saemangum CSO Project' was carried out to evaluate environmental impact which occurred during the construction and operation periods and the potential environmental impact reduction was analyzed by comparing production and reduction level of pollution loads. LCA was conducted out according to the procedure of ISO14040 which suggested Goal and Scope Definition, Life Cycle Inventory Analysis, Life Cycle Impact Assessment and Interpretation. In the Goal and Scope Definition, the functional unit was 1 m3 of CSO, the system boundary was construction and operation phases, and the operation period was 20 years. For the data collection and inventory analysis, input energies and materials from civil, architecture, mechanical and electric fields are collected from design sheet but the landscape architecture field is excepted. LCIA(Life Cycle Impact Assessment) was performed following the procedure of Eco-Labelling Type III under 6 categories which were resource depletion, eutrophication, global warming, ozone-layer destruction, and photochemical oxide formation. In the result of LCA, 83.4% of environmental impact occurred in the construction phase and 16.6% in the operation phase. Especially 78% of environmental impact occurred in civil works. The Global warming category showed the highest contribution level in the environmental impact categories. For the analysis on potential environmental impact reduction, the reduction and increased of environmental impact which occurred on construction and operation phases were compared. In the case of considering only the operation phase, the result of the comparison showed that 78% of environmental impact is reduced. On the other hand, when considering both the construction and operation phases, 50% of environmental impact is increase. Therefore, this study showed that eco-friendly material and construction method should be used for reduction of environmental impact during life cycle, and it is strongly necessary to develop technology and skills to reduce environmental impact such as renewable energies.

Application of the Risk-Based Analysis to EIA (환경영향평가에 있어 위해성분석 기법의 도입)

  • Chung, Yong
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.1-8
    • /
    • 1995
  • In generally speaking, the purpose of Environmental Impact Assessment(EIA) is to give the environment its due place in the decision-making process by clearly ealuating the environmental consequence of a proposed activity before action is taken. The introduction of conventional EIA is to be seen as an end product of a very long evolutionary process, starting with rudimentary but evolving pollution control measures for air, water, noise, land and chemicals, each governed by separate, and separately administered pieces of legislation. In EIA process, the measures of status, scoping, proposed mitigation and communication have not been very quantitative in their significancy. Of course, the determinations have uncertainity in the implications for significant impacts. To improve the determination of significant impacts, some more comprehensive methodologies of EIA has been proposed with the concepts of risk analysis in the proposed projects. The concepts of risk analysis has been introduced to the expression of human health impairment due to environmental pollutants since the early 1980's. The risk analysis being meant by the statistical significance of impact has a process quantitatively considering uncertainities and importances of ecological systems and human health as well. The process of risk analysis shows assessment, doseresponse in toxicity, exposure assessment and risk characterization. With the risk assessment, it could be suggested for the proper measurements against their anticipated risk in the EIA. This paper deals the priciples developing process and application of the risk-based analysis in EIA.

  • PDF

A Study on Assessment Standard for Environmental Impact Assessment (한국에서의 환경영향평가 평가기준에 대한 연구)

  • Lee, Mu-Choon
    • Journal of Environmental Impact Assessment
    • /
    • v.2 no.2
    • /
    • pp.111-116
    • /
    • 1993
  • The EIA system was developed during ten odd years of introduction. On the other hand, the contentional development representing systematical fidelity does not match to it. I surveyed the problems of EIA on the point of environmental items with no legal standards. EIA is being executed only once on the planning stage. If the present EIA system has two times of execution, the quality of EIA will be much better. First, on the stage of deciding location of the project, EIA should be done. And next, detailed EIA should be done on the stage of executing the project. To describe the problems of EIA, I surveyed the legislations on the point of the former stages, investigation of present status and anticipation. And I tried a theoretical approach to EIA. The knowledge of things, the subject's standpoint and his valuation are all put together in the EIA. The knowledge of relationship between air and water pollutants and their impact on human is accumulated much. On the other hand, the knowledge of the compounded item, fauna-flora(natural ecology) is partial and causes many difficulties. I pointed out the absurdities of assessment technique dealing the standards and introduced assessment technique being applied to items with no physico-chemical standards such as wild lives.

  • PDF

Comparison of the Incineration Processes of Domestic Wastes Based on Life Cycle Assessment (생활폐기물(生活廢棄物) 소각(燒却) 처리공정(處理工程)의 전과정(全科程) 평가(平價)에 의한 비교(比較))

  • Jung, Woo-Jung;Lee, Sang-Don;Kim, Dong-Su
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.6
    • /
    • pp.443-453
    • /
    • 2005
  • For the purpose of the comparative environmental estimation of the incineration processes for domestic wastes, environmental impacts for several incineration processes for one ton of domestic wastes have been estimated by employing life cycle assessment as the environmental impact assessment method. The scheme of minimum production of environmental pollutants has been considered for three different incineration processes. The evaluation for latent influence on environment was carried out by using CML(Center of Environmental Science) method which was developed by University of Leyden in Netherlands based on the equivalency factor suggested by Korea Accreditation Board. The result of life cycle assessment has showed that the total cost analysis according to the amount of incinerating waste was dependent on the operating conditions of incineration process. In addition, the annual running cost for the incineration of one ton of wastes was estimated to be negatively dependent on the amount of wastes. The degree of environmental pollution was mainly due to the kinds of the wastes rather than by the amount of wastes.

Development of Outage Cost Impact Index Function of Electricity Energy and Outage Cost Assessment using WOROCAIS (전력에너지 공급지장비의 충격도지수 함수개발 및 WOROCAIS를 이용한 이의 추정에 관한 연구)

  • Lim, Jin-Taek;Choi, Jae-Seok;Jeon, Dong-Hoon;Seo, Chul-Soo;Lee, Jae-Gul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.8
    • /
    • pp.1066-1073
    • /
    • 2013
  • This paper illustrates newly an outage cost impact index function(OCIIF). The assessment of the OCIIF is described using the Web Based Online Real-time Outage Cost Assessment and Information System(WOROCAIS) for power system outage cost assessment in Korea. The proposed OCIIF is not absolute but relative outage cost impact index function in view point of outage time using web based survey method for outage cost assessment. While conventional methodology does not consider short time outage cost assessment, the proposed OCIIF reflects short time outage. SCOF(Sector Customer Outage Function) in stead of the traditional SCDF(Sector Customer Damage Function) is defined and proposed newly in this paper. Based the SCOF, AVLL(Average Value of Loss Load) is newly proposed. The OCIIF is demonstrated by WOROCAIS in case study around 2,000 sample data surveyed by KEPCO in South Korea in recent.

Design and Application of an Analysis-frame Linking EIA and CBA (환경영향평가와 비용편익분석의 연계를 위한 분석 틀 설계 및 적용)

  • Ahn, So-Eun;Kim, Ji-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.4
    • /
    • pp.565-574
    • /
    • 2011
  • This paper aims to design a policy-assessment tool liking the Environmental Impact Assessment(EIA) and the Cost Benefit Analysis (CBA). As a step towards the incorporation of environmental and economic considerations, the approach used herein takes the form of integrating quantitative information on environmental benefits and costs associated with implementing the project into the existing framework of the EIA. Our case study is an project appraisal of a solar energy plant. It is confirmed that the technique is operational, however, there are certain limitations for a complete assessment. The difficulty mainly originated from the omission of important information from each step of the valuation process. Alternatively stated, some environmental services are not identified, nor quantified, and nor monetized in the process. More case studies are warranted in the future along with elaboration in methodology of techniques. In addition, the construction of a database on environmental values will be required to accumulate reliable and systematized data. These are the necessary conditions to improving quality in application of techniques as well as providing comprehensive and balanced information to decision makers.

Numerical analysis on dynamic response and damage assessment of FRP bars reinforced-UHPC composite beams under impact loading

  • Tao Liu;Qi M. Zhu;Rong Ge;Lin Chen;Seongwon Hong
    • Computers and Concrete
    • /
    • v.34 no.4
    • /
    • pp.409-425
    • /
    • 2024
  • This paper utilizes LS-DYNA software to numerically investigate impact response and damage evaluation of fiber-reinforced polymer (FRP) bars-reinforced ultra-high-performance concrete (UHPC) composite beams (FRP-UHPC beams). Three-dimensional finite element (FE) models are established and calibrated by using literature-based static and impact tests, demonstrating high accuracy in simulating FRP-UHPC beams under impact loading. Parametric analyses explore the effects of impact mass, impactor height, FRP bar type and diameter, and clear span length on dynamic response and damage modes. Two failure modes emerge: tensile failure with bottom longitudinal reinforcement fracture and compression failure with local concrete compression near the impact region. Impact mass or height variation under the same impact energy significantly affects the first peak impact force, but minimally influences peak midspan displacement with a difference of no more than 5% and damage patterns. Increasing static flexural load-carrying capacity enhances FRP-UHPC beam impact resistance, reducing displacement deformation by up to 30%. Despite similar static load-carrying capacities, different FRP bars result in varied impact resistance. The paper proposes a damage assessment index based on impact energy, static load-carrying capacity, and clear span length, correlating well with beam end rotation. Their linearly-fitting coefficient was 1.285, 1.512, and 1.709 for the cases with CFRP, GFRP, and BFRP bars, respectively. This index establishes a foundation for an impact-resistant design method, including a simplified formula for peak midspan displacement assessment.

Life cycle impact assessment of the environmental infrastructures in operation phase: Case of an industrial waste incineration plant

  • Kim, Hyeong-Woo;Kim, Kyeong-Ho;Park, Hung-Suck
    • Environmental Engineering Research
    • /
    • v.22 no.3
    • /
    • pp.266-276
    • /
    • 2017
  • A life cycle impact assessment was applied in an industrial waste incineration plant to evaluate the direct and indirect environmental impacts based on toxicity and non-toxicity categories. The detailed life cycle inventory of material and energy inputs and emission outputs was compiled based on the realistic data collected from a local industrial waste incineration plant, and the Korean life cycle inventory and ecoinvent database. The functional unit was the treatment of 1 tonne of industrial waste by incineration and the system boundary included the incineration plant and landfilling of ash. The result on the variation of the impact by the unit processes showed that the direct impact was decreased by 79.3, 71.6, and 90.1% for the processes in a semi dry reactor, bag filter, and wet scrubber, respectively. Considering the final impact produced from stack, the toxicity categories comprised 91.7% of the total impact. Among the toxicity impact categories, the impact in the eco-toxicity category was most significant. A separate estimation of the impact due to direct and indirect emissions showed that the direct impact was 97.7% of the total impact. The steam recovered from the waste heat of the incineration plant resulted in a negative environmental burden.

A Study on the landscape impact assessment in evaluating the environment impact of the urban development projects (도시개발사업에 대한 환경영향평가에서 경관영향분석 사례 연구 - 경관영향평가를 위한 3D Simulation 기법의 활용을 중심으로-)

  • Lee, Min Hoon;Cho, Byung Ho;Lim, Young Teak;Choi, Bong Moon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.22-26
    • /
    • 2007
  • In this study we had chosen the examples of the development projects, so that examined about the process of the landscape impact assessment and the detail evaluation items. Especially the part of the leisure facilities and the landscape aspects among the evaluation items were reviewed whether followed the process of environment impact assessment or not, whether the impact estimate, and depreciation scheme according to the present condition and enforcement of the actual development projects perform reasonably or not. From the study, derived the improvement on the landscape impact evaluation using with 3D Simulation method is expected to contribute to the valid landscape impact assessment and the reasonable alternative proposal.

  • PDF

Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects (주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안)

  • Lee, Sang-Don
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.4
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.